{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"3609005","name":"Ondo Extension Mine","status":"Abandoned","status_date":"2018-06-26","mine_type":"Surface","coal_metal":"C","commodity":"Coal (Bituminous)","state":"PA","county":"Indiana","nearest_town":"Brush Valley","operator_id":"P09635","operator_name":"Rosebud Mining Company","controller_id":"C07485","controller_name":"J Clifford  Forrest III","district":"C03","office":"Indiana PA Field Office","employees":0,"latitude":40.560833,"longitude":-79.085833},"coverage":{"contributingSources":17,"registeredSources":20,"sourceRows":5274},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"3609005","name":"Ondo Extension Mine"},"operator":{"type":"operator","id":"P09635","name":"Rosebud Mining Company"},"controller":{"type":"controller","id":"C07485","name":"J Clifford  Forrest III"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C07485","name":"J Clifford  Forrest III"},"object":{"type":"mine","id":"3609005","name":"Ondo Extension Mine"},"validFrom":"1979-08-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|C07485|1979-08-01|"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C12752","name":"American Metals & Coal International Inc"},"object":{"type":"mine","id":"3609005","name":"Ondo Extension Mine"},"validFrom":"1992-01-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|C12752|1992-01-01|"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15854","name":"Marvin D  Phillips Jr"},"object":{"type":"mine","id":"3609005","name":"Ondo Extension Mine"},"validFrom":"1999-04-05","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|C15854|1999-04-05|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P21782","name":"Senate Coal Mines Inc"},"object":{"type":"mine","id":"3609005","name":"Ondo Extension Mine"},"validFrom":"2001-08-01","validTo":"2002-03-14","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|P21782|2001-08-01|2002-03-14"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C12752","name":"American Metals & Coal International Inc"},"object":{"type":"operator","id":"P21782","name":"Senate Coal Mines Inc"},"validFrom":"2001-08-01","validTo":"2002-03-14","current":false,"derived":true,"evidenceMineId":"3609005","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|P21782|2001-08-01|C12752|1992-01-01|87783"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P24256","name":"Anita Mining Company"},"object":{"type":"mine","id":"3609005","name":"Ondo Extension Mine"},"validFrom":"2002-03-15","validTo":"2003-03-10","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|P24256|2002-03-15|2003-03-10"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15854","name":"Marvin D  Phillips Jr"},"object":{"type":"operator","id":"P24256","name":"Anita Mining Company"},"validFrom":"2002-03-15","validTo":"2003-03-10","current":false,"derived":true,"evidenceMineId":"3609005","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|P24256|2002-03-15|C15854|1999-04-05|97115"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0051231","name":"AMFIRE Mining Company LLC"},"object":{"type":"mine","id":"3609005","name":"Ondo Extension Mine"},"validFrom":"2003-03-11","validTo":"2014-12-29","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|0051231|2003-03-11|2014-12-29"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"mine","id":"3609005","name":"Ondo Extension Mine"},"validFrom":"2003-03-11","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|0041211|2003-03-11|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"operator","id":"0051231","name":"AMFIRE Mining Company LLC"},"validFrom":"2003-03-11","validTo":"2014-12-29","current":false,"derived":true,"evidenceMineId":"3609005","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|0051231|2003-03-11|0041211|2003-03-11|1708"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P09635","name":"Rosebud Mining Company"},"object":{"type":"mine","id":"3609005","name":"Ondo Extension Mine"},"validFrom":"2014-12-30","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|P09635|2014-12-30|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C07485","name":"J Clifford  Forrest III"},"object":{"type":"operator","id":"P09635","name":"Rosebud Mining Company"},"validFrom":"2014-12-30","validTo":null,"current":true,"derived":true,"evidenceMineId":"3609005","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3609005|P09635|2014-12-30|C07485|1979-08-01|74789"}}],"coverage":{"historyRecords":4,"edgeCount":12,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":78,"firstDate":"2002-11-14","lastDate":"2015-04-10","metrics":{"daysLost":2153,"injuries":69,"fatalities":0,"recentRows":0,"restrictedDays":152,"contractorRecords":6},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"273736","DOCUMENT_NO":"220151140002","ACCIDENT_DT":"04/10/2015","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"Roof fall occurred right at the pit mouth at end of canopy where you start underground. Best contributing factors to my knowledge would be years of weathering on roof and lots of rain that week. Fall occurred on intake entry. Still had plenty of air going over fall to ventilate intake travelway.","sourceDate":"2015-04-10"},{"SOURCE_ROW_NUMBER":"84558","DOCUMENT_NO":"220150550011","ACCIDENT_DT":"02/18/2015","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"while cleaning hawkeye on belt system target roller hit the  middle finger of left hand and cause a laceration","sourceDate":"2015-02-18"},{"SOURCE_ROW_NUMBER":"157646","DOCUMENT_NO":"220150440026","ACCIDENT_DT":"02/12/2015","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDTOOLS (NONPOWERED)","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Laborer, Bull gang,  Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"While cutting mesh screen with utility knife. the knife slipped and lacerated left arm.","sourceDate":"2015-02-12"},{"SOURCE_ROW_NUMBER":"265240","DOCUMENT_NO":"220150340001","ACCIDENT_DT":"01/23/2015","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"Water in roof","sourceDate":"2015-01-23"},{"SOURCE_ROW_NUMBER":"248018","DOCUMENT_NO":"220142870048","ACCIDENT_DT":"09/25/2014","DEGREE_INJURY":"ALL OTHER CASES (INCL 1ST AID)","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Over-exertion NEC","OCCUPATION":"Maintenance man, Mechanic,  Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Injured states he was carrying a bag of B-Bond and a jug of water, he slipped in the mud and strained his groin area. The injury was diagnosed as a hernia on 10-10-14 that will require surgery to repair. The employee is currently working his regular