{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"3608508","name":"Barbara #2 Mine","status":"Abandoned","status_date":"2020-11-24","mine_type":"Surface","coal_metal":"C","commodity":"Coal (Bituminous)","state":"PA","county":"Somerset","nearest_town":"Berlin","operator_id":"P24228","operator_name":"RoxCoal, Inc","controller_id":"0077457","controller_name":"Quintana Capital Group GP Ltd","district":"C03","office":"Indiana PA Field Office","employees":0,"latitude":39.955556,"longitude":-78.921944},"coverage":{"contributingSources":17,"registeredSources":20,"sourceRows":1592},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"3608508","name":"Barbara #2 Mine"},"operator":{"type":"operator","id":"P24228","name":"RoxCoal, Inc"},"controller":{"type":"controller","id":"0077457","name":"Quintana Capital Group GP Ltd"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C08973","name":"NSM PLC"},"object":{"type":"mine","id":"3608508","name":"Barbara #2 Mine"},"validFrom":"1990-06-18","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|C08973|1990-06-18|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P21394","name":"Rox Coal Inc"},"object":{"type":"mine","id":"3608508","name":"Barbara #2 Mine"},"validFrom":"1995-03-01","validTo":"1998-03-05","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P21394|1995-03-01|1998-03-05"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C08973","name":"NSM PLC"},"object":{"type":"operator","id":"P21394","name":"Rox Coal Inc"},"validFrom":"1995-03-01","validTo":"1998-03-05","current":false,"derived":true,"evidenceMineId":"3608508","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P21394|1995-03-01|C08973|1990-06-18|78561"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P24228","name":"Rox Coal Inc"},"object":{"type":"mine","id":"3608508","name":"Barbara #2 Mine"},"validFrom":"1998-03-06","validTo":"2000-01-09","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P24228|1998-03-06|2000-01-09"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15843","name":"Severstal Resources"},"object":{"type":"mine","id":"3608508","name":"Barbara #2 Mine"},"validFrom":"1998-03-06","validTo":"2014-08-19","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|C15843|1998-03-06|2014-08-19"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15843","name":"Severstal Resources"},"object":{"type":"operator","id":"P24228","name":"Rox Coal Inc"},"validFrom":"1998-03-06","validTo":"2000-01-09","current":false,"derived":true,"evidenceMineId":"3608508","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P24228|1998-03-06|C15843|1998-03-06|97078"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P24330","name":"Dunmire Resources Inc"},"object":{"type":"mine","id":"3608508","name":"Barbara #2 Mine"},"validFrom":"2000-01-10","validTo":"2001-05-20","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P24330|2000-01-10|2001-05-20"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15893","name":"Thomas L  Dunmire"},"object":{"type":"mine","id":"3608508","name":"Barbara #2 Mine"},"validFrom":"2000-01-10","validTo":"2001-05-20","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|C15893|2000-01-10|2001-05-20"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15893","name":"Thomas L  Dunmire"},"object":{"type":"operator","id":"P24330","name":"Dunmire Resources Inc"},"validFrom":"2000-01-10","validTo":"2001-05-20","current":false,"derived":true,"evidenceMineId":"3608508","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P24330|2000-01-10|C15893|2000-01-10|97508"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P24228","name":"RoxCoal, Inc"},"object":{"type":"mine","id":"3608508","name":"Barbara #2 Mine"},"validFrom":"2001-05-21","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P24228|2001-05-21|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15843","name":"Severstal Resources"},"object":{"type":"operator","id":"P24228","name":"RoxCoal, Inc"},"validFrom":"2001-05-21","validTo":"2014-08-19","current":false,"derived":true,"evidenceMineId":"3608508","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P24228|2001-05-21|C15843|1998-03-06|97079"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0077457","name":"Quintana Capital Group GP Ltd et al"},"object":{"type":"mine","id":"3608508","name":"Barbara #2 Mine"},"validFrom":"2014-08-20","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|0077457|2014-08-20|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0077457","name":"Quintana Capital Group GP Ltd et al"},"object":{"type":"operator","id":"P24228","name":"Rox Coal Inc"},"validFrom":"2014-08-20","validTo":"2000-01-09","current":false,"derived":true,"evidenceMineId":"3608508","intervalAnomaly":true,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P24228|1998-03-06|0077457|2014-08-20|12190"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0077457","name":"Quintana Capital Group GP Ltd et al"},"object":{"type":"operator","id":"P24228","name":"RoxCoal, Inc"},"validFrom":"2014-08-20","validTo":null,"current":true,"derived":true,"evidenceMineId":"3608508","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"3608508|P24228|2001-05-21|0077457|2014-08-20|12191"}}],"coverage":{"historyRecords":6,"edgeCount":14,"intervalAnomalies":1,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":16,"firstDate":"2000-02-05","lastDate":"2014-12-19","metrics":{"daysLost":162,"injuries":10,"fatalities":0,"recentRows":0,"restrictedDays":43,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"222093","DOCUMENT_NO":"220143560037","ACCIDENT_DT":"12/19/2014","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"An unintentional roof fall has occurred in the 2 main section at 6:50am on 12-19-2014 the fall measured 18 feet wide by 50 feet long in # 5 entry and 18 feet wide by 20 feet long in the 5-6 entry the fall is approximately 15 feet