{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"3608725","name":"Beaver Valley","status":"Abandoned and Sealed","status_date":"2017-05-22","mine_type":"Surface","coal_metal":"C","commodity":"Coal (Bituminous)","state":"PA","county":"Beaver","nearest_town":"Shippingport","operator_id":"P09635","operator_name":"Rosebud Mining Company","controller_id":"C07485","controller_name":"J Clifford  Forrest III","district":"C03","office":"Indiana PA Field Office","employees":0,"latitude":40.666667,"longitude":-80.5},"coverage":{"contributingSources":17,"registeredSources":20,"sourceRows":3898},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"3608725","name":"Beaver Valley"},"operator":{"type":"operator","id":"P09635","name":"Rosebud Mining Company"},"controller":{"type":"controller","id":"C07485","name":"J Clifford  Forrest III"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C07485","name":"J Clifford  Forrest III"},"object":{"type":"mine","id":"3608725","name":"Beaver Valley"},"validFrom":"1979-08-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608725|C07485|1979-08-01|"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C13727","name":"Forest Coal Company"},"object":{"type":"mine","id":"3608725","name":"Beaver Valley"},"validFrom":"1989-03-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608725|C13727|1989-03-01|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P20103","name":"Mountain Spring Coal Co."},"object":{"type":"mine","id":"3608725","name":"Beaver Valley"},"validFrom":"1998-03-01","validTo":"2003-08-24","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608725|P20103|1998-03-01|2003-08-24"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C13727","name":"Forest Coal Company"},"object":{"type":"operator","id":"P20103","name":"Mountain Spring Coal Co."},"validFrom":"1998-03-01","validTo":"2003-08-24","current":false,"derived":true,"evidenceMineId":"3608725","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608725|P20103|1998-03-01|C13727|1989-03-01|90940"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P09635","name":"Rosebud Mining Company"},"object":{"type":"mine","id":"3608725","name":"Beaver Valley"},"validFrom":"2003-08-25","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608725|P09635|2003-08-25|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C07485","name":"J Clifford  Forrest III"},"object":{"type":"operator","id":"P09635","name":"Rosebud Mining Company"},"validFrom":"2003-08-25","validTo":null,"current":true,"derived":true,"evidenceMineId":"3608725","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608725|P09635|2003-08-25|C07485|1979-08-01|74776"}}],"coverage":{"historyRecords":2,"edgeCount":6,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":75,"firstDate":"2000-01-18","lastDate":"2015-08-13","metrics":{"daysLost":1860,"injuries":60,"fatalities":1,"recentRows":0,"restrictedDays":425,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"80197","DOCUMENT_NO":"220152260061","ACCIDENT_DT":"08/13/2015","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"Roof Fall in # 4 entry of P butt, at the end of the shift Face boss called outside to report a fall in #4 entry onto the la bolter no injuries reported, called 800  to notify MSHA","sourceDate":"2015-08-13"},{"SOURCE_ROW_NUMBER":"11416","DOCUMENT_NO":"220151340034","ACCIDENT_DT":"05/08/2015","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"While the maintenance foreman was entering the mine he noticed a fall in the belt line on A main just inside the porthole, he reported to the section and contacted the mine foreman","sourceDate":"2015-05-08"},{"SOURCE_ROW_NUMBER":"19960","DOCUMENT_NO":"220151100012","ACCIDENT_DT":"04/09/2015","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"While pre-shift to the section was in the process, the examiner found a roof fall in #3 entry on the front MBC. area was dangered off and a report was phoned outside of the discovery. Fall was aprox. 30 foot long 25 foot wide and 4 foot thick, fall was located in #3 entry of M butt","sourceDate":"2015-04-09"},{"SOURCE_ROW_NUMBER":"41422","DOCUMENT_NO":"220143380029","ACCIDENT_DT":"11/26/2014","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck by powered moving object","OCCUPATION":"Miner, NEC","NO_INJURIES":"1","DAYS_LOST":"63","NARRATIVE":"While he was helping work on a belt drive he was struck by a man trip on his left hip","sourceDate":"2014-11-26"},{"SOURCE_ROW_NUMBER":"41421","DOCUMENT_NO":"220141040071","ACCIDENT_DT":"04/06/2014","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"While employee was performing the preshift of the mine, he came across a roof fall in number 2 entry at spad # 5011 aprox 3 x cuts outby. The section was in the process of moving back away from this area the day before.","sourceDate":"2014-04-06"},{"SOURCE_ROW_NUMBER":"15691","DOCUMENT_NO":"220140660025","ACCIDENT_DT":"03/03/2014","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck against stationary object","OCCUPATION":"Laborer, Bull gang,  Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"while employee was moving johnson duster by hand it shifted hitting his right hand against a steel bracket lacerating the right middle finger","sourceDate":"2014-03-03"},{"SOURCE_ROW_NUMBER":"239397","DOCUMENT_NO":"220140550025","ACCIDENT_DT":"02/24/2014","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"INUNDATION","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"while mining in number 4 entry in E-3 butt the continuous mine struck a well casing approx,.6-8 inch hole dia approx 9-10 inch no gases present water coming from pipe approx 6-10 gal a min federal inspector was onsite issued a K order at time","sourceDate":"2014-02-24"},{"SOURCE_ROW_NUMBER":"213565","DOCUMENT_NO":"220121650009","ACCIDENT_DT":"06/06/2012","DEGREE_INJURY":"DYS AWY FRM WRK & RESTRCTD ACT","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Caught in, under or between a moving and a stationary object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"52","NARRATIVE":"While bolting on the fletcher twin boom,he lowered the drill head onto his right knee","sourceDate":"2012-06-06"},{"SOURCE_ROW_NUMBER":"45772","DOCUMENT_NO":"220120900040","ACCIDENT_DT":"03/29/2012","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"At 12 pm Dave Chambers found a roof fall in F mains return approx. 