job. The accident will become reportable as a NFDL (LTA) once he has the surgery.","sourceDate":"2014-09-25"},{"SOURCE_ROW_NUMBER":"204907","DOCUMENT_NO":"220141890026","ACCIDENT_DT":"06/26/2014","DEGREE_INJURY":"INJURIES DUE TO NATURAL CAUSES","CLASSIFICATION":"OTHER","ACCIDENT_TYPE":"NEC","OCCUPATION":"Examiner, Fire boss, Pre-shift examiner, Mine examiner","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Contract employee making pre-shift on section when he began having chest pains. A Mine EMT administered O2 and transported to surface. Although he felt better on the surface, mine management insisted transport to ER by ambulance. He received a cardiac catheterization consisting of Angioplasty and stent implantation for 85% coronary artery blockage. NOT A MINE ACCIDENT OR ILLNESS!","sourceDate":"2014-06-26"},{"SOURCE_ROW_NUMBER":"114491","DOCUMENT_NO":"220143090004","ACCIDENT_DT":"05/29/2014","DEGREE_INJURY":"OCCUPATNAL ILLNESS NOT DEG 1-6","CLASSIFICATION":"DISORDERS (REPEATED TRAUMA)","ACCIDENT_TYPE":"Rubbed or abraded","OCCUPATION":"Beltman, Conveyor man,  Conveyor belt worker, Mobile bridge carrierman, Feeder operator, Conveyor rider","NO_INJURIES":"1","NARRATIVE":"Employee developed soreness in his right knee from repetitive crawling over an extended period of time. Diagnosed by MRI as degenerative changes consistent with cartilage loss as well as degenerative meniscus tearing. Employee continued working his regular job until he had surgical repair of the knee on 10/31/2014.","sourceDate":"2014-05-29"},{"SOURCE_ROW_NUMBER":"191929","DOCUMENT_NO":"220143440019","ACCIDENT_DT":"05/09/2014","DEGREE_INJURY":"DAYS RESTRICTED ACTIVITY ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Laborer, Bull gang,  Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee stated that while assisting co-workers to belt up the section, he lifted a piece of belt structure straining his left shoulder. He continued to work his regular job until he had surgery to repair a torn rotator cuff on 12/2/2014.","sourceDate":"2014-05-09"},{"SOURCE_ROW_NUMBER":"84557","DOCUMENT_NO":"220133300008","ACCIDENT_DT":"11/22/2013","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDTOOLS (NONPOWERED)","ACCIDENT_TYPE":"Struck by flying object","OCCUPATION":"Discontinued 1/31/2014.  Several other codes cover Scoop Car Operator","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Two employees building cribs in 4-East area of mine, as one employee tightened his crib, the sledge hammer handle hit the crib, bounced out of the employee's hand causing the sledge to fly, striking an employee on the left side of his face causing a 3/4-inch laceration on the left side of his face between his lips and nose requiring sutures to close the wound.","sourceDate":"2013-11-22"},{"SOURCE_ROW_NUMBER":"144662","DOCUMENT_NO":"220132480008","ACCIDENT_DT":"08/26/2013","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in pulling or pushing objects","OCCUPATION":"Laborer, Bull gang,  Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee lacing belt through belt tail piece when he felt a pop in his right shoulder. Possible shoulder dislocation (He has history of having dislocated this shoulder at least two other times).","sourceDate":"2013-08-26"},{"SOURCE_ROW_NUMBER":"217906","DOCUMENT_NO":"220132480007","ACCIDENT_DT":"08/21/2013","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Caught in, under or between running or meshing objects","OCCUPATION":"Examiner, Fire boss, Pre-shift examiner, Mine examiner","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee tightening down take-up on the E-14 Belt Drive. As the take-up was reengaged, the dolly came back and pinched his hand left hand ring finger between the guide roller on the dolly and the track frame causing multiple lacerations requiring sutures.","sourceDate":"2013-08-21"},{"SOURCE_ROW_NUMBER":"50104","DOCUMENT_NO":"220131270038","ACCIDENT_DT":"05/02/2013","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"INUNDATION","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"Continuous Miner struck - breached an unmapped, active, low pressure / volume gas well in the R2 Entry of E-13 Section. Methane monitor on the miner immediately shut down the continuous miner. Power to the section was immediately shut off, the crew and the rest of the mine evacuated.","sourceDate":"2013-05-02"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2018-06-26","lastDate":"2018-06-26","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":709,"firstDate":"2002-03-07","lastDate":"2015-03-18","metrics":{"ss":194,"delinquent":697,"recentRows":0,"paidPenalty":202975,"proposedPenalty":325900,"currentAssessment":202975},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1663933","VIOLATION_NO":"7031727","ISSUE_DT":"03/18/2015","CFR_STANDARD_CD":"70.206(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-03-18"},{"SOURCE_ROW_NUMBER":"1663932","VIOLATION_NO":"7031725","ISSUE_DT":"03/12/2015","CFR_STANDARD_CD":"75.364(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-03-12"},{"SOURCE_ROW_NUMBER":"1663931","VIOLATION_NO":"7031724","ISSUE_DT":"03/12/2015","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-03-12"},{"SOURCE_ROW_NUMBER":"1663930","VIOLATION_NO":"7031723","ISSUE_DT":"03/11/2015","CFR_STANDARD_CD":"75.333(h)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-03-11"},{"SOURCE_ROW_NUMBER":"1663929","VIOLATION_NO":"7031722","ISSUE_DT":"03/11/2015","CFR_STANDARD_CD":"75.211(c)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"150.00","CURRENT_ASSESSMENT_AMT":"150.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-03-11"},{"SOURCE_ROW_NUMBER":"1663928","VIOLATION_NO":"7031721","ISSUE_DT":"03/09/2015","CFR_STANDARD_CD":"75.1502","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"499.00","CURRENT_ASSESSMENT_AMT":"499.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-03-09"},{"SOURCE_ROW_NUMBER":"1663912","VIOLATION_NO":"7029673","ISSUE_DT":"03/09/2015","CFR_STANDARD_CD":"75.1710-1(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-03-09"},{"SOURCE_ROW_NUMBER":"1665015","VIOLATION_NO":"7029672","ISSUE_DT":"03/03/2015","CFR_STANDARD_CD":"75.1725(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"1203.00","CURRENT_ASSESSMENT_AMT":"905.