high","sourceDate":"2014-12-19"},{"SOURCE_ROW_NUMBER":"28605","DOCUMENT_NO":"220143450027","ACCIDENT_DT":"12/08/2014","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Scoop tram operator, Load/Haul/Dump operator","NO_INJURIES":"1","DAYS_LOST":"1","NARRATIVE":"Employee was changing scoop batteries when he lifted the lids on the batteries he placed on charge it slipped and struck him on the left hand causing a laceration to his middle finger resulting in 6 stitches","sourceDate":"2014-12-08"},{"SOURCE_ROW_NUMBER":"226396","DOCUMENT_NO":"220143420026","ACCIDENT_DT":"12/03/2014","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"FALL OF FACE/RIB/PILLAR/SIDE/HIGHWALL","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"148","NARRATIVE":"Miner was operating helper side of roof bolting machine when a piece of rock fell off of rib and struck the employee on the right leg","sourceDate":"2014-12-03"},{"SOURCE_ROW_NUMBER":"166252","DOCUMENT_NO":"220132270024","ACCIDENT_DT":"05/21/2013","DEGREE_INJURY":"DAYS RESTRICTED ACTIVITY ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Assistant mine foreman, Assistant mine manager","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"The man was picking up a water pump when it slipped in his hands causing a pain in his right elbow. The man continued to work regular duties until 8-15-13 at which time he went on restricted duty status.","sourceDate":"2013-05-21"},{"SOURCE_ROW_NUMBER":"226397","DOCUMENT_NO":"220123450026","ACCIDENT_DT":"12/06/2012","DEGREE_INJURY":"DAYS RESTRICTED ACTIVITY ONLY","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Caught in, under or between a moving and a stationary object","OCCUPATION":"Discontinued 1/31/2014.  Several other codes cover Scoop Car Operator","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"The injured person didn't realize his foot was under the edge of the skid of lumber he was putting a come-along across as the forks were on the ground but tilted slightly upward. The operator was getting out of the machine to assist. He lowered the forks to ensure they were on the ground and they tilted forward onto the man's foot.","sourceDate":"2012-12-06"},{"SOURCE_ROW_NUMBER":"191878","DOCUMENT_NO":"220003610006","ACCIDENT_DT":"12/13/2000","DEGREE_INJURY":"DYS AWY FRM WRK & RESTRCTD ACT","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck by powered moving object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"12","NARRATIVE":"THE MAN WALKED FROM #7 ENTRY TO #5 ENTRY TO RECOVER HIS HAMMER AND ON THE WAY BACK HE CAME INBY IN #6 ENTRY. THE SHUTTLE CAR CAME AROUND THE CORNER AND CAUGHT HIM AGAINST THE RIB.","sourceDate":"2000-12-13"},{"SOURCE_ROW_NUMBER":"230739","DOCUMENT_NO":"220003180209","ACCIDENT_DT":"11/01/2000","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"1","NARRATIVE":"EE LOWERED THE BOLTER HEAD BOOM STRIKING HIS LEFT LEG. POSSIBLE DEEP BRUISE TO AREA ABOVE KNEE","sourceDate":"2000-11-01"},{"SOURCE_ROW_NUMBER":"273691","DOCUMENT_NO":"220002550102","ACCIDENT_DT":"08/30/2000","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"THIS WAS AN OUTBY INTAKE AREA, WHERE OTHER FALLS HAVE OCCURRED. THE AREA WAS BOLTED WITH 4' RESIN BOLTS AND THE FALLS ALL ARE 4' HIGH. IF 6' BOLTS WERE USED, THE FALLS--IN ALL LIKELIHOOD--WO ULDN'T HAVE HAPPENED.","sourceDate":"2000-08-30"},{"SOURCE_ROW_NUMBER":"45755","DOCUMENT_NO":"220002550043","ACCIDENT_DT":"08/30/2000","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"THERE WAS A VERY LARGE MUD SLIP ACROSS THE INTERSECTION. IT WAS BOLTED WITH 6' FULLY GROUTED RESIN AND HAD 9' COMBINATION BOLTS SPOTTED BETWEEN THE T-5 CHANNELS. THE AREA HAD A ROW OF CRIBS NA RROWING WIDTHS AND DOWN TO 14'. NOTHING WAS NOTICED ON THE WEEKLY EXAMINATION 1 WEEK PRIOR.","sourceDate":"2000-08-30"},{"SOURCE_ROW_NUMBER":"144621","DOCUMENT_NO":"220001710100","ACCIDENT_DT":"06/08/2000","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"A ROOF FALL OCCURRED AT THE FACE OF #3 ENTRY FROM THE FACE, WHICH WAS BOLTED WITH 6' FULLY GROUTED RESIN BOLTS WITH T-5 CHANNELS AND HAD ADDITIONAL 9' DOUBLE LOC BOLTS AS EXTRA SUPPORT. THERE WAS 2 CLAY VEINS THAT CONVERGED IN THE ROOF ABOVE THE ANCHORAGE AREA AND HAD A LARGE AMOUNT OF MUD IN THE INTERSECTION OF THE 2 CLAY VEINS.","sourceDate":"2000-06-08"},{"SOURCE_ROW_NUMBER":"118705","DOCUMENT_NO":"220001180022","ACCIDENT_DT":"04/20/2000","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Caught in, under or between NEC","OCCUPATION":"Continuous miner operator, Coal mole operator","NO_INJURIES":"1","NARRATIVE":"EMPLOYEE WAS HELPING UNCOUPLE A SUPPLY TRAILER FROM THE SCOOP WHEN THE SCOOP MOVED AND THE TRAILER SLIPPED SIDEWAYS IN A MUDDY RUT.","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"183450","DOCUMENT_NO":"220001030015","ACCIDENT_DT":"04/01/2000","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","NARRATIVE":"WHILE ROOF BOLTING IN A HIGH SPOT THE EMPLOYEE WAS ADDING ANOTHER STEEL AND THE STEEL STAYED IN THE HOLE. WHILE HE WAS PUTTING THE OTHER STEEL IN PLACE, THE STEEL LODGED IN THE ROOF FELL STRIKING HIM ON HIS RIGHT THUMB.","sourceDate":"2000-04-01"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2020-11-24","lastDate":"2020-11-24","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":119,"firstDate":"2000-03-09","lastDate":"2020-05-21","metrics":{"ss":18,"delinquent":117,"recentRows":0,"paidPenalty":17828,"proposedPenalty":18016,"currentAssessment":17949},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1661639","VIOLATION_NO":"9202095","ISSUE_DT":"05/21/2020","CFR_STANDARD_CD":"77.1607(k)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"306.00","CURRENT_ASSESSMENT_AMT":"306.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2020-05-21"},{"SOURCE_ROW_NUMBER":"1660918","VIOLATION_NO":"9071601","ISSUE_DT":"01/03/2018","CFR_STANDARD_CD":"77.502","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"118.00","CURRENT_ASSESSMENT_AMT":"118.