40 ft long , located 32-33 brk # 2 entry","sourceDate":"2012-03-29"},{"SOURCE_ROW_NUMBER":"135988","DOCUMENT_NO":"220120230046","ACCIDENT_DT":"01/21/2012","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Caught in, under or between a moving and a stationary object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"35","NARRATIVE":"EE was working on a LA bolter, EE decided to back the bolter into a cross cut to let a scoop pass,while backing into the xcut EE looked back to see how much room he had left when the la drifted and pinned his left arm between the rib and bolter, causing a laceration from the bottom of his bicep to his forearm he was able to free himself immediately.","sourceDate":"2012-01-21"},{"SOURCE_ROW_NUMBER":"200507","DOCUMENT_NO":"220120190018","ACCIDENT_DT":"01/10/2012","DEGREE_INJURY":"DYS AWY FRM WRK & RESTRCTD ACT","CLASSIFICATION":"HANDTOOLS (NONPOWERED)","ACCIDENT_TYPE":"Over-exertion in wielding or throwing objects","OCCUPATION":"Loader head operator, Roscoe operator","NO_INJURIES":"1","DAYS_LOST":"120","NARRATIVE":"while helping the mechanic ee was swinging a 5lb sledge when he slipped twisting his lower extremity, ee did not want to go to have checked until 3 days later. upon ee was diag.with a torn ligament in his back and l3,l4,l5 s1 ruptured","sourceDate":"2012-01-10"},{"SOURCE_ROW_NUMBER":"222112","DOCUMENT_NO":"220112200006","ACCIDENT_DT":"07/26/2011","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"roof fall located in # 5 D mains","sourceDate":"2011-07-26"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2017-05-22","lastDate":"2017-05-22","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":596,"firstDate":"2000-01-06","lastDate":"2016-12-13","metrics":{"ss":176,"delinquent":594,"recentRows":0,"paidPenalty":174956.8,"proposedPenalty":348467,"currentAssessment":175256.8},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1658424","VIOLATION_NO":"7031387","ISSUE_DT":"12/13/2016","CFR_STANDARD_CD":"77.1713(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"116.00","CURRENT_ASSESSMENT_AMT":"116.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-12-13"},{"SOURCE_ROW_NUMBER":"1657924","VIOLATION_NO":"7031319","ISSUE_DT":"07/07/2016","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"994.00","CURRENT_ASSESSMENT_AMT":"646.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-07-07"},{"SOURCE_ROW_NUMBER":"1665502","VIOLATION_NO":"9073041","ISSUE_DT":"06/22/2016","CFR_STANDARD_CD":"72.630(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"157.00","CURRENT_ASSESSMENT_AMT":"157.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-06-22"},{"SOURCE_ROW_NUMBER":"1665501","VIOLATION_NO":"9073040","ISSUE_DT":"06/22/2016","CFR_STANDARD_CD":"75.220(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"1607.00","CURRENT_ASSESSMENT_AMT":"1607.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-06-22"},{"SOURCE_ROW_NUMBER":"1657915","VIOLATION_NO":"7031317","ISSUE_DT":"05/16/2016","CFR_STANDARD_CD":"75.403","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"285.00","CURRENT_ASSESSMENT_AMT":"285.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-05-16"},{"SOURCE_ROW_NUMBER":"1657914","VIOLATION_NO":"7031316","ISSUE_DT":"05/11/2016","CFR_STANDARD_CD":"75.220(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"484.00","CURRENT_ASSESSMENT_AMT":"484.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-05-11"},{"SOURCE_ROW_NUMBER":"1657913","VIOLATION_NO":"7031314","ISSUE_DT":"04/25/2016","CFR_STANDARD_CD":"75.517","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"634.00","CURRENT_ASSESSMENT_AMT":"634.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-04-25"},{"SOURCE_ROW_NUMBER":"1657911","VIOLATION_NO":"7026999","ISSUE_DT":"04/19/2016","CFR_STANDARD_CD":"75.403","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"162.00","CURRENT_ASSESSMENT_AMT":"162.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-04-19"},{"SOURCE_ROW_NUMBER":"1657912","VIOLATION_NO":"7031313","ISSUE_DT":"04/13/2016","CFR_STANDARD_CD":"75.333(d)(3)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-04-13"},{"SOURCE_ROW_NUMBER":"1657276","VIOLATION_NO":"7031059","ISSUE_DT":"02/11/2016","CFR_STANDARD_CD":"70.206(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-02-11"},{"SOURCE_ROW_NUMBER":"1657275","VIOLATION_NO":"7031058","ISSUE_DT":"02/09/2016","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-02-09"},{"SOURCE_ROW_NUMBER":"1657270","VIOLATION_NO":"7026994","ISSUE_DT":"02/08/2016","CFR_STANDARD_CD":"75.370(f)(3)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"150.00","CURRENT_ASSESSMENT_AMT":"150.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2016-02-08"}]},{"id":"msha-civil-penalty-dockets-decisions","name":"Civil Penalty Dockets and Decisions","domains":["compliance","legal"],"products":["docket lineage","decision outcomes","citation packet precedent"],"rowCount":123,"firstDate":"2004-06-07","lastDate":"2017-07-25","metrics":{"appeals":0,"decisions":123,"recentRows":0,"decisionPenalty":116711.8,"originalPenalty":292961},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"387783","VIOLATION_NO":"7031319","DOCKET_NO":"PENN 2017-0016","DECISION_DT":"07/25/2017","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"994.00","DECISION_PENALTY_AMT":"646.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2017-07-25"},{"SOURCE_ROW_NUMBER":"386691","VIOLATION_NO":"9073040","DOCKET_NO":"PENN 2017-0016","DECISION_DT":"07/25/2017","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1607.00","DECISION_PENALTY_AMT":"1607.