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-03-03"},{"SOURCE_ROW_NUMBER":"1663927","VIOLATION_NO":"7031720","ISSUE_DT":"02/25/2015","CFR_STANDARD_CD":"70.208(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-02-25"},{"SOURCE_ROW_NUMBER":"1663926","VIOLATION_NO":"7031719","ISSUE_DT":"02/25/2015","CFR_STANDARD_CD":"70.208(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-02-25"},{"SOURCE_ROW_NUMBER":"1663925","VIOLATION_NO":"7031718","ISSUE_DT":"02/19/2015","CFR_STANDARD_CD":"75.517","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-02-19"},{"SOURCE_ROW_NUMBER":"1663924","VIOLATION_NO":"7031717","ISSUE_DT":"02/19/2015","CFR_STANDARD_CD":"75.220(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-02-19"}]},{"id":"msha-civil-penalty-dockets-decisions","name":"Civil Penalty Dockets and Decisions","domains":["compliance","legal"],"products":["docket lineage","decision outcomes","citation packet precedent"],"rowCount":123,"firstDate":"2004-10-06","lastDate":"2016-04-04","metrics":{"appeals":0,"decisions":123,"recentRows":0,"decisionPenalty":112971,"originalPenalty":236996},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"366920","VIOLATION_NO":"7029715","DOCKET_NO":"PENN 2015-0043","DECISION_DT":"04/04/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"16400.00","DECISION_PENALTY_AMT":"8200.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2016-04-04"},{"SOURCE_ROW_NUMBER":"111886","VIOLATION_NO":"8011259","DOCKET_NO":"PENN 2015-0034","DECISION_DT":"04/04/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"460.00","DECISION_PENALTY_AMT":"230.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2016-04-04"},{"SOURCE_ROW_NUMBER":"111885","VIOLATION_NO":"7029718","DOCKET_NO":"PENN 2015-0034","DECISION_DT":"04/04/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"5961.00","DECISION_PENALTY_AMT":"2920.50","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2016-04-04"},{"SOURCE_ROW_NUMBER":"111440","VIOLATION_NO":"7029716","DOCKET_NO":"PENN 2015-0043","DECISION_DT":"04/04/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"52500.00","DECISION_PENALTY_AMT":"26250.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2016-04-04"},{"SOURCE_ROW_NUMBER":"367028","VIOLATION_NO":"7029864","DOCKET_NO":"PENN 2015-0034","DECISION_DT":"03/09/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1795.00","DECISION_PENALTY_AMT":"897.50","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2016-03-09"},{"SOURCE_ROW_NUMBER":"377058","VIOLATION_NO":"7029672","DOCKET_NO":"PENN 2016-0015","DECISION_DT":"02/29/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1203.00","DECISION_PENALTY_AMT":"905.00","JUDGE_FIRST_NAME":"John","JUDGE_LAST_NAME":"Lewis","sourceDate":"2016-02-29"},{"SOURCE_ROW_NUMBER":"376602","VIOLATION_NO":"7031708","DOCKET_NO":"PENN 2015-0316","DECISION_DT":"02/24/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"150.00","DECISION_PENALTY_AMT":"150.00","JUDGE_FIRST_NAME":"John","JUDGE_LAST_NAME":"Lewis","sourceDate":"2016-02-24"},{"SOURCE_ROW_NUMBER":"116976","VIOLATION_NO":"7031706","DOCKET_NO":"PENN 2015-0316","DECISION_DT":"02/24/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"150.00","DECISION_PENALTY_AMT":"150.00","JUDGE_FIRST_NAME":"John","JUDGE_LAST_NAME":"Lewis","sourceDate":"2016-02-24"},{"SOURCE_ROW_NUMBER":"372843","VIOLATION_NO":"7031721","DOCKET_NO":"PENN 2015-0216","DECISION_DT":"09/04/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"499.00","DECISION_PENALTY_AMT":"499.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2015-09-04"},{"SOURCE_ROW_NUMBER":"350073","VIOLATION_NO":"7018763","DOCKET_NO":"PENN 2014-16","DECISION_DT":"06/18/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"16867.00","DECISION_PENALTY_AMT":"8271.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2015-06-18"},{"SOURCE_ROW_NUMBER":"101394","VIOLATION_NO":"7018764","DOCKET_NO":"PENN 2014-16","DECISION_DT":"06/18/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"18742.00","DECISION_PENALTY_AMT":"9272.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2015-06-18"},{"SOURCE_ROW_NUMBER":"368295","VIOLATION_NO":"7029744","DOCKET_NO":"PENN 2015-0060","DECISION_DT":"03/20/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"764.00","DECISION_PENALTY_AMT":"764.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2015-03-20"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":1630,"firstDate":"2001-03-11","lastDate":"2015-03-05","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":198,"validSamples":1432,"maxConcentration":83.577,"concentrationTotal":1105.366},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"501239","CASS_NUM":"51357345","SMP_TAKEN_DT":"3/5/2015","CONC":"0","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"INVALID OR MISSING TIME","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-03-05"},{"SOURCE_ROW_NUMBER":"7859","CASS_NUM":"51357532","SMP_TAKEN_DT":"3/5/2015","CONC":".176","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"EXCESS SAMPLE","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-03-05"},{"SOURCE_ROW_NUMBER":"1528980","CASS_NUM":"51357359","SMP_TAKEN_DT":"3/4/2015","CONC":".403","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-03-04"},{"SOURCE_ROW_NUMBER":"1238033","CASS_NUM":"51357539","SMP_TAKEN_DT":"3/3/2015","CONC":".186","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-03-03"},{"SOURCE_ROW_NUMBER":"823055","CASS_NUM":"51357366","SMP_TAKEN_DT":"3/3/2015","CONC":".224","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-03-03"},{"SOURCE_ROW_NUMBER":"1341625","CASS_NUM":"51357372","SMP_TAKEN_DT":"3/2/2015","CONC":".271","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-03-02"},{"SOURCE_ROW_NUMBER":"632900","CASS_NUM":"51357391","SMP_TAKEN_DT":"3/2/2015","CONC":".948","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-03-02"},{"SOURCE_ROW_NUMBER":"1427345","CASS_NUM":"51357544","SMP_TAKEN_DT":"2/19/2015","CONC":".147","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-02-19"},{"SOURCE_ROW_NUMBER":"1178064","CASS_NUM":"51349619","SMP_TAKEN_DT":"2/19/2015","CONC":".097","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"UNREPRESENTATIVE SAMPLE","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-02-19"},{"SOURCE_ROW_NUMBER":"1201743","CASS_NUM":"51349623","SMP_TAKEN_DT":"2/18/2015","CONC":"0","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"CONTROL FILTER ABSENT","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-02-18"},{"SOURCE_ROW_NUMBER":"295748","CASS_NUM":"51320408","SMP_TAKEN_DT":"2/18/2015","CONC":"0","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"CONTROL FILTER ABSENT","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-02-18"},{"SOURCE_ROW_NUMBER":"81324","CASS_NUM":"51320409","SMP_TAKEN_DT":"2/18/2015","CONC":"0","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"CONTROL FILTER