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2018-01-03"},{"SOURCE_ROW_NUMBER":"1660917","VIOLATION_NO":"9071600","ISSUE_DT":"01/03/2018","CFR_STANDARD_CD":"77.1713(c)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"118.00","CURRENT_ASSESSMENT_AMT":"118.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2018-01-03"},{"SOURCE_ROW_NUMBER":"682730","VIOLATION_NO":"7032602","ISSUE_DT":"02/12/2015","CFR_STANDARD_CD":"75.310(c)(5)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-02-12"},{"SOURCE_ROW_NUMBER":"682729","VIOLATION_NO":"7029100","ISSUE_DT":"01/14/2015","CFR_STANDARD_CD":"75.807","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-01-14"},{"SOURCE_ROW_NUMBER":"682600","VIOLATION_NO":"7029096","ISSUE_DT":"12/17/2014","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-12-17"},{"SOURCE_ROW_NUMBER":"682599","VIOLATION_NO":"7029095","ISSUE_DT":"12/16/2014","CFR_STANDARD_CD":"75.360(b)(11)(iii)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"634.00","CURRENT_ASSESSMENT_AMT":"634.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"682598","VIOLATION_NO":"7029094","ISSUE_DT":"12/16/2014","CFR_STANDARD_CD":"75.333(h)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"682597","VIOLATION_NO":"7029092","ISSUE_DT":"12/16/2014","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"682596","VIOLATION_NO":"7029091","ISSUE_DT":"12/16/2014","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"634.00","CURRENT_ASSESSMENT_AMT":"634.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"682595","VIOLATION_NO":"7029088","ISSUE_DT":"12/08/2014","CFR_STANDARD_CD":"75.503","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-12-08"},{"SOURCE_ROW_NUMBER":"682594","VIOLATION_NO":"7029086","ISSUE_DT":"11/25/2014","CFR_STANDARD_CD":"75.1716","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"745.00","CURRENT_ASSESSMENT_AMT":"745.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-11-25"}]},{"id":"msha-civil-penalty-dockets-decisions","name":"Civil Penalty Dockets and Decisions","domains":["compliance","legal"],"products":["docket lineage","decision outcomes","citation packet precedent"],"rowCount":13,"firstDate":"2000-08-29","lastDate":"2016-06-07","metrics":{"appeals":0,"decisions":13,"recentRows":0,"decisionPenalty":1072,"originalPenalty":1579},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"116415","VIOLATION_NO":"7029093","DOCKET_NO":"PENN 2015-0278","DECISION_DT":"06/07/2016","DECISION_TYPE_CODE_DESC":"Withdrawal","ORIGINAL_PENALTY_AMT":"285.00","DECISION_PENALTY_AMT":"0.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2016-06-07"},{"SOURCE_ROW_NUMBER":"353404","VIOLATION_NO":"8010676","DOCKET_NO":"PENN 2014-72","DECISION_DT":"05/15/2014","DECISION_TYPE_CODE_DESC":"Withdrawal","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"0.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2014-05-15"},{"SOURCE_ROW_NUMBER":"98357","VIOLATION_NO":"7057982","DOCKET_NO":"PENN 2013-252","DECISION_DT":"03/18/2014","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2014-03-18"},{"SOURCE_ROW_NUMBER":"348589","VIOLATION_NO":"7051585","DOCKET_NO":"PENN 2013-333","DECISION_DT":"02/27/2014","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"224.00","DECISION_PENALTY_AMT":"179.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2014-02-27"},{"SOURCE_ROW_NUMBER":"343012","VIOLATION_NO":"7050768","DOCKET_NO":"PENN 2013-211","DECISION_DT":"12/24/2013","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Janet","JUDGE_LAST_NAME":"Harner","sourceDate":"2013-12-24"},{"SOURCE_ROW_NUMBER":"87977","VIOLATION_NO":"7057794","DOCKET_NO":"PENN 2012-315","DECISION_DT":"04/22/2013","DECISION_TYPE_CODE_DESC":"Default","ORIGINAL_PENALTY_AMT":"243.00","DECISION_PENALTY_AMT":"243.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2013-04-22"},{"SOURCE_ROW_NUMBER":"87918","VIOLATION_NO":"7057793","DOCKET_NO":"PENN 2012-315","DECISION_DT":"04/22/2013","DECISION_TYPE_CODE_DESC":"Default","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2013-04-22"},{"SOURCE_ROW_NUMBER":"87511","VIOLATION_NO":"7057795","DOCKET_NO":"PENN 2012-315","DECISION_DT":"04/22/2013","DECISION_TYPE_CODE_DESC":"Default","ORIGINAL_PENALTY_AMT":"108.00","DECISION_PENALTY_AMT":"108.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2013-04-22"},{"SOURCE_ROW_NUMBER":"478914","VIOLATION_NO":"7050813","DOCKET_NO":"PENN20000170","DECISION_DT":"08/29/2000","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"66.00","DECISION_PENALTY_AMT":"66.00","JUDGE_FIRST_NAME":"Jacqueline","JUDGE_LAST_NAME":"Bulluck","sourceDate":"2000-08-29"},{"SOURCE_ROW_NUMBER":"478913","VIOLATION_NO":"7050810","DOCKET_NO":"PENN20000170","DECISION_DT":"08/29/2000","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"66.00","DECISION_PENALTY_AMT":"55.00","JUDGE_FIRST_NAME":"Jacqueline","JUDGE_LAST_NAME":"Bulluck","sourceDate":"2000-08-29"},{"SOURCE_ROW_NUMBER":"478912","VIOLATION_NO":"7017594","DOCKET_NO":"PENN20000170","DECISION_DT":"08/29/2000","DECISION_TYPE_CODE_DESC":"Withdrawal","ORIGINAL_PENALTY_AMT":"55.00","DECISION_PENALTY_AMT":"0.00","JUDGE_FIRST_NAME":"Jacqueline","JUDGE_LAST_NAME":"Bulluck","sourceDate":"2000-08-29"},{"SOURCE_ROW_NUMBER":"478717","VIOLATION_NO":"7050816","DOCKET_NO":"PENN20000170","DECISION_DT":"08/29/2000","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"66.00","DECISION_PENALTY_AMT":"66.00","JUDGE_FIRST_NAME":"Jacqueline","JUDGE_LAST_NAME":"Bulluck","sourceDate":"2000-08-29"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":322,"firstDate":"2000-02-21","lastDate":"2020-07-21","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":44,"validSamples":278,"maxConcentration":13.257,"concentrationTotal":161.106},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"747203","CASS_NUM":"51541112","SMP_TAKEN_DT":"7/21/2020","CONC":".106","SMP_TYPE_CD_DESC":"DESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2020-07-21"},{"SOURCE_ROW_NUMBER":"1137434","CASS_NUM":"51541232","SMP_TAKEN_DT":"6/3/2020","CONC":".146","SMP_TYPE_CD_DESC":"DESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2020-06-03"},{"SOURCE_ROW_NUMBER":"1313885","CASS_NUM":"58391521","SMP_TAKEN_DT":"5/21/2020","CONC":".201","SMP_TYPE_CD_DESC":"NONDESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"INVALID