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2017-07-25"},{"SOURCE_ROW_NUMBER":"381837","VIOLATION_NO":"7031155","DOCKET_NO":"PENN 2016-0157","DECISION_DT":"07/06/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"425.00","DECISION_PENALTY_AMT":"298.00","JUDGE_FIRST_NAME":"John","JUDGE_LAST_NAME":"Lewis","sourceDate":"2016-07-06"},{"SOURCE_ROW_NUMBER":"379930","VIOLATION_NO":"7026981","DOCKET_NO":"PENN 2016-0096","DECISION_DT":"05/03/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"176.00","DECISION_PENALTY_AMT":"176.00","JUDGE_FIRST_NAME":"John","JUDGE_LAST_NAME":"Lewis","sourceDate":"2016-05-03"},{"SOURCE_ROW_NUMBER":"379352","VIOLATION_NO":"7026980","DOCKET_NO":"PENN 2016-0096","DECISION_DT":"05/03/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"176.00","DECISION_PENALTY_AMT":"176.00","JUDGE_FIRST_NAME":"John","JUDGE_LAST_NAME":"Lewis","sourceDate":"2016-05-03"},{"SOURCE_ROW_NUMBER":"378293","VIOLATION_NO":"7031154","DOCKET_NO":"PENN 2016-0044","DECISION_DT":"03/31/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"687.00","DECISION_PENALTY_AMT":"515.00","JUDGE_FIRST_NAME":"John","JUDGE_LAST_NAME":"Lewis","sourceDate":"2016-03-31"},{"SOURCE_ROW_NUMBER":"375935","VIOLATION_NO":"7026385","DOCKET_NO":"PENN 2015-0288","DECISION_DT":"01/20/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"634.00","DECISION_PENALTY_AMT":"350.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2016-01-20"},{"SOURCE_ROW_NUMBER":"375685","VIOLATION_NO":"7026647","DOCKET_NO":"PENN 2015-0288","DECISION_DT":"01/20/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"634.00","DECISION_PENALTY_AMT":"634.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2016-01-20"},{"SOURCE_ROW_NUMBER":"116416","VIOLATION_NO":"7026927","DOCKET_NO":"PENN 2015-0288","DECISION_DT":"01/20/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1412.00","DECISION_PENALTY_AMT":"893.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2016-01-20"},{"SOURCE_ROW_NUMBER":"103873","VIOLATION_NO":"7041432","DOCKET_NO":"PENN 2014-127","DECISION_DT":"07/28/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"392.00","DECISION_PENALTY_AMT":"333.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2015-07-28"},{"SOURCE_ROW_NUMBER":"366352","VIOLATION_NO":"7026723","DOCKET_NO":"PENN 2015-0026","DECISION_DT":"06/30/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"585.00","DECISION_PENALTY_AMT":"585.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2015-06-30"},{"SOURCE_ROW_NUMBER":"354613","VIOLATION_NO":"7041236","DOCKET_NO":"PENN 2014-0156","DECISION_DT":"06/29/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1304.00","DECISION_PENALTY_AMT":"1304.00","JUDGE_FIRST_NAME":"Kenneth","JUDGE_LAST_NAME":"Andrews","sourceDate":"2015-06-29"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":1160,"firstDate":"2000-01-18","lastDate":"2016-12-14","metrics":{"recentRows":0,"cpdmSamples":61,"voidSamples":100,"validSamples":1060,"maxConcentration":5.912,"concentrationTotal":872.364},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1405060","CASS_NUM":"58166745","SMP_TAKEN_DT":"12/14/2016","CONC":".025","SMP_TYPE_CD_DESC":"NONDESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BACKHOE OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2016-12-14"},{"SOURCE_ROW_NUMBER":"311784","CASS_NUM":"58166265","SMP_TAKEN_DT":"12/14/2016","CONC":".067","SMP_TYPE_CD_DESC":"NONDESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2016-12-14"},{"SOURCE_ROW_NUMBER":"2862274","SMP_TAKEN_DT":"6/30/2016","CONC":".62","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-30"},{"SOURCE_ROW_NUMBER":"2947191","SMP_TAKEN_DT":"6/29/2016","CONC":".167","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-29"},{"SOURCE_ROW_NUMBER":"1925110","SMP_TAKEN_DT":"6/28/2016","CONC":".07","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"INVALID OR MISSING TIME","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-28"},{"SOURCE_ROW_NUMBER":"2095345","SMP_TAKEN_DT":"6/27/2016","CONC":".231","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-27"},{"SOURCE_ROW_NUMBER":"1923634","SMP_TAKEN_DT":"6/23/2016","CONC":".561","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-23"},{"SOURCE_ROW_NUMBER":"1923630","SMP_TAKEN_DT":"6/22/2016","CONC":".269","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-22"},{"SOURCE_ROW_NUMBER":"2349406","SMP_TAKEN_DT":"6/21/2016","CONC":"1.224","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-21"},{"SOURCE_ROW_NUMBER":"2264411","SMP_TAKEN_DT":"6/20/2016","CONC":".6","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-20"},{"SOURCE_ROW_NUMBER":"2263801","SMP_TAKEN_DT":"6/16/2016","CONC":".238","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"MOBILE BRIDGE OPERATOR","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-16"},{"SOURCE_ROW_NUMBER":"2519173","SMP_TAKEN_DT":"6/15/2016","CONC":".267","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"MOBILE BRIDGE OPERATOR","DEVICE_TYPE_CD":"CPDM","sourceDate":"2016-06-15"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":17,"firstDate":"2000-11-06","lastDate":"2011-02-24","metrics":{"linkedIssuances":17},"periods":{},"recentRecords":[]},{"id":"msha-contested-violations","name":"Contested Violations","domains":["compliance","legal"],"products":["contest status","time to resolution","contested-rate context"],"rowCount":120,"firstDate":"2003-08-06","lastDate":"2016-07-07","metrics":{"decisions":120,"ssChanged":20,"recentRows":0,"decisionPenalty":115473.8,"proposedPenalty":294754},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"97293","CITATION_NO":"7031319","CITATION_ISSUE_DT":"07/07/2016","DOCKET_NO":"PENN 2017-0016","DECISION_DT":"07/25/2017","CFR_STANDARD_CODE":"75.370(a)(1)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"994.00","DECISION_PENALTY_AMT":"646.00","sourceDate":"2016-07-07"},{"SOURCE_ROW_NUMBER":"154850","CITATION_NO":"9073040","CITATION_ISSUE_DT":"06/22/2016","DOCKET_NO":"PENN 2017-0016","DECISION_DT":"07/25/2017","CFR_STANDARD_CODE":"75.220(a)(1)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1607.00","DECISION_PENALTY_AMT":"1607.00","sourceDate":"2016-06-22"},{"SOURCE_ROW_NUMBER":"324834","CITATION_NO":"7026981","CITATION_ISSUE_DT":"11/06/2015","DOCKET_NO":"PENN 2016-0096","DECISION_DT":"05/03/2016","CFR_STANDARD_CODE":"75.517","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"176.00","DECISION_PENALTY_AMT":"176.00","sourceDate":"2015-11-06"},{"SOURCE_ROW_NUMBER":"96897","CITATION_NO":"7026980","CITATION_ISSUE_DT":"10/14/2015","DOCKET_NO":"PENN 2016-0096","DECISION_DT":"05/03/2016","CFR_STANDARD_CODE":"75.1714-3(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"176.00","DECISION_PENALTY_AMT":"176.00","sourceDate":"2015-10-14"},{"SOURCE_ROW_NUMBER":"206539","CITATION_NO":"7031155","CITATION_ISSUE_DT":"08/19/2015","DOCKET_NO":"PENN 