ABSENT","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2015-02-18"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":25,"firstDate":"2005-11-15","lastDate":"2014-10-29","metrics":{"linkedIssuances":25},"periods":{},"recentRecords":[]},{"id":"msha-contested-violations","name":"Contested Violations","domains":["compliance","legal"],"products":["contest status","time to resolution","contested-rate context"],"rowCount":114,"firstDate":"2004-07-21","lastDate":"2015-03-09","metrics":{"decisions":114,"ssChanged":33,"recentRows":0,"decisionPenalty":111606,"proposedPenalty":235070},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"321138","CITATION_NO":"7031721","CITATION_ISSUE_DT":"03/09/2015","DOCKET_NO":"PENN 2015-0216","DECISION_DT":"09/04/2015","CFR_STANDARD_CODE":"75.1502","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"499.00","DECISION_PENALTY_AMT":"499.00","sourceDate":"2015-03-09"},{"SOURCE_ROW_NUMBER":"322409","CITATION_NO":"7029672","CITATION_ISSUE_DT":"03/03/2015","DOCKET_NO":"PENN 2016-0015","DECISION_DT":"02/29/2016","CFR_STANDARD_CODE":"75.1725(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1203.00","DECISION_PENALTY_AMT":"905.00","sourceDate":"2015-03-03"},{"SOURCE_ROW_NUMBER":"35936","CITATION_NO":"7031708","CITATION_ISSUE_DT":"01/14/2015","DOCKET_NO":"PENN 2015-0316","DECISION_DT":"02/24/2016","CFR_STANDARD_CODE":"75.202(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"150.00","DECISION_PENALTY_AMT":"150.00","sourceDate":"2015-01-14"},{"SOURCE_ROW_NUMBER":"36843","CITATION_NO":"7031706","CITATION_ISSUE_DT":"01/13/2015","DOCKET_NO":"PENN 2015-0316","DECISION_DT":"02/24/2016","CFR_STANDARD_CODE":"75.1725(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"150.00","DECISION_PENALTY_AMT":"150.00","sourceDate":"2015-01-13"},{"SOURCE_ROW_NUMBER":"433799","CITATION_NO":"7029864","CITATION_ISSUE_DT":"09/09/2014","DOCKET_NO":"PENN 2015-0034","DECISION_DT":"03/09/2016","CFR_STANDARD_CODE":"75.1731(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1795.00","DECISION_PENALTY_AMT":"897.50","sourceDate":"2014-09-09"},{"SOURCE_ROW_NUMBER":"207167","CITATION_NO":"7029744","CITATION_ISSUE_DT":"05/20/2014","DOCKET_NO":"PENN 2015-0060","DECISION_DT":"03/20/2015","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"764.00","DECISION_PENALTY_AMT":"764.00","sourceDate":"2014-05-20"},{"SOURCE_ROW_NUMBER":"260109","CITATION_NO":"7029730","CITATION_ISSUE_DT":"04/22/2014","DOCKET_NO":"PENN 2014-0900","DECISION_DT":"03/20/2015","CFR_STANDARD_CODE":"75.403","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"224.00","DECISION_PENALTY_AMT":"224.00","sourceDate":"2014-04-22"},{"SOURCE_ROW_NUMBER":"376835","CITATION_NO":"7029725","CITATION_ISSUE_DT":"04/09/2014","DOCKET_NO":"PENN 2014-0870","DECISION_DT":"03/20/2015","CFR_STANDARD_CODE":"75.380(d)(7)(vi)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1795.00","DECISION_PENALTY_AMT":"1795.00","sourceDate":"2014-04-09"},{"SOURCE_ROW_NUMBER":"203966","CITATION_NO":"7029724","CITATION_ISSUE_DT":"04/09/2014","DOCKET_NO":"PENN 2014-0870","DECISION_DT":"03/20/2015","CFR_STANDARD_CODE":"75.380(d)(7)(vi)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"1795.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2014-04-09"},{"SOURCE_ROW_NUMBER":"430981","CITATION_NO":"7029718","CITATION_ISSUE_DT":"04/03/2014","DOCKET_NO":"PENN 2015-0034","DECISION_DT":"04/04/2016","CFR_STANDARD_CODE":"75.360(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"5961.00","DECISION_PENALTY_AMT":"2920.50","sourceDate":"2014-04-03"},{"SOURCE_ROW_NUMBER":"373926","CITATION_NO":"7029716","CITATION_ISSUE_DT":"04/03/2014","DOCKET_NO":"PENN 2015-0043","DECISION_DT":"04/04/2016","CFR_STANDARD_CODE":"75.403","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"52500.00","DECISION_PENALTY_AMT":"26250.00","sourceDate":"2014-04-03"},{"SOURCE_ROW_NUMBER":"37892","CITATION_NO":"7029715","CITATION_ISSUE_DT":"04/03/2014","DOCKET_NO":"PENN 2015-0043","DECISION_DT":"04/04/2016","CFR_STANDARD_CODE":"75.220(a)(1)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"16400.00","DECISION_PENALTY_AMT":"8200.00","sourceDate":"2014-04-03"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":1018,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":7,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":238,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":6,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":4,"firstDate":"2001-08-01","lastDate":"2014-12-30","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":3},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":204,"firstDate":"2002-03-04","lastDate":"2018-06-25","metrics":{"inspectors":346,"recentRows":0,"onSiteHours":9403.75,"inspectionHours":14118.75,"inspectionSamples":969},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"859236","EVENT_NO":"6243792","INSPECTION_BEGIN_DT":"06/25/2018","INSPECTION_END_DT":"06/25/2018","ACTIVITY_CODE":"E28","ACTIVITY":"Mine Idle Activity","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"3","SUM_TOTAL_ON_SITE_HOURS":"1.5","sourceDate":"2018-06-25"},{"SOURCE_ROW_NUMBER":"377935","EVENT_NO":"6243645","INSPECTION_BEGIN_DT":"01/25/2017","INSPECTION_END_DT":"01/25/2017","ACTIVITY_CODE":"E28","ACTIVITY":"Mine Idle Activity","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"1.25","SUM_TOTAL_ON_SITE_HOURS":".25","sourceDate":"2017-01-25"},{"SOURCE_ROW_NUMBER":"466692","EVENT_NO":"6243635","INSPECTION_BEGIN_DT":"10/26/2016","INSPECTION_END_DT":"10/26/2016","ACTIVITY_CODE":"E28","ACTIVITY":"Mine Idle Activity","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"4.5","SUM_TOTAL_ON_SITE_HOURS":"1.5","sourceDate":"2016-10-26"},{"SOURCE_ROW_NUMBER":"163738","EVENT_NO":"6243611","INSPECTION_BEGIN_DT":"07/05/2016","INSPECTION_END_DT":"07/08/2016","ACTIVITY_CODE":"E28","ACTIVITY":"Mine Idle Activity","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5","SUM_TOTAL_ON_SITE_HOURS":"0","sourceDate":"2016-07-05"},{"SOURCE_ROW_NUMBER":"611478","EVENT_NO":"6243199","INSPECTION_BEGIN_DT":"04/22/2016","INSPECTION_END_DT":"04/22/2016","ACTIVITY_CODE":"E28","ACTIVITY":"Mine Idle