OR MISSING TIME","OCC_CD_DESC":"BACKHOE OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2020-05-21"},{"SOURCE_ROW_NUMBER":"811499","CASS_NUM":"58391139","SMP_TAKEN_DT":"5/21/2020","CONC":".147","SMP_TYPE_CD_DESC":"DESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2020-05-21"},{"SOURCE_ROW_NUMBER":"917205","CASS_NUM":"51459683","SMP_TAKEN_DT":"2/26/2020","CONC":".024","SMP_TYPE_CD_DESC":"DESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2020-02-26"},{"SOURCE_ROW_NUMBER":"1188476","CASS_NUM":"58374256","SMP_TAKEN_DT":"2/5/2020","CONC":".027","SMP_TYPE_CD_DESC":"NONDESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BACKHOE OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2020-02-05"},{"SOURCE_ROW_NUMBER":"1076218","CASS_NUM":"58374095","SMP_TAKEN_DT":"2/5/2020","CONC":".018","SMP_TYPE_CD_DESC":"DESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2020-02-05"},{"SOURCE_ROW_NUMBER":"291898","CASS_NUM":"58374216","SMP_TAKEN_DT":"2/5/2020","CONC":".063","SMP_TYPE_CD_DESC":"NONDESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"REFUSE TRUCK DRIVER/BACKFILL TRUCK DRIVE","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2020-02-05"},{"SOURCE_ROW_NUMBER":"1025031","CASS_NUM":"51459931","SMP_TAKEN_DT":"11/25/2019","CONC":".01","SMP_TYPE_CD_DESC":"DESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2019-11-25"},{"SOURCE_ROW_NUMBER":"1212077","CASS_NUM":"51460799","SMP_TAKEN_DT":"8/20/2019","CONC":".009","SMP_TYPE_CD_DESC":"DESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2019-08-20"},{"SOURCE_ROW_NUMBER":"175608","CASS_NUM":"51460782","SMP_TAKEN_DT":"6/19/2019","CONC":".018","SMP_TYPE_CD_DESC":"DESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2019-06-19"},{"SOURCE_ROW_NUMBER":"418089","CASS_NUM":"51459651","SMP_TAKEN_DT":"3/12/2019","CONC":".019","SMP_TYPE_CD_DESC":"DESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"BULLDOZER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2019-03-12"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":6,"firstDate":"2013-03-11","lastDate":"2013-08-16","metrics":{"linkedIssuances":6},"periods":{},"recentRecords":[]},{"id":"msha-contested-violations","name":"Contested Violations","domains":["compliance","legal"],"products":["contest status","time to resolution","contested-rate context"],"rowCount":8,"firstDate":"2012-03-19","lastDate":"2014-12-16","metrics":{"decisions":8,"ssChanged":5,"recentRows":0,"decisionPenalty":830,"proposedPenalty":1260},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"93059","CITATION_NO":"7029093","CITATION_ISSUE_DT":"12/16/2014","DOCKET_NO":"PENN 2015-0278","DECISION_DT":"06/07/2016","CFR_STANDARD_CODE":"75.1725(a)","ORIGINAL_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"285.00","DECISION_PENALTY_AMT":".00","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"88136","CITATION_NO":"8010676","CITATION_ISSUE_DT":"09/12/2013","DOCKET_NO":"PENN 2014-72","DECISION_DT":"05/15/2014","CFR_STANDARD_CODE":"75.1100-3","ORIGINAL_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":".00","sourceDate":"2013-09-12"},{"SOURCE_ROW_NUMBER":"367681","CITATION_NO":"7051585","CITATION_ISSUE_DT":"02/06/2013","DOCKET_NO":"PENN 2013-333","DECISION_DT":"02/27/2014","CFR_STANDARD_CODE":"75.1714-3(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"224.00","DECISION_PENALTY_AMT":"179.00","sourceDate":"2013-02-06"},{"SOURCE_ROW_NUMBER":"371406","CITATION_NO":"7050768","CITATION_ISSUE_DT":"02/05/2013","DOCKET_NO":"PENN 2013-211","DECISION_DT":"12/24/2013","CFR_STANDARD_CODE":"75.360(g)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2013-02-05"},{"SOURCE_ROW_NUMBER":"258130","CITATION_NO":"7057982","CITATION_ISSUE_DT":"11/06/2012","DOCKET_NO":"PENN 2013-252","DECISION_DT":"03/18/2014","CFR_STANDARD_CODE":"75.360(a)(1)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2012-11-06"},{"SOURCE_ROW_NUMBER":"308493","CITATION_NO":"7057794","CITATION_ISSUE_DT":"03/19/2012","DOCKET_NO":"PENN 2012-315","DECISION_DT":"04/22/2013","CFR_STANDARD_CODE":"77.502","ORIGINAL_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"243.00","DECISION_PENALTY_AMT":"243.00","sourceDate":"2012-03-19"},{"SOURCE_ROW_NUMBER":"251837","CITATION_NO":"7057795","CITATION_ISSUE_DT":"03/19/2012","DOCKET_NO":"PENN 2012-315","DECISION_DT":"04/22/2013","CFR_STANDARD_CODE":"77.1110","ORIGINAL_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"108.00","DECISION_PENALTY_AMT":"108.00","sourceDate":"2012-03-19"},{"SOURCE_ROW_NUMBER":"195282","CITATION_NO":"7057793","CITATION_ISSUE_DT":"03/19/2012","DOCKET_NO":"PENN 2012-315","DECISION_DT":"04/22/2013","CFR_STANDARD_CODE":"77.410(c)","ORIGINAL_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2012-03-19"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":535,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":121,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":6,"firstDate":"1995-03-01","lastDate":"2001-05-21","metrics":{"recentRows":0,"currentOperatorTenures":2,"completedOperatorTenures":4},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":98,"firstDate":"2000-02-22","lastDate":"2020-11-24","metrics":{"inspectors":139,"recentRows":0,"onSiteHours":1686.25,"inspectionHours":3066,"inspectionSamples":216},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1138763","EVENT_NO":"6237248","INSPECTION_BEGIN_DT":"11/24/2020","INSPECTION_END_DT":"11/24/2020","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"6.5","SUM_TOTAL_ON_SITE_HOURS":"3.5","sourceDate":"2020-11-24"},{"SOURCE_ROW_NUMBER":"644243","EVENT_NO":"6237062","INSPECTION_BEGIN_DT":"09/29/2020","INSPECTION_END_DT":"09/29/2020","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"4.5","SUM_TOTAL_ON_SITE_HOURS":"2","sourceDate":"2020-09-29"},{"SOURCE_ROW_NUMBER":"193683","EVENT_NO":"6237053","INSPECTION_BEGIN_DT":"05/21/2020","INSPECTION_END_DT":"06/25/2020","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"14.5","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2020-05-21"},{"SOURCE_ROW_NUMBER":"1012335","EVENT_NO":"6237037","INSPECTION_BEGIN_DT":"02/03/2020","INSPECTION_END_DT":"02/13/2020","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"17.25","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2020-02-03"},{"SOURCE_ROW_NUMBER":"422852","EVENT_NO":"6218296","INSPECTION_BEGIN_DT":"06/14/2019","INSPECTION_END_DT":"06/27/2019","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"19.5","SUM_TOTAL_ON_SITE_HOURS":"8","sourceDate":"2019-06-14"},{"SOURCE_ROW_NUMBER":"794377","EVENT_NO":"6236612","INSPECTION_BEGIN_DT":"10/16/2018","INSPECTION_END_DT":"11/01/2018","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"18.5","SUM_TOTAL_ON_SITE_HOURS":"9.75","sourceDate":"2018-10-16"},{"SOURCE_ROW_NUMBER":"522322","EVENT_NO":"6225812","INSPECTION_BEGIN_DT":"05/15/2018","INSPECTION_END_DT":"05/31/2018","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"19.5","SUM_TOTAL_ON_SITE_HOURS":"10.25","sourceDate":"2018-05-15"},{"SOURCE_ROW_NUMBER":"770791","EVENT_NO":"6236573","INSPECTION_BEGIN_DT":"11/16/2017","INSPECTION_END_DT":"01/08/2018","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"19.5","SUM_TOTAL_ON_SITE_HOURS":"9.5","sourceDate":"2017-11-16"},{"SOURCE_ROW_NUMBER":"51876","EVENT_NO":"6236317","INSPECTION_BEGIN_DT":"05/24/2017","INSPECTION_END_DT":"06/23/2017","ACTIVITY_CODE":"E17","ACTIVITY":"Special Emphasis Programs","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"2.75","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2017-05-24"},{"SOURCE_ROW_NUMBER":"620261","EVENT_NO":"4035948","INSPECTION_BEGIN_DT":"05/23/2017","INSPECTION_END_DT":"05/25/2017","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"15","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2017-05-23"},{"SOURCE_ROW_NUMBER":"971795","EVENT_NO":"6236205","INSPECTION_BEGIN_DT":"03/02/2017","INSPECTION_END_DT":"03/09/2017","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"17","SUM_TOTAL_ON_SITE_HOURS":"10.5","sourceDate":"2017-03-02"},{"SOURCE_ROW_NUMBER":"913616","EVENT_NO":"6236034","INSPECTION_BEGIN_DT":"11/29/2016","INSPECTION_END_DT":"01/10/2017","ACTIVITY_CODE":"E17","ACTIVITY":"Special Emphasis Programs","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5.5","SUM_TOTAL_ON_SITE_HOURS":"2","sourceDate":"2016-11-29"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":129,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2020-Q4":{"hours":0,"employees":0,"production":0},"2020-Q3":{"hours":594,"employees":2,"production":0},"2020-Q2":{"hours":1476,"employees":4,"production":0},"2020-Q1":{"hours":2003,"employees":4,"production":0},"2019-Q4":{"hours":1466,"employees":2,"production":0},"2019-Q3":{"hours":490,"employees":1,"production":0},"2019-Q2":{"hours":679,"employees":1,"production":0},"2019-Q1":{"hours":731,"employees":1,"production":0},"2018-Q4":{"hours":700,"employees":1,"production":0},"2018-Q3":{"hours":670,"employees":1,"production":0},"2018-Q2":{"hours":635,"employees":1,"production":0},"2018-Q1":{"hours":726,"employees":1,"production":0}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":24,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2006":{"hours":1000,"employees":3,"production":0},"2012":{"hours":14754,"employees":18,"production":0},"2013":{"hours":90167,"employees":49,"production":59689},"2014":{"hours":110301,"employees":52,"production":33792},"2015":{"hours":7083,"employees":15,"production":0},"2016":{"hours":676,"employees":2,"production":0},"2017":{"hours":2225,"employees":1,"production":0},"2018":{"hours":2731,"employees":1,"production":0},"2019":{"hours":3366,"employees":1,"production":0},"2020":{"hours":4073,"employees":3,"production":0}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":42,"firstDate":"2000-03-27","lastDate":"2020-02-05","metrics":{"recentRows":0,"doseOver100":5,"actDoseTotal":2381,"pelDoseTotal":1497},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"158904","EVENT_NO":"6237037","SURVEY_DATE":"02/05/2020","OCCUPATION_CD_DESC":"REFUSE TRUCK DRIVER/BACKFILL TRUCK DRIVE","MACHINE_CD":"39","MANUFACTURER_CD":"018","ACT_DOSE_85":"11","PEL_DOSE_90":"2","SURVEY_TYPE":"I","sourceDate":"2020-02-05"},{"SOURCE_ROW_NUMBER":"158903","EVENT_NO":"6237037","SURVEY_DATE":"02/05/2020","OCCUPATION_CD_DESC":"BACKHOE OPERATOR","MACHINE_CD":"40","MANUFACTURER_CD":"063","ACT_DOSE_85":"4","PEL_DOSE_90":"1","SURVEY_TYPE":"I","sourceDate":"2020-02-05"},{"SOURCE_ROW_NUMBER":"158902","EVENT_NO":"6237037","SURVEY_DATE":"02/05/2020","OCCUPATION_CD_DESC":"BULLDOZER OPERATOR","MACHINE_CD":"03","MANUFACTURER_CD":"018","ACT_DOSE_85":"27","PEL_DOSE_90":"3","SURVEY_TYPE":"I","sourceDate":"2020-02-05"},{"SOURCE_ROW_NUMBER":"158901","EVENT_NO":"6236612","SURVEY_DATE":"10/24/2018","OCCUPATION_CD_DESC":"BULLDOZER OPERATOR","MACHINE_CD":"03","MANUFACTURER_CD":"018","ACT_DOSE_85":"64","PEL_DOSE_90":"23","SURVEY_TYPE":"I","sourceDate":"2018-10-24"},{"SOURCE_ROW_NUMBER":"158900","EVENT_NO":"6236205","SURVEY_DATE":"03/08/2017","OCCUPATION_CD_DESC":"BULLDOZER OPERATOR","MACHINE_CD":"03","MANUFACTURER_CD":"018","ACT_DOSE_85":"44","PEL_DOSE_90":"11","SURVEY_TYPE":"I","sourceDate":"2017-03-08"},{"SOURCE_ROW_NUMBER":"158875","EVENT_NO":"4032606","SURVEY_DATE":"11/24/2014","OCCUPATION_CD_DESC":"HIGHLIFT OPERATOR/FRONT END