2016-0157","DECISION_DT":"07/06/2016","CFR_STANDARD_CODE":"75.370(a)(1)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"425.00","DECISION_PENALTY_AMT":"298.00","sourceDate":"2015-08-19"},{"SOURCE_ROW_NUMBER":"96409","CITATION_NO":"7031154","CITATION_ISSUE_DT":"08/19/2015","DOCKET_NO":"PENN 2016-0044","DECISION_DT":"03/31/2016","CFR_STANDARD_CODE":"75.400","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"687.00","DECISION_PENALTY_AMT":"515.00","sourceDate":"2015-08-19"},{"SOURCE_ROW_NUMBER":"148816","CITATION_NO":"7026385","CITATION_ISSUE_DT":"05/27/2015","DOCKET_NO":"PENN 2015-0288","DECISION_DT":"01/20/2016","CFR_STANDARD_CODE":"75.1100-3","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"634.00","DECISION_PENALTY_AMT":"350.00","sourceDate":"2015-05-27"},{"SOURCE_ROW_NUMBER":"437027","CITATION_NO":"7026647","CITATION_ISSUE_DT":"05/13/2015","DOCKET_NO":"PENN 2015-0288","DECISION_DT":"01/20/2016","CFR_STANDARD_CODE":"75.1714-2(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"634.00","DECISION_PENALTY_AMT":"634.00","sourceDate":"2015-05-13"},{"SOURCE_ROW_NUMBER":"318791","CITATION_NO":"7026927","CITATION_ISSUE_DT":"01/06/2015","DOCKET_NO":"PENN 2015-0288","DECISION_DT":"01/20/2016","CFR_STANDARD_CODE":"75.220(a)(1)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1412.00","DECISION_PENALTY_AMT":"893.00","sourceDate":"2015-01-06"},{"SOURCE_ROW_NUMBER":"376995","CITATION_NO":"7026546","CITATION_ISSUE_DT":"11/19/2014","DOCKET_NO":"PENN 2015-0119","DECISION_DT":"06/29/2015","CFR_STANDARD_CODE":"75.1100-3","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1530.00","DECISION_PENALTY_AMT":"1000.00","sourceDate":"2014-11-19"},{"SOURCE_ROW_NUMBER":"320061","CITATION_NO":"7026723","CITATION_ISSUE_DT":"08/12/2014","DOCKET_NO":"PENN 2015-0026","DECISION_DT":"06/30/2015","CFR_STANDARD_CODE":"75.1714-3(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"585.00","DECISION_PENALTY_AMT":"585.00","sourceDate":"2014-08-12"},{"SOURCE_ROW_NUMBER":"37441","CITATION_NO":"7041540","CITATION_ISSUE_DT":"02/24/2014","DOCKET_NO":"PENN 2014-0822","DECISION_DT":"10/29/2014","CFR_STANDARD_CODE":"75.1200","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"1026.00","DECISION_PENALTY_AMT":"615.00","sourceDate":"2014-02-24"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":422,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":90,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":2,"firstDate":"1998-03-01","lastDate":"2003-08-25","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":1},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":221,"firstDate":"2000-01-05","lastDate":"2017-05-22","metrics":{"inspectors":330,"recentRows":0,"onSiteHours":6309.25,"inspectionHours":12745.75,"inspectionSamples":756},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"721011","EVENT_NO":"6231868","INSPECTION_BEGIN_DT":"05/22/2017","INSPECTION_END_DT":"05/22/2017","ACTIVITY_CODE":"E28","ACTIVITY":"Mine Idle Activity","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5.5","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2017-05-22"},{"SOURCE_ROW_NUMBER":"130638","EVENT_NO":"6231812","INSPECTION_BEGIN_DT":"05/17/2017","INSPECTION_END_DT":"05/17/2017","ACTIVITY_CODE":"E17","ACTIVITY":"Special Emphasis Programs","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8.25","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2017-05-17"},{"SOURCE_ROW_NUMBER":"356096","EVENT_NO":"6231769","INSPECTION_BEGIN_DT":"02/28/2017","INSPECTION_END_DT":"03/30/2017","ACTIVITY_CODE":"E17","ACTIVITY":"Special Emphasis Programs","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7.5","SUM_TOTAL_ON_SITE_HOURS":"3.5","sourceDate":"2017-02-28"},{"SOURCE_ROW_NUMBER":"718338","EVENT_NO":"6231487","INSPECTION_BEGIN_DT":"12/19/2016","INSPECTION_END_DT":"12/23/2016","ACTIVITY_CODE":"E17","ACTIVITY":"Special Emphasis Programs","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"9.75","SUM_TOTAL_ON_SITE_HOURS":"4.5","sourceDate":"2016-12-19"},{"SOURCE_ROW_NUMBER":"519513","EVENT_NO":"6231848","INSPECTION_BEGIN_DT":"12/12/2016","INSPECTION_END_DT":"01/09/2017","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"30.25","SUM_TOTAL_ON_SITE_HOURS":"14.5","sourceDate":"2016-12-12"},{"SOURCE_ROW_NUMBER":"777682","EVENT_NO":"6231121","INSPECTION_BEGIN_DT":"07/06/2016","INSPECTION_END_DT":"09/29/2016","ACTIVITY_CODE":"E17","ACTIVITY":"Special Emphasis Programs","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"52.75","SUM_TOTAL_ON_SITE_HOURS":"29.75","sourceDate":"2016-07-06"},{"SOURCE_ROW_NUMBER":"791653","EVENT_NO":"6231347","INSPECTION_BEGIN_DT":"07/05/2016","INSPECTION_END_DT":"08/18/2016","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"81.25","SUM_TOTAL_ON_SITE_HOURS":"40.5","sourceDate":"2016-07-05"},{"SOURCE_ROW_NUMBER":"120448","EVENT_NO":"6243607","INSPECTION_BEGIN_DT":"06/17/2016","INSPECTION_END_DT":"06/23/2016","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"19.75","SUM_TOTAL_ON_SITE_HOURS":"8","sourceDate":"2016-06-17"},{"SOURCE_ROW_NUMBER":"232149","EVENT_NO":"6231113","INSPECTION_BEGIN_DT":"05/05/2016","INSPECTION_END_DT":"06/30/2016","ACTIVITY_CODE":"E17","ACTIVITY":"Special Emphasis Programs","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"32.5","SUM_TOTAL_ON_SITE_HOURS":"18.75","sourceDate":"2016-05-05"},{"SOURCE_ROW_NUMBER":"785569","EVENT_NO":"6231342","INSPECTION_BEGIN_DT":"04/01/2016","INSPECTION_END_DT":"06/06/2016","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"162","SUM_TOTAL_ON_SITE_HOURS":"82","sourceDate":"2016-04-01"},{"SOURCE_ROW_NUMBER":"590848","EVENT_NO":"6243181","INSPECTION_BEGIN_DT":"01/19/2016","INSPECTION_END_DT":"01/26/2016","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"19","SUM_TOTAL_ON_SITE_HOURS":"7.5","sourceDate":"2016-01-19"},{"SOURCE_ROW_NUMBER":"1109763","EVENT_NO":"6231105","INSPECTION_BEGIN_DT":"01/05/2016","INSPECTION_END_DT":"03/18/2016","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"179","SUM_TOTAL_ON_SITE_HOURS":"99.5","sourceDate":"2016-01-05"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":194,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