Activity","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"4","SUM_TOTAL_ON_SITE_HOURS":"3","sourceDate":"2016-04-22"},{"SOURCE_ROW_NUMBER":"579264","EVENT_NO":"6242649","INSPECTION_BEGIN_DT":"10/01/2015","INSPECTION_END_DT":"11/16/2015","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"49.25","SUM_TOTAL_ON_SITE_HOURS":"28","sourceDate":"2015-10-01"},{"SOURCE_ROW_NUMBER":"130681","EVENT_NO":"4049899","INSPECTION_BEGIN_DT":"07/02/2015","INSPECTION_END_DT":"09/21/2015","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"60","SUM_TOTAL_ON_SITE_HOURS":"36.25","sourceDate":"2015-07-02"},{"SOURCE_ROW_NUMBER":"821287","EVENT_NO":"6242358","INSPECTION_BEGIN_DT":"04/10/2015","INSPECTION_END_DT":"11/23/2015","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"45.25","SUM_TOTAL_ON_SITE_HOURS":"25.5","sourceDate":"2015-04-10"},{"SOURCE_ROW_NUMBER":"1074958","EVENT_NO":"6242835","INSPECTION_BEGIN_DT":"04/02/2015","INSPECTION_END_DT":"05/26/2015","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"67","SUM_TOTAL_ON_SITE_HOURS":"33.5","sourceDate":"2015-04-02"},{"SOURCE_ROW_NUMBER":"197881","EVENT_NO":"6242834","INSPECTION_BEGIN_DT":"03/31/2015","INSPECTION_END_DT":"03/31/2015","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10.5","SUM_TOTAL_ON_SITE_HOURS":"6","sourceDate":"2015-03-31"},{"SOURCE_ROW_NUMBER":"626307","EVENT_NO":"4011114","INSPECTION_BEGIN_DT":"03/12/2015","INSPECTION_END_DT":"03/16/2015","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"16","SUM_TOTAL_ON_SITE_HOURS":"8","sourceDate":"2015-03-12"},{"SOURCE_ROW_NUMBER":"1053755","EVENT_NO":"6242978","INSPECTION_BEGIN_DT":"03/03/2015","INSPECTION_END_DT":"03/04/2015","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"11.5","SUM_TOTAL_ON_SITE_HOURS":"9","sourceDate":"2015-03-03"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":124,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2018-Q1":{"hours":0,"employees":0,"production":0},"2017-Q4":{"hours":0,"employees":0,"production":0},"2017-Q3":{"hours":0,"employees":0,"production":0},"2017-Q2":{"hours":0,"employees":0,"production":0},"2017-Q1":{"hours":0,"employees":0,"production":0},"2016-Q4":{"hours":0,"employees":0,"production":0},"2016-Q3":{"hours":0,"employees":0,"production":0},"2015-Q4":{"hours":96,"employees":1,"production":0},"2015-Q3":{"hours":823,"employees":2,"production":0},"2015-Q2":{"hours":2060,"employees":4,"production":1062},"2015-Q1":{"hours":19354,"employees":35,"production":34739},"2014-Q4":{"hours":32774,"employees":57,"production":83464}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":28,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2006":{"hours":184883,"employees":73,"production":658067},"2007":{"hours":128087,"employees":51,"production":370122},"2008":{"hours":103266,"employees":40,"production":371870},"2009":{"hours":86474,"employees":39,"production":270661},"2010":{"hours":102102,"employees":41,"production":286184},"2011":{"hours":112367,"employees":46,"production":295172},"2012":{"hours":114621,"employees":48,"production":300496},"2013":{"hours":128793,"employees":56,"production":385065},"2014":{"hours":138557,"employees":59,"production":377595},"2015":{"hours":22333,"employees":11,"production":35801}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":125,"firstDate":"2002-08-28","lastDate":"2014-11-24","metrics":{"recentRows":0,"doseOver100":12,"actDoseTotal":7256,"pelDoseTotal":4922},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"167104","EVENT_NO":"6242145","SURVEY_DATE":"11/24/2014","OCCUPATION_CD_DESC":"HIGHLIFT OPERATOR/FRONT END LOADER","MACHINE_CD":"18","MANUFACTURER_CD":"018","ACT_DOSE_85":"29","PEL_DOSE_90":"16","SURVEY_TYPE":"I","sourceDate":"2014-11-24"},{"SOURCE_ROW_NUMBER":"167103","EVENT_NO":"6242145","SURVEY_DATE":"11/24/2014","OCCUPATION_CD_DESC":"MECHANIC","MACHINE_CD":"40","MANUFACTURER_CD":"120","ACT_DOSE_85":"27","PEL_DOSE_90":"12","SURVEY_TYPE":"I","sourceDate":"2014-11-24"},{"SOURCE_ROW_NUMBER":"167117","EVENT_NO":"6242626","SURVEY_DATE":"05/14/2014","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"53","PEL_DOSE_90":"30","SURVEY_TYPE":"I","sourceDate":"2014-05-14"},{"SOURCE_ROW_NUMBER":"167116","EVENT_NO":"6242626","SURVEY_DATE":"05/14/2014","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"49","PEL_DOSE_90":"27","SURVEY_TYPE":"I","sourceDate":"2014-05-14"},{"SOURCE_ROW_NUMBER":"167115","EVENT_NO":"6242626","SURVEY_DATE":"05/14/2014","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"83","PEL_DOSE_90":"49","SURVEY_TYPE":"I","sourceDate":"2014-05-14"},{"SOURCE_ROW_NUMBER":"167114","EVENT_NO":"6242626","SURVEY_DATE":"05/14/2014","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"74","PEL_DOSE_90":"40","SURVEY_TYPE":"I","sourceDate":"2014-05-14"},{"SOURCE_ROW_NUMBER":"167112","EVENT_NO":"6242626","SURVEY_DATE":"05/14/2014","OCCUPATION_CD_DESC":"MOBILE BRIDGE OPERATOR","MACHINE_CD":"08","MANUFACTURER_CD":"119","ACT_DOSE_85":"61","PEL_DOSE_90":"36","SURVEY_TYPE":"I","sourceDate":"2014-05-14"},{"SOURCE_ROW_NUMBER":"167111","EVENT_NO":"6242626","SURVEY_DATE":"05/14/2014","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"90","PEL_DOSE_90":"69","SURVEY_TYPE":"I","sourceDate":"2014-05-14"},{"SOURCE_ROW_NUMBER":"167113","EVENT_NO":"6242626","SURVEY_DATE":"05/12/2014","OCCUPATION_CD_DESC":"MOBILE BRIDGE OPERATOR","MACHINE_CD":"08","MANUFACTURER_CD":"119","ACT_DOSE_85":"108","PEL_DOSE_90":"90","SURVEY_TYPE":"I","sourceDate":"2014-05-12"},{"SOURCE_ROW_NUMBER":"167102","EVENT_NO":"6242072","SURVEY_DATE":"11/06/2013","OCCUPATION_CD_DESC":"MECHANIC","MACHINE_CD":"40","MANUFACTURER_CD":"120","ACT_DOSE_85":"20","PEL_DOSE_90":"8","SURVEY_TYPE":"I","sourceDate":"2013-11-06"},{"SOURCE_ROW_NUMBER":"167101","EVENT_NO":"6242072","SURVEY_DATE":"11/06/2013","OCCUPATION_CD_DESC":"FORKLIFT OPERATOR","MACHINE_CD":"17","MANUFACTURER_CD":"018","ACT_DOSE_85":"19","PEL_DOSE_90":"8","SURVEY_TYPE":"I","sourceDate":"2013-11-06"},{"SOURCE_ROW_NUMBER":"167100","EVENT_NO":"6242072","SURVEY_DATE":"11/06/2013","OCCUPATION_CD_DESC":"HIGHLIFT OPERATOR/FRONT END LOADER","MACHINE_CD":"18","MANUFACTURER_CD":"018","ACT_DOSE_85":"14","PEL_DOSE_90":"5","SURVEY_TYPE":"I","sourceDate":"2013-11-06"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":138,"firstDate":"2002-10-29","lastDate":"2014-12-18","metrics":{"recentRows":0,"voidSamples":8,"maxQuartzPct":17.8,"validSamples":130,"quartzPctTotal":475.5},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"32402","CASSETTE_NO":"58214788","SAMPLE_DT":"12/18/2014","QUARTZ_PCT":"01.2","QUARTZ_MICROGRAMS":"6","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-12-18"},{"SOURCE_ROW_NUMBER":"168212","CASSETTE_NO":"58164880","SAMPLE_DT":"11/19/2014","QUARTZ_PCT":"04.4","QUARTZ_MICROGRAMS":"10","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"QUARTZ LABORATORY VOID","sourceDate":"2014-11-19"},{"SOURCE_ROW_NUMBER":"137548","CASSETTE_NO":"58164876","SAMPLE_DT":"11/19/2014","QUARTZ_PCT":"03.0","QUARTZ_MICROGRAMS":"22","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"QUARTZ LABORATORY VOID","sourceDate":"2014-11-19"},{"SOURCE_ROW_NUMBER":"90551","CASSETTE_NO":"58164663","SAMPLE_DT":"11/19/2014","QUARTZ_PCT":"07.6","QUARTZ_MICROGRAMS":"54","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"QUARTZ LABORATORY VOID","sourceDate":"2014-11-19"},{"SOURCE_ROW_NUMBER":"33687","CASSETTE_NO":"58164722","SAMPLE_DT":"11/19/2014","QUARTZ_PCT":"08.8","QUARTZ_MICROGRAMS":"43","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-11-19"},{"SOURCE_ROW_NUMBER":"140053","CASSETTE_NO":"58164587","SAMPLE_DT":"07/31/2014","QUARTZ_PCT":"05.0","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-07-31"},{"SOURCE_ROW_NUMBER":"133815","CASSETTE_NO":"58164635","SAMPLE_DT":"07/31/2014","QUARTZ_PCT":"07.0","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-07-31"},{"SOURCE_ROW_NUMBER":"98402","CASSETTE_NO":"58164629","SAMPLE_DT":"07/31/2014","QUARTZ_PCT":"04.