LOADER","MACHINE_CD":"18","MANUFACTURER_CD":"018","ACT_DOSE_85":"15","PEL_DOSE_90":"8","SURVEY_TYPE":"I","sourceDate":"2014-11-24"},{"SOURCE_ROW_NUMBER":"158884","EVENT_NO":"4032606","SURVEY_DATE":"11/18/2014","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"57","PEL_DOSE_90":"42","SURVEY_TYPE":"F","sourceDate":"2014-11-18"},{"SOURCE_ROW_NUMBER":"158882","EVENT_NO":"4032606","SURVEY_DATE":"11/18/2014","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"59","PEL_DOSE_90":"43","SURVEY_TYPE":"F","sourceDate":"2014-11-18"},{"SOURCE_ROW_NUMBER":"158880","EVENT_NO":"4032606","SURVEY_DATE":"11/18/2014","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"62","PEL_DOSE_90":"54","SURVEY_TYPE":"F","sourceDate":"2014-11-18"},{"SOURCE_ROW_NUMBER":"158874","EVENT_NO":"4032606","SURVEY_DATE":"11/18/2014","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"106","PEL_DOSE_90":"95","SURVEY_TYPE":"F","sourceDate":"2014-11-18"},{"SOURCE_ROW_NUMBER":"158873","EVENT_NO":"4032606","SURVEY_DATE":"11/18/2014","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"16","PEL_DOSE_90":"7","SURVEY_TYPE":"F","sourceDate":"2014-11-18"},{"SOURCE_ROW_NUMBER":"158872","EVENT_NO":"4032606","SURVEY_DATE":"11/18/2014","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"44","PEL_DOSE_90":"28","SURVEY_TYPE":"F","sourceDate":"2014-11-18"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":26,"firstDate":"2000-05-02","lastDate":"2020-05-21","metrics":{"recentRows":0,"voidSamples":2,"maxQuartzPct":18.7,"validSamples":24,"quartzPctTotal":174.9},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"100764","CASSETTE_NO":"58391139","SAMPLE_DT":"05/21/2020","QUARTZ_PCT":"12.9","QUARTZ_MICROGRAMS":"19","OCC_CODE_DESC":"BULLDOZER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED WORK POSITION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2020-05-21"},{"SOURCE_ROW_NUMBER":"109411","CASSETTE_NO":"58145091","SAMPLE_DT":"11/19/2014","QUARTZ_PCT":"04.3","QUARTZ_MICROGRAMS":"11","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-11-19"},{"SOURCE_ROW_NUMBER":"18472","CASSETTE_NO":"58145092","SAMPLE_DT":"11/19/2014","QUARTZ_PCT":"05.7","QUARTZ_MICROGRAMS":"9","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-11-19"},{"SOURCE_ROW_NUMBER":"159518","CASSETTE_NO":"58144751","SAMPLE_DT":"11/05/2014","QUARTZ_PCT":"04.9","QUARTZ_MICROGRAMS":"6","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-11-05"},{"SOURCE_ROW_NUMBER":"12922","CASSETTE_NO":"58144754","SAMPLE_DT":"11/05/2014","QUARTZ_PCT":"04.0","QUARTZ_MICROGRAMS":"10","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-11-05"},{"SOURCE_ROW_NUMBER":"869","CASSETTE_NO":"51187960","SAMPLE_DT":"03/11/2014","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"INSUFFICIENT WEIGHT GAIN","sourceDate":"2014-03-11"},{"SOURCE_ROW_NUMBER":"64330","CASSETTE_NO":"51238843","SAMPLE_DT":"02/26/2014","QUARTZ_PCT":"11.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-02-26"},{"SOURCE_ROW_NUMBER":"67988","CASSETTE_NO":"51221040","SAMPLE_DT":"01/22/2014","QUARTZ_PCT":"11.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"UNACCEPTABLE TIMEFRAME","sourceDate":"2014-01-22"},{"SOURCE_ROW_NUMBER":"147991","CASSETTE_NO":"58140896","SAMPLE_DT":"01/13/2014","QUARTZ_PCT":"18.7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-01-13"},{"SOURCE_ROW_NUMBER":"57638","CASSETTE_NO":"58140891","SAMPLE_DT":"01/13/2014","QUARTZ_PCT":"10.3","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-01-13"},{"SOURCE_ROW_NUMBER":"141160","CASSETTE_NO":"58118743","SAMPLE_DT":"12/17/2013","QUARTZ_PCT":"06.6","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2013-12-17"},{"SOURCE_ROW_NUMBER":"118803","CASSETTE_NO":"58110197","SAMPLE_DT":"04/29/2013","QUARTZ_PCT":"08.1","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2013-04-29"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":125,"firstDate":"2000-03-09","lastDate":"2020-05-21","metrics":{"ss":18,"amountDue":17949,"contested":4,"amountPaid":17828,"recentRows":0,"section104d":0,"unterminated":1,"proposedPenalty":18016},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1941357","VIOLATION_NO":"9202095","VIOLATION_ISSUE_DT":"05/21/2020","SIG_SUB":"Y","PART_SECTION":"77.1607(k)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Highly","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"05/21/2020","PROPOSED_PENALTY":"306","AMOUNT_DUE":"306","AMOUNT_PAID":"306","CONTESTED_IND":"N","sourceDate":"2020-05-21"},{"SOURCE_ROW_NUMBER":"1941356","VIOLATION_NO":"9202094","VIOLATION_ISSUE_DT":"05/21/2020","CIT_ORD_SAFE":"Order","NO_AFFECTED":"0","TERMINATION_DT":"05/21/2020","CONTESTED_IND":"N","sourceDate":"2020-05-21"},{"SOURCE_ROW_NUMBER":"1941414","VIOLATION_NO":"9071601","VIOLATION_ISSUE_DT":"01/03/2018","SIG_SUB":"N","PART_SECTION":"77.502","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"0","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/03/2018","PROPOSED_PENALTY":"118","AMOUNT_DUE":"118","AMOUNT_PAID":"118","CONTESTED_IND":"N","sourceDate":"2018-01-03"},{"SOURCE_ROW_NUMBER":"1941413","VIOLATION_NO":"9071600","VIOLATION_ISSUE_DT":"01/03/2018","SIG_SUB":"N","PART_SECTION":"77.1713(c)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"0","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/03/2018","PROPOSED_PENALTY":"118","AMOUNT_DUE":"118","AMOUNT_PAID":"118","CONTESTED_IND":"N","sourceDate":"2018-01-03"},{"SOURCE_ROW_NUMBER":"1941324","VIOLATION_NO":"7032602","VIOLATION_ISSUE_DT":"02/12/2015","SIG_SUB":"N","PART_SECTION":"75.310(c)(5)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"7","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"02/13/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-02-12"},{"SOURCE_ROW_NUMBER":"1941323","VIOLATION_NO":"7029100","VIOLATION_ISSUE_DT":"01/14/2015","SIG_SUB":"N","PART_SECTION":"75.807","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Fatal","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"01/14/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-01-14"},{"SOURCE_ROW_NUMBER":"1941425","VIOLATION_NO":"7029405","VIOLATION_ISSUE_DT":"12/19/2014","CIT_ORD_SAFE":"Order","NO_AFFECTED":"0","TERMINATION_DT":"01/14/2015","CONTESTED_IND":"N","sourceDate":"2014-12-19"},{"SOURCE_ROW_NUMBER":"1941401","VIOLATION_NO":"7029096","VIOLATION_ISSUE_DT":"12/17/2014","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