2017-Q1":{"hours":0,"employees":0,"production":0},"2016-Q4":{"hours":0,"employees":0,"production":0},"2016-Q3":{"hours":1096,"employees":6,"production":4204},"2016-Q2":{"hours":3479,"employees":6,"production":34337},"2016-Q1":{"hours":2658,"employees":6,"production":22869},"2015-Q4":{"hours":9030,"employees":17,"production":98818},"2015-Q3":{"hours":9382,"employees":17,"production":74151},"2015-Q2":{"hours":11114,"employees":20,"production":70476},"2015-Q1":{"hours":10829,"employees":19,"production":65665},"2014-Q4":{"hours":9912,"employees":18,"production":64982},"2014-Q3":{"hours":9608,"employees":19,"production":59393},"2014-Q2":{"hours":11235,"employees":19,"production":71288}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":38,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2007":{"hours":33340,"employees":15,"production":321758},"2008":{"hours":46146,"employees":20,"production":380425},"2009":{"hours":8051,"employees":14,"production":25797},"2010":{"hours":29195,"employees":13,"production":179386},"2011":{"hours":46900,"employees":19,"production":188609},"2012":{"hours":50172,"employees":24,"production":231756},"2013":{"hours":47880,"employees":20,"production":206524},"2014":{"hours":43373,"employees":19,"production":285863},"2015":{"hours":40355,"employees":18,"production":309110},"2016":{"hours":7233,"employees":6,"production":61410}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":152,"firstDate":"2000-03-20","lastDate":"2016-12-14","metrics":{"recentRows":0,"doseOver100":31,"actDoseTotal":10478,"pelDoseTotal":7803},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"163026","EVENT_NO":"6231848","SURVEY_DATE":"12/14/2016","OCCUPATION_CD_DESC":"BACKHOE OPERATOR","MACHINE_CD":"40","MANUFACTURER_CD":"018","ACT_DOSE_85":"5","PEL_DOSE_90":"1","SURVEY_TYPE":"I","sourceDate":"2016-12-14"},{"SOURCE_ROW_NUMBER":"163025","EVENT_NO":"6231848","SURVEY_DATE":"12/14/2016","OCCUPATION_CD_DESC":"BULLDOZER OPERATOR","MACHINE_CD":"03","MANUFACTURER_CD":"018","ACT_DOSE_85":"30","PEL_DOSE_90":"7","SURVEY_TYPE":"I","sourceDate":"2016-12-14"},{"SOURCE_ROW_NUMBER":"163012","EVENT_NO":"6231291","SURVEY_DATE":"12/14/2015","OCCUPATION_CD_DESC":"COAL DRILL HELPER","MACHINE_CD":"03","MANUFACTURER_CD":"067","ACT_DOSE_85":"81","PEL_DOSE_90":"76","SURVEY_TYPE":"I","sourceDate":"2015-12-14"},{"SOURCE_ROW_NUMBER":"163011","EVENT_NO":"6231291","SURVEY_DATE":"12/14/2015","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"40","MANUFACTURER_CD":"067","ACT_DOSE_85":"83","PEL_DOSE_90":"78","SURVEY_TYPE":"I","sourceDate":"2015-12-14"},{"SOURCE_ROW_NUMBER":"163010","EVENT_NO":"6231291","SURVEY_DATE":"12/14/2015","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"85","PEL_DOSE_90":"82","SURVEY_TYPE":"I","sourceDate":"2015-12-14"},{"SOURCE_ROW_NUMBER":"163009","EVENT_NO":"6231291","SURVEY_DATE":"12/14/2015","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"81","PEL_DOSE_90":"75","SURVEY_TYPE":"I","sourceDate":"2015-12-14"},{"SOURCE_ROW_NUMBER":"163008","EVENT_NO":"6231291","SURVEY_DATE":"12/14/2015","OCCUPATION_CD_DESC":"MOBILE BRIDGE OPERATOR","MACHINE_CD":"08","MANUFACTURER_CD":"067","ACT_DOSE_85":"74","PEL_DOSE_90":"71","SURVEY_TYPE":"I","sourceDate":"2015-12-14"},{"SOURCE_ROW_NUMBER":"163007","EVENT_NO":"6231291","SURVEY_DATE":"12/14/2015","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"76","PEL_DOSE_90":"73","SURVEY_TYPE":"I","sourceDate":"2015-12-14"},{"SOURCE_ROW_NUMBER":"163006","EVENT_NO":"6231291","SURVEY_DATE":"12/01/2015","OCCUPATION_CD_DESC":"HIGHLIFT OPERATOR/FRONT END LOADER","MACHINE_CD":"18","MANUFACTURER_CD":"018","ACT_DOSE_85":"72","PEL_DOSE_90":"67","SURVEY_TYPE":"I","sourceDate":"2015-12-01"},{"SOURCE_ROW_NUMBER":"163005","EVENT_NO":"6231291","SURVEY_DATE":"12/01/2015","OCCUPATION_CD_DESC":"FORKLIFT OPERATOR","MACHINE_CD":"17","MANUFACTURER_CD":"018","ACT_DOSE_85":"82","PEL_DOSE_90":"78","SURVEY_TYPE":"I","sourceDate":"2015-12-01"},{"SOURCE_ROW_NUMBER":"163016","EVENT_NO":"6231328","SURVEY_DATE":"06/16/2015","OCCUPATION_CD_DESC":"FORKLIFT OPERATOR","MACHINE_CD":"17","MANUFACTURER_CD":"017","ACT_DOSE_85":"9","PEL_DOSE_90":"0","SURVEY_TYPE":"I","sourceDate":"2015-06-16"},{"SOURCE_ROW_NUMBER":"163015","EVENT_NO":"6231328","SURVEY_DATE":"06/16/2015","OCCUPATION_CD_DESC":"HIGHLIFT OPERATOR/FRONT END LOADER","MACHINE_CD":"18","MANUFACTURER_CD":"018","ACT_DOSE_85":"2","PEL_DOSE_90":"0","SURVEY_TYPE":"I","sourceDate":"2015-06-16"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":70,"firstDate":"2000-06-12","lastDate":"2016-04-26","metrics":{"recentRows":0,"voidSamples":3,"maxQuartzPct":6,"validSamples":67,"quartzPctTotal":150.8},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"124203","CASSETTE_NO":"58248162","SAMPLE_DT":"04/26/2016","QUARTZ_PCT":"04.5","QUARTZ_MICROGRAMS":"14","OCC_CODE_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"MMU NOT IN PRODUCING STATUS","sourceDate":"2016-04-26"},{"SOURCE_ROW_NUMBER":"95062","CASSETTE_NO":"58248157","SAMPLE_DT":"04/26/2016","QUARTZ_PCT":"03.4","QUARTZ_MICROGRAMS":"8","OCC_CODE_DESC":"MOBILE BRIDGE OPERATOR","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"MMU NOT IN PRODUCING STATUS","sourceDate":"2016-04-26"},{"SOURCE_ROW_NUMBER":"62736","CASSETTE_NO":"58248145","SAMPLE_DT":"04/26/2016","QUARTZ_PCT":"02.1","QUARTZ_MICROGRAMS":"21","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2016-04-26"},{"SOURCE_ROW_NUMBER":"37197","CASSETTE_NO":"58248160","SAMPLE_DT":"04/26/2016","QUARTZ_PCT":"03.9","QUARTZ_MICROGRAMS":"5","OCC_CODE_DESC":"MOBILE BRIDGE OPERATOR","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"MMU NOT IN PRODUCING STATUS","sourceDate":"2016-04-26"},{"SOURCE_ROW_NUMBER":"125597","CASSETTE_NO":"58248313","SAMPLE_DT":"02/10/2016","QUARTZ_PCT":"01.6","QUARTZ_MICROGRAMS":"4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2016-02-10"},{"SOURCE_ROW_NUMBER":"60451","CASSETTE_NO":"58248215","SAMPLE_DT":"02/10/2016","QUARTZ_PCT":"02.2","QUARTZ_MICROGRAMS":"20","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2016-02-10"},{"SOURCE_ROW_NUMBER":"148471","CASSETTE_NO":"58248000","SAMPLE_DT":"12/01/2015","QUARTZ_PCT":"03.2","QUARTZ_MICROGRAMS":"16","OCC_CODE_DESC":"FORKLIFT OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED WORK POSITION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2015-12-01"},{"SOURCE_ROW_NUMBER":"17925","CASSETTE_NO":"58247911","SAMPLE_DT":"11/23/2015","QUARTZ_PCT":"01.6","QUARTZ_MICROGRAMS":"13","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2015-11-23"},{"SOURCE_ROW_NUMBER":"3589","CASSETTE_NO":"58247924","SAMPLE_DT":"11/23/2015","QUARTZ_PCT":"02.6","QUARTZ_MICROGRAMS":"11","OCC_CODE_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2015-11-23"},{"SOURCE_ROW_NUMBER":"120140","CASSETTE_NO":"58215784","SAMPLE_DT":"07/23/2015","QUARTZ_PCT":"01.9","QUARTZ_MICROGRAMS":"8","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2015-07-23"},{"SOURCE_ROW_NUMBER":"42743","CASSETTE_NO":"58216068","SAMPLE_DT":"05/19/2015","QUARTZ_PCT":"02.3","QUARTZ_MICROGRAMS":"4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2015-05-19"},{"SOURCE_ROW_NUMBER":"23229","CASSETTE_NO":"58216055","SAMPLE_DT":"05/19/2015","QUARTZ_PCT":"01.6","QUARTZ_MICROGRAMS":"11","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2015-05-19"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":616,"firstDate":"2000-01-06","lastDate":"2016-12-13","metrics":{"ss":176,"amountDue":175256.8,"contested":84,"amountPaid":174956.8,"recentRows":0,"section104d":6,"unterminated":0,"proposedPenalty":348467},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1952895","VIOLATION_NO":"7031387","VIOLATION_ISSUE_DT":"12/13/2016","SIG_SUB":"N","PART_SECTION":"77.1713(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"12/14/2016","PROPOSED_PENALTY":"116","AMOUNT_DUE":"116","AMOUNT_PAID":"116","CONTESTED_IND":"N","sourceDate":"2016-12-13"},{"SOURCE_ROW_NUMBER":"1952662","VIOLATION_NO":"7031319","VIOLATION_ISSUE_DT":"07/07/2016","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"5","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/07/2016","PROPOSED_PENALTY":"994","AMOUNT_DUE":"646","AMOUNT_PAID":"646","CONTESTED_IND":"N","sourceDate":"2016-07-07"},{"SOURCE_ROW_NUMBER":"1952581","VIOLATION_NO":"9073041","VIOLATION_ISSUE_DT":"06/22/2016","SIG_SUB":"N","PART_SECTION":"72.630(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Permanent","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/22/2016","PROPOSED_PENALTY":"157","AMOUNT_DUE":"157","AMOUNT_PAID":"157","CONTESTED_IND":"N","sourceDate":"2016-06-22"},{"SOURCE_ROW_NUMBER":"1952580","VIOLATION_NO":"9073040","VIOLATION_ISSUE_DT":"06/22/2016","SIG_SUB":"Y","PART_SECTION":"75.220(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Fatal","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/22/2016","PROPOSED_PENALTY":"1607","AMOUNT_DUE":"1607","AMOUNT_PAID":"1607","CONTESTED_IND":"N","sourceDate":"2016-06-22"},{"SOURCE_ROW_NUMBER":"1952492","VIOLATION_NO":"7031317","VIOLATION_ISSUE_DT":"05/16/2016","SIG_SUB":"N","PART_SECTION":"75.403","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"5","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/16/2016","PROPOSED_PENALTY":"285","AMOUNT_DUE":"285","AMOUNT_PAID":"285","CONTESTED_IND":"N","sourceDate":"2016-05-16"},{"SOURCE_ROW_NUMBER":"1952491","VIOLATION_NO":"7031316","VIOLATION_ISSUE_DT":"05/11/2016","SIG_SUB":"Y","PART_SECTION":"75.220(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/11/2016","PROPOSED_PENALTY":"484","AMOUNT_DUE":"484","AMOUNT_PAID":"484","CONTESTED_IND":"N","sourceDate":"2016-05-11"},{"SOURCE_ROW_NUMBER":"1952490","VIOLATION_NO":"7031314","VIOLATION_ISSUE_DT":"04/25/2016","SIG_SUB":"Y","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Fatal","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"04/25/2016","PROPOSED_PENALTY":"634","AMOUNT_DUE":"634","AMOUNT_PAID":"634","CONTESTED_IND":"N","sourceDate":"2016-04-25"},{"SOURCE_ROW_NUMBER":"1952488","VIOLATION_NO":"7026999","VIOLATION_ISSUE_DT":"04/19/2016","SIG_SUB":"N","PART_SECTION":"75.403","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/20/2016","PROPOSED_PENALTY":"162","AMOUNT_DUE":"162","AMOUNT_PAID":"162","CONTESTED_IND":"N","sourceDate":"2016-04-19"},{"SOURCE_ROW_NUMBER":"1952489","VIOLATION_NO":"7031313","VIOLATION_ISSUE_DT":"04/13/2016","SIG_SUB":"N","PART_SECTION":"75.333(d)(3)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"04/14/2016","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2016-04-13"},{"SOURCE_ROW_NUMBER":"1952358","VIOLATION_NO":"7031059","VIOLATION_ISSUE_DT":"02/11/2016","SIG_SUB":"N","PART_SECTION":"70.206(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/11/2016","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2016-02-11"},{"SOURCE_ROW_NUMBER":"1952357","VIOLATION_NO":"7031058","VIOLATION_ISSUE_DT":"02/09/2016","SIG_SUB":"N","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/10/2016","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2016-02-09"},{"SOURCE_ROW_NUMBER":"1952352","VIOLATION_NO":"7026994","VIOLATION_ISSUE_DT":"02/08/2016","SIG_SUB":"N","PART_SECTION":"75.370(f)(3)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"5","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/08/2016","PROPOSED_PENALTY":"150","AMOUNT_DUE":"150","AMOUNT_PAID":"150","CONTESTED_IND":"N","sourceDate":"2016-02-08"}]}],"safety":{"href":"/api/v1/mines/3608725/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/3608725/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.1713","heading":"Daily inspection of surface coal mine; certified person; reports of inspection.","id":"77.1713","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-R/section-77.1713","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) At least once during each working shift, or more often if necessary for safety, each active working area and each active surface installation shall be examined by a certified person designated by the operator to conduct such examinations for hazardous conditions and any hazardous conditions noted during such examinations shall be reported to the operator and shall be corrected by the operator.\n\n(b) If any hazardous condition noted during an examination conducted in accordance with paragraph (a) of this section creates an imminent danger, the person conducting such examination shall notify the operator and the operator shall withdraw all persons from the area affected, except those persons referred to in section 104(d) of the Act, until the danger is abated.