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-07-31"},{"SOURCE_ROW_NUMBER":"70084","CASSETTE_NO":"58164598","SAMPLE_DT":"07/31/2014","QUARTZ_PCT":"01.2","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-07-31"},{"SOURCE_ROW_NUMBER":"70883","CASSETTE_NO":"58123720","SAMPLE_DT":"05/21/2014","QUARTZ_PCT":"02.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-05-21"},{"SOURCE_ROW_NUMBER":"109991","CASSETTE_NO":"51271769","SAMPLE_DT":"04/08/2014","QUARTZ_PCT":"00.7","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-04-08"},{"SOURCE_ROW_NUMBER":"58392","CASSETTE_NO":"51272048","SAMPLE_DT":"04/08/2014","QUARTZ_PCT":"02.5","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-04-08"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":714,"firstDate":"2002-03-07","lastDate":"2015-04-10","metrics":{"ss":193,"amountDue":202975,"contested":78,"amountPaid":202975,"recentRows":0,"section104d":2,"unterminated":0,"proposedPenalty":325900},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1966704","VIOLATION_NO":"3952849","VIOLATION_ISSUE_DT":"04/10/2015","CIT_ORD_SAFE":"Order","NO_AFFECTED":"0","TERMINATION_DT":"11/23/2015","CONTESTED_IND":"N","sourceDate":"2015-04-10"},{"SOURCE_ROW_NUMBER":"1966382","VIOLATION_NO":"7031727","VIOLATION_ISSUE_DT":"03/18/2015","SIG_SUB":"N","PART_SECTION":"70.206(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"0","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"03/18/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-03-18"},{"SOURCE_ROW_NUMBER":"1966381","VIOLATION_NO":"7031725","VIOLATION_ISSUE_DT":"03/12/2015","SIG_SUB":"N","PART_SECTION":"75.364(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"9","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"04/02/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-03-12"},{"SOURCE_ROW_NUMBER":"1966380","VIOLATION_NO":"7031724","VIOLATION_ISSUE_DT":"03/12/2015","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"9","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"03/16/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-03-12"},{"SOURCE_ROW_NUMBER":"1966379","VIOLATION_NO":"7031723","VIOLATION_ISSUE_DT":"03/11/2015","SIG_SUB":"N","PART_SECTION":"75.333(h)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"9","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"03/16/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-03-11"},{"SOURCE_ROW_NUMBER":"1966378","VIOLATION_NO":"7031722","VIOLATION_ISSUE_DT":"03/11/2015","SIG_SUB":"Y","PART_SECTION":"75.211(c)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"03/16/2015","PROPOSED_PENALTY":"150","AMOUNT_DUE":"150","AMOUNT_PAID":"150","CONTESTED_IND":"N","sourceDate":"2015-03-11"},{"SOURCE_ROW_NUMBER":"1966377","VIOLATION_NO":"7031721","VIOLATION_ISSUE_DT":"03/09/2015","SIG_SUB":"Y","PART_SECTION":"75.1502","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"4","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"03/10/2015","PROPOSED_PENALTY":"499","AMOUNT_DUE":"499","AMOUNT_PAID":"499","CONTESTED_IND":"N","sourceDate":"2015-03-09"},{"SOURCE_ROW_NUMBER":"1966361","VIOLATION_NO":"7029673","VIOLATION_ISSUE_DT":"03/09/2015","SIG_SUB":"N","PART_SECTION":"75.1710-1(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"03/09/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-03-09"},{"SOURCE_ROW_NUMBER":"1966519","VIOLATION_NO":"7029672","VIOLATION_ISSUE_DT":"03/03/2015","SIG_SUB":"Y","PART_SECTION":"75.1725(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Fatal","NO_AFFECTED":"2","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"03/03/2015","PROPOSED_PENALTY":"1203","AMOUNT_DUE":"905","AMOUNT_PAID":"905","CONTESTED_IND":"N","sourceDate":"2015-03-03"},{"SOURCE_ROW_NUMBER":"1966376","VIOLATION_NO":"7031720","VIOLATION_ISSUE_DT":"02/25/2015","SIG_SUB":"N","PART_SECTION":"70.208(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/25/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-02-25"},{"SOURCE_ROW_NUMBER":"1966375","VIOLATION_NO":"7031719","VIOLATION_ISSUE_DT":"02/25/2015","SIG_SUB":"N","PART_SECTION":"70.208(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/25/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-02-25"},{"SOURCE_ROW_NUMBER":"1966374","VIOLATION_NO":"7031718","VIOLATION_ISSUE_DT":"02/19/2015","SIG_SUB":"N","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"02/19/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-02-19"}]}],"safety":{"href":"/api/v1/mines/3609005/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/3609005/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.364","heading":"Weekly examination.","id":"75.364","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.364","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) Worked-out areas. (1) At least every 7 days, a certified person shall examine unsealed worked-out areas where no pillars have been recovered by traveling to the area of deepest penetration; measuring methane and oxygen concentrations and air quantities and making tests to determine if the air is moving in the proper direction in the area. The locations of measurement points where tests and measurements will be performed shall be included in the mine ventilation plan and shall be adequate in number and location to assure ventilation and air quality in the area. Air quantity measurements shall also be made where the air enters and leaves the worked-out area. An alternative method of evaluating the ventilation of the area may be approved in the ventilation plan.\n\n(2) At least every 7 days, a certified person shall evaluate the effectiveness of bleeder systems required by § 75.334 as follows:\n\n(i) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in its proper direction shall be made where air enters the worked-out area.\n\n(ii) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in the proper direction shall be made immediately before the air enters a return split of air.