"12/17/2014","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2014-12-17"},{"SOURCE_ROW_NUMBER":"1941400","VIOLATION_NO":"7029095","VIOLATION_ISSUE_DT":"12/16/2014","SIG_SUB":"N","PART_SECTION":"75.360(b)(11)(iii)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"9","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"12/17/2014","PROPOSED_PENALTY":"634","AMOUNT_DUE":"634","AMOUNT_PAID":"634","CONTESTED_IND":"N","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"1941399","VIOLATION_NO":"7029094","VIOLATION_ISSUE_DT":"12/16/2014","SIG_SUB":"N","PART_SECTION":"75.333(h)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Permanent","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"12/17/2014","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"1941398","VIOLATION_NO":"7029092","VIOLATION_ISSUE_DT":"12/16/2014","SIG_SUB":"N","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"12/16/2014","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"1941397","VIOLATION_NO":"7029091","VIOLATION_ISSUE_DT":"12/16/2014","SIG_SUB":"N","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"9","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"12/17/2014","PROPOSED_PENALTY":"634","AMOUNT_DUE":"634","AMOUNT_PAID":"634","CONTESTED_IND":"N","sourceDate":"2014-12-16"}]}],"safety":{"href":"/api/v1/mines/3608508/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/3608508/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.1607","heading":"Loading and haulage equipment; operation.","id":"77.1607","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-Q/section-77.1607","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"Q","subpartHeading":"Subpart Q—Loading and Haulage","text":"(a) Vehicles shall follow at a safe distance; passing shall be limited to areas of adequate clearance and visibility.\n\n(b) Mobile equipment operators shall have full control of the equipment while it is in motion.\n\n(c) Equipment operating speeds shall be prudent and consistent with conditions of roadway, grades, clearance, visibility, traffic, and the type of equipment used.\n\n(d) Cabs of mobile equipment shall be kept free of extraneous materials.\n\n(e) Operators shall sit facing the direction of travel while operating equipment with dual controls.\n\n(f) When an equipment operator is present, men shall notify him before getting on or off equipment.\n\n(g) Equipment operators shall be certain, by signal or other means, that all persons are clear before starting or moving equipment.\n\n(h) Where possible, aerial tramways shall not be started until the tramway operator has ascertained that everyone is in the clear.\n\n(i) Dust control measures shall be taken where dust significantly reduces visibility of equipment operators.\n\n(j) Dippers, buckets, loading booms, or heavy suspended loads shall not be swung over the cabs of haulage vehicles until the drivers are out of the cabs and in safe locations, unless the trucks are designed specifically to protect the drivers from falling material.\n\n(k) Men shall not work or pass under the buckets or booms of loaders in operation.\n\n(l) Tires shall be deflated before repairs on them are started and adequate means shall be provided to prevent wheel locking rims from creating a hazard during tire inflation.\n\n(m) Electrically powered mobile equipment shall not be left unattended unless the master switch is in the off position, all operating controls are in the neutral position, and the brakes are set or other equivalent precautions are taken against rolling.\n\n(n) Mobile equipment shall not be left unattended unless the brakes are set. The wheels shall be turned into a bank or berm, or shall be blocked, when such equipment is parked on a grade.\n\n(o) Lights, flares, or other warning devices shall be posted when parked equipment creates a hazard to vehicular traffic.\n\n(p) Dippers, buckets, scraper blades, and similar movable parts shall be secured or lowered to the ground when not in use.\n\n(q) Shovel trailing cables shall not be moved with the shovel dipper unless cable slings or sleds are used.\n\n(r) Equipment which is to be hauled shall be loaded and protected so as to prevent sliding or spillage.\n\n(s) When moving between work areas, the equipment shall be secured in the travel position.\n\n(t) Any load extending more than 4 feet beyond the rear of the vehicle body should be marked clearly with a red flag by day and a red light at night.\n\n(u) Tow bars shall be used to tow heavy equipment and a safety chain shall be used in conjunction with each tow bar.\n\n(v) Railroad cars shall be kept under control at all times by the car dropper. Cars shall be dropped at a safe rate and in a manner that will insure that the car dropper maintains a safe position while working and traveling around the cars.\n\n(w) Railroad cars shall not be coupled or uncoupled manually from the inside of curves unless the railroad and cars are so designed to eliminate any hazard from coupling or uncoupling cars from inside of curves.\n\n(x) Persons shall wear safety belts when dropping railroad cars.\n\n(y) Railcars shall not be left on sidetracks unless ample clearance is provided for traffic on adjacent tracks.\n\n(z) Parked railcars, unless held effectively by brakes, shall be blocked securely.\n\n(aa) Railroad cars and all trucks shall be trimmed properly when they have been loaded higher than the confines of their cargo space.\n\n(bb) When the entire length of a conveyor is visible from the starting switch, the operator shall visually check to make certain that all persons are in the clear before starting the conveyor. When the entire length of the conveyor is not visible from the starting switch, a positive audible or visible warning system shall be installed and operated to warn persons that the conveyor will be started.\n\n(cc) Unguarded conveyors with walkways shall be equipped with emergency stop devices or cords along their full length.