\n\n(c) After each examination conducted in accordance with the provisions of paragraph (a) of this section, each certified person who conducted all or any part of the examination required shall enter with ink or indelible pencil in a book approved by the Secretary the date and a report of the condition of the mine or any area of the mine which he has inspected together with a report of the nature and location of any hazardous condition found to be present at the mine. The book in which such entries are made shall be kept in an area at the mine designated by the operator to minimize the danger of destruction by fire or other hazard.\n\n(d) All examination reports recorded in accordance with the provisions of paragraph (c) of this section shall include a report of the action taken to abate hazardous conditions and shall be signed or countersigned each day by at least one of the following persons:\n\n(1) The surface mine foreman;\n\n(2) The assistant superintendent of the mine;\n\n(3) The superintendent of the mine;\n\n(4) The person designated by the operator as responsible for health and safety at the mine; or,\n\n(5) An equivalent mine official.\n\n(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))\n\n[36 FR 9364, May 22, 1971, as amended at 60 FR 33723, June 29, 1995; 63 FR 58613, Oct. 30, 1998]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 72.630","heading":"Drill dust control at underground areas of underground mines.","id":"72.630","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-72/subpart-E/section-72.630","part":"72","partHeading":"PART 72—HEALTH STANDARDS FOR COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Miscellaneous","text":"(a) Dust resulting from drilling in rock shall be controlled by use of permissible dust collectors, or by water, or water with a wetting agent, or by ventilation, or by any other method or device approved by the Secretary that is as effective in controlling the dust.\n\n(b) Dust collectors. Dust collectors shall be maintained in permissible and operating condition. Dust collectors approved under Part 33—Dust Collectors for Use in Connection with Rock Drilling in Coal Mines of this title or under Bureau of Mines Schedule 25B are permissible dust collectors for the purpose of this section.\n\n(c) Water control. Water used to control dust from drilling rock shall be applied through a hollow drill steel or stem or by the flooding of vertical drill holes in the floor.\n\n(d) Ventilation control. To adequately control dust from drilling rock, the air current shall be so directed that the dust is readily dispersed and carried away from the drill operator or any other miners in the area.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.220","heading":"Roof control plan.","id":"75.220","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"C","subpartHeading":"Subpart C—Roof Support","text":"(a)(1) Each mine operator shall develop and follow a roof control plan, approved by the District Manager, that is suitable to the prevailing geological conditions, and the mining system to be used at the mine. Additional measures shall be taken to protect persons if unusual hazards are encountered.\n\n(2) The proposed roof control plan and any revisions to the plan shall be submitted, in writing, to the District Manager. When revisions to a roof control plan are proposed, only the revised pages need to be submitted unless otherwise specified by the District Manager.\n\n(b)(1) The mine operator will be notified in writing of the approval or denial of approval of a proposed roof control plan or proposed revision.\n\n(2) When approval of a proposed plan or revision is denied, the deficiencies of the plan or revision and recommended changes will be specified and the mine operator will be afforded an opportunity to discuss the deficiencies and changes with the District Manager.\n\n(3) Before new support materials, devices or systems other than roof bolts and accessories, are used as the only means of roof support, the District Manager may require that their effectiveness be demonstrated by experimental installations.\n\n(c) No proposed roof control plan or revision to a roof control plan shall be implemented before it is approved.\n\n(d) Before implementing an approved revision to a roof control plan, all persons who are affected by the revision shall be instructed in its provisions.\n\n(e) The approved roof control plan and any revisions shall be available to the miners and representative of miners at the mine.\n\n[53 FR 2375, Jan. 27, 1988; 53 FR 11395, Apr. 6, 1988, as amended at 60 FR 33723, June 29, 1995; 71 FR 16668, Apr. 3, 2006]","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.403","heading":"Maintenance of incombustible content of rock dust.","id":"75.403","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.403","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Where rock dust is required to be applied, it shall be distributed upon the top, floor, and sides of all underground areas of a coal mine and maintained in such quantities that the incombustible content of the combined coal dust, rock dust, and other dust shall be not less than 80 percent. Where methane is present in any ventilating current, the percent of incombustible content of such combined dust shall be increased 0.4 percent for each 0.1 percent of methane.\n\n[75 FR 57857, Sept. 23, 2010; 76 FR 35978, June 21, 2011]","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.517","heading":"Power wires and cables; insulation and protection.","id":"75.517","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.517","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nPower wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately and fully protected.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.333","heading":"Ventilation controls.","id":"75.333","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) For purposes of this section, “doors” include any door frames.