\n\n(iii) At least one entry of each set of bleeder entries used as part of a bleeder system under § 75.334 shall be traveled in its entirety. Measurements of methane and oxygen concentrations and air quantities and a test to determine if the air is moving in the proper direction shall be made at the measurement point locations specified in the mine ventilation plan to determine the effectiveness of the bleeder system.\n\n(iv) In lieu of the requirements of paragraphs (a)(2)(i) and (iii) of this section, an alternative method of evaluation may be specified in the ventilation plan provided the alternative method results in proper evaluation of the effectiveness of the bleeder system.\n\n(b) Hazardous conditions and violations of mandatory health or safety standards. At least every 7 days, an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(8) of this section shall be made by a certified person designated by the operator at the following locations:\n\n(1) In at least one entry of each intake air course, in its entirety, so that the entire air course is traveled.\n\n(2) In at least one entry of each return air course, in its entirety, so that the entire air course is traveled.\n\n(3) In each longwall or shortwall travelway in its entirety, so that the entire travelway is traveled.\n\n(4) At each seal along return and bleeder air courses and at each seal along intake air courses not examined under § 75.360(b)(5).\n\n(5) In each escapeway so that the entire escapeway is traveled.\n\n(6) On each working section not examined under § 75.360(b)(3) during the previous 7 days.\n\n(7) At each water pump not examined during a preshift examination conducted during the previous 7 days.\n\n(8) Weekly examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust; and\n\n(iv) § 75.1403—maintenance of off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) Measurements and tests. At least every 7 days, a certified person shall—\n\n(1) Determine the volume of air entering the main intakes and in each intake split;\n\n(2) Determine the volume of air and test for methane in the last open crosscut in any pair or set of developing entries or rooms, in the return of each split of air immediately before it enters the main returns, and where the air leaves the main returns; and\n\n(3) Test for methane in the return entry nearest each set of seals immediately after the air passes the seals.\n\n(d) Hazardous conditions shall be corrected immediately. If the condition creates an imminent danger, everyone except those persons referred to in section 104(c) of the Act shall be withdrawn from the area affected to a safe area until the hazardous condition is corrected. Any violation of the nine mandatory health or safety standards found during a weekly examination shall be corrected.\n\n(e) The weekly examination may be conducted at the same time as the preshift or on-shift examinations.\n\n(f) (1) The weekly examination is not required during any 7 day period in which no one enters any underground area of the mine.\n\n(2) Except for certified persons required to make examinations, no one shall enter any underground area of the mine if a weekly examination has not been completed within the previous 7 days.\n\n(g) Certification. The person making the weekly examinations shall certify by initials, date, and the time that the examination was made. Certifications and times shall appear at enough locations to show that the entire area has been examined.\n\n(h) Recordkeeping. At the completion of any shift during which a portion of a weekly examination is conducted, a record of the results of each weekly examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards found during each examination and their locations, the corrective action taken, and the results and location of air and methane measurements, shall be made. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the person making the examination or a person designated by the operator. If made by a person other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. The record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(i) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 77 FR 20715, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.333","heading":"Ventilation controls.","id":"75.333","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) For purposes of this section, “doors” include any door frames.\n\n(b) Permanent stoppings or other permanent ventilation control devices constructed after November 15, 1992, shall be built and maintained—\n\n(1) Between intake and return air courses, except temporary controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the room was developed including where continuous face haulage systems are used in such rooms. Unless otherwise approved in the ventilation plan, these stoppings or controls shall be maintained to and including the third connecting crosscut outby the working face;\n\n(2) To separate belt conveyor haulageways from return air courses, except where belt entries in areas of mines developed before March 30, 1970, are used as return air courses;\n\n(3) To separate belt conveyor haulageways from intake air courses when the air in the intake air courses is used to provide air to active working places. Temporary ventilation controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the rooms were developed including where continuous face haulage systems are used in such rooms. When continuous face haulage systems are used, permanent stoppings or other permanent ventilation control devices shall be built and maintained to the outby most point of travel of the dolly or 600 feet from the point of deepest penetration in the conveyor belt entry, whichever distance is closer to the point of deepest penetration, to separate the continuous haulage entry from the intake entries;\n\n(4) To separate the primary escapeway from belt and trolley haulage entries, as required by § 75.380(g). For the purposes of § 75.380(g), the loading point for a continuous haulage system shall be the outby most point of travel of the dolly or 600 feet from the point of deepest penetration, whichever distance is less; and\n\n(5) In return air courses to direct air into adjacent worked-out areas.\n\n(c) Personnel doors shall be constructed of noncombustible material and shall be of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between air courses, and shall be installed as follows in permanent stoppings constructed after November 15, 1992:\n\n(1) The distance between personnel doors shall be no more than 300 feet in seam heights below 48 inches and 600 feet in seam heights 48 inches or higher.\n\n(2) The location of all personnel doors in stoppings along escapeways shall be clearly marked so that the doors may be easily identified by anyone traveling in the escapeway and in the entries on either side of the doors.\n\n(3) When not in use, personnel doors shall be closed.\n\n(4) An airlock shall be established where the air pressure differential between air courses creates a static force exceeding 125 pounds on closed personnel doors along escapeways.\n\n(d) Doors, other than personnel doors, constructed after November 15, 1992, that are used in lieu of permanent stoppings or to control ventilation within an air course shall be:\n\n(1) Made of noncombustible material or coated on all accessible surfaces with flame-retardant materials having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(2) Of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between or within air courses or entries.\n\n(3) Installed in pairs to form an airlock. When an airlock is used, one side of the airlock shall remain closed. When not in use, both sides shall be closed.\n\n(e)(1)(i) Except as provided in paragraphs (e)(2), (3), and (4) of this section, all overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after June 10, 1996, shall be constructed in a traditionally accepted method and of materials that have been demonstrated to perform adequately or in a method and of materials that have been tested and shown to have a minimum strength equal to or greater than the traditionally accepted in-mine controls. Tests may be performed under ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction” (Section 12-Transverse Load-Specimen Vertical, load, only), or the operator may conduct comparative in-mine tests. In-mine tests shall be designed to demonstrate the comparative strength of the proposed construction and a traditionally accepted in-mine control. The publication ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction,” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(ii) All overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after November 15, 1992, shall be constructed of noncombustible material. Materials that are suitable for the construction of overcasts, undercasts, shaft partitions, permanent stoppings, and regulators include concrete, concrete block, brick, cinder block, tile, or steel. No ventilation controls installed after November 15, 1992, shall be constructed of aluminum.\n\n(2) In anthracite mines, permanent stoppings may be constructed of overlapping layers of hardwood mine boards, if the stoppings are a minimum 2 inches thick.\n\n(3) When timbers are used to create permanent stoppings in heaving or caving areas, the stoppings shall be coated on all accessible surfaces with a flame-retardant material having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(4) In anthracite mines, doors and regulators may be constructed of overlapping layers of hardwood boards, if the doors, door frames, and regulators are a minimum 2 inches thick.\n\n(f) When sealants are applied to ventilation controls, the sealant shall have a flame-spread index of 25 or less under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(g) Before mining is discontinued in an entry or room that is advanced more than 20 feet from the inby rib, a crosscut shall be made or line brattice shall be installed and maintained to provide adequate ventilation. When conditions such as methane liberation warrant a distance less than 20 feet, the approved ventilation plan shall specify the location of such rooms or entries and the maximum distance they will be developed before a crosscut is made or line brattice is installed.\n\n(h) All ventilation controls, including seals, shall be maintained to serve the purpose for which they were built.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996; 61 FR 26442, May 28, 1996; 61 FR 29288, 29289, June 10, 1996, as amended at 67 FR 38386, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 73 FR 80612, Dec. 31, 2008; 80 FR 52991, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]","occurrenceCount":1},{"chapter":"I","heading":"Roof testing and scaling.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.211","part":"75","subchapter":"O","subpart":"C","id":"75.211","citation":"30 CFR 75.211","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","heading":"Mine emergency evacuation and firefighting program of instruction.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-P/section-75.1502","part":"75","subchapter":"O","subpart":"P","id":"75.1502","citation":"30 CFR 75.1502","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","heading":"Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation requirements.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1710-1","part":"75","subchapter":"O","subpart":"R","id":"75.1710-1","citation":"30 CFR 75.1710-1","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1725","heading":"Machinery and equipment; operation and maintenance.","id":"75.1725","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1725","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) Mobile and stationary machinery and equipment shall be maintained in safe operating condition and machinery or equipment in unsafe condition shall be removed from service immediately.\n\n(b) Machinery and equipment shall be operated only by persons authorized to operate such machinery or equipment.\n\n(c) Repairs or maintenance shall not be performed on machinery until the power is off and the machinery is blocked against motion, except where machinery motion is necessary to make adjustments.\n\n(d) Machinery shall not be lubricated manually while in motion, unless equipped with extended fittings or cups.\n\n[38 FR 4976, Feb. 23, 1973]","occurrenceCount":1},{"chapter":"I","heading":"Quarterly sampling; mechanized mining units.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-70/subpart-C/section-70.208","part":"70","subchapter":"O","subpart":"C","id":"70.208","citation":"30 CFR 70.208","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 70—MANDATORY HEALTH STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.517","heading":"Power wires and cables; insulation and protection.","id":"75.517","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.517","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nPower wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately and fully protected.","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"3609005","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}