\n\n(dd) Adequate backstops or brakes shall be installed on inclined-conveyor drive units to prevent conveyors from running in reverse if a hazard to personnel would be caused.\n\n(ee) Aerial tram conveyor buckets shall not be overloaded, and feed shall be regulated to prevent spillage.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.502","heading":"Electric equipment; examination, testing, and maintenance.","id":"77.502","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-F/section-77.502","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"Electric equipment shall be frequently examined, tested, and properly maintained by a qualified person to assure safe operating conditions. When a potentially dangerous condition is found on electric equipment, such equipment shall be removed from service until such condition is corrected. A record of such examinations shall be kept.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.1713","heading":"Daily inspection of surface coal mine; certified person; reports of inspection.","id":"77.1713","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-R/section-77.1713","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) At least once during each working shift, or more often if necessary for safety, each active working area and each active surface installation shall be examined by a certified person designated by the operator to conduct such examinations for hazardous conditions and any hazardous conditions noted during such examinations shall be reported to the operator and shall be corrected by the operator.\n\n(b) If any hazardous condition noted during an examination conducted in accordance with paragraph (a) of this section creates an imminent danger, the person conducting such examination shall notify the operator and the operator shall withdraw all persons from the area affected, except those persons referred to in section 104(d) of the Act, until the danger is abated.\n\n(c) After each examination conducted in accordance with the provisions of paragraph (a) of this section, each certified person who conducted all or any part of the examination required shall enter with ink or indelible pencil in a book approved by the Secretary the date and a report of the condition of the mine or any area of the mine which he has inspected together with a report of the nature and location of any hazardous condition found to be present at the mine. The book in which such entries are made shall be kept in an area at the mine designated by the operator to minimize the danger of destruction by fire or other hazard.\n\n(d) All examination reports recorded in accordance with the provisions of paragraph (c) of this section shall include a report of the action taken to abate hazardous conditions and shall be signed or countersigned each day by at least one of the following persons:\n\n(1) The surface mine foreman;\n\n(2) The assistant superintendent of the mine;\n\n(3) The superintendent of the mine;\n\n(4) The person designated by the operator as responsible for health and safety at the mine; or,\n\n(5) An equivalent mine official.\n\n(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))\n\n[36 FR 9364, May 22, 1971, as amended at 60 FR 33723, June 29, 1995; 63 FR 58613, Oct. 30, 1998]","occurrenceCount":1},{"chapter":"I","heading":"Installation of main mine fans.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.310","part":"75","subchapter":"O","subpart":"D","id":"75.310","citation":"30 CFR 75.310","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.807","heading":"Installation of high-voltage transmission cables.","id":"75.807","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-I/section-75.807","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"I","subpartHeading":"Subpart I—Underground High-Voltage Distribution","text":"[Statutory Provisions]\n\nAll underground high-voltage transmission cables shall be installed only in regularly inspected air courses and haulageways, and shall be covered, buried, or placed so as to afford protection against damage, guarded where men regularly work or pass under them unless they are 6 1/2 feet or more above the floor or rail, securely anchored, properly insulated, and guarded at ends, and covered, insulated, or placed to prevent contact with trolley wires and other low-voltage circuits.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.360","heading":"Preshift examination at fixed intervals.","id":"75.360","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.\n\n(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.\n\n(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:\n\n(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.\n\n(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.\n\n(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.\n\n(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.\n\n(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.\n\n(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,\n\n(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.\n\n(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.\n\n(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.\n\n(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.\n\n(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.\n\n(11) Preshift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:\n\n(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.\n\n(3) At the intake end of any pillar line—\n\n(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) If a split system is used, in the intake entries of each split immediately inby the split point.\n\n(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.\n\n(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.\n\n(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.333","heading":"Ventilation controls.","id":"75.333","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) For purposes