\n\n(b) Permanent stoppings or other permanent ventilation control devices constructed after November 15, 1992, shall be built and maintained—\n\n(1) Between intake and return air courses, except temporary controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the room was developed including where continuous face haulage systems are used in such rooms. Unless otherwise approved in the ventilation plan, these stoppings or controls shall be maintained to and including the third connecting crosscut outby the working face;\n\n(2) To separate belt conveyor haulageways from return air courses, except where belt entries in areas of mines developed before March 30, 1970, are used as return air courses;\n\n(3) To separate belt conveyor haulageways from intake air courses when the air in the intake air courses is used to provide air to active working places. Temporary ventilation controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the rooms were developed including where continuous face haulage systems are used in such rooms. When continuous face haulage systems are used, permanent stoppings or other permanent ventilation control devices shall be built and maintained to the outby most point of travel of the dolly or 600 feet from the point of deepest penetration in the conveyor belt entry, whichever distance is closer to the point of deepest penetration, to separate the continuous haulage entry from the intake entries;\n\n(4) To separate the primary escapeway from belt and trolley haulage entries, as required by § 75.380(g). For the purposes of § 75.380(g), the loading point for a continuous haulage system shall be the outby most point of travel of the dolly or 600 feet from the point of deepest penetration, whichever distance is less; and\n\n(5) In return air courses to direct air into adjacent worked-out areas.\n\n(c) Personnel doors shall be constructed of noncombustible material and shall be of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between air courses, and shall be installed as follows in permanent stoppings constructed after November 15, 1992:\n\n(1) The distance between personnel doors shall be no more than 300 feet in seam heights below 48 inches and 600 feet in seam heights 48 inches or higher.\n\n(2) The location of all personnel doors in stoppings along escapeways shall be clearly marked so that the doors may be easily identified by anyone traveling in the escapeway and in the entries on either side of the doors.\n\n(3) When not in use, personnel doors shall be closed.\n\n(4) An airlock shall be established where the air pressure differential between air courses creates a static force exceeding 125 pounds on closed personnel doors along escapeways.\n\n(d) Doors, other than personnel doors, constructed after November 15, 1992, that are used in lieu of permanent stoppings or to control ventilation within an air course shall be:\n\n(1) Made of noncombustible material or coated on all accessible surfaces with flame-retardant materials having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(2) Of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between or within air courses or entries.\n\n(3) Installed in pairs to form an airlock. When an airlock is used, one side of the airlock shall remain closed. When not in use, both sides shall be closed.\n\n(e)(1)(i) Except as provided in paragraphs (e)(2), (3), and (4) of this section, all overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after June 10, 1996, shall be constructed in a traditionally accepted method and of materials that have been demonstrated to perform adequately or in a method and of materials that have been tested and shown to have a minimum strength equal to or greater than the traditionally accepted in-mine controls. Tests may be performed under ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction” (Section 12-Transverse Load-Specimen Vertical, load, only), or the operator may conduct comparative in-mine tests. In-mine tests shall be designed to demonstrate the comparative strength of the proposed construction and a traditionally accepted in-mine control. The publication ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction,” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(ii) All overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after November 15, 1992, shall be constructed of noncombustible material. Materials that are suitable for the construction of overcasts, undercasts, shaft partitions, permanent stoppings, and regulators include concrete, concrete block, brick, cinder block, tile, or steel. No ventilation controls installed after November 15, 1992, shall be constructed of aluminum.\n\n(2) In anthracite mines, permanent stoppings may be constructed of overlapping layers of hardwood mine boards, if the stoppings are a minimum 2 inches thick.\n\n(3) When timbers are used to create permanent stoppings in heaving or caving areas, the stoppings shall be coated on all accessible surfaces with a flame-retardant material having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(4) In anthracite mines, doors and regulators may be constructed of overlapping layers of hardwood boards, if the doors, door frames, and regulators are a minimum 2 inches thick.\n\n(f) When sealants are applied to ventilation controls, the sealant shall have a flame-spread index of 25 or less under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(g) Before mining is discontinued in an entry or room that is advanced more than 20 feet from the inby rib, a crosscut shall be made or line brattice shall be installed and maintained to provide adequate ventilation. When conditions such as methane liberation warrant a distance less than 20 feet, the approved ventilation plan shall specify the location of such rooms or entries and the maximum distance they will be developed before a crosscut is made or line brattice is installed.\n\n(h) All ventilation controls, including seals, shall be maintained to serve the purpose for which they were built.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996; 61 FR 26442, May 28, 1996; 61 FR 29288, 29289, June 10, 1996, as amended at 67 FR 38386, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 73 FR 80612, Dec. 31, 2008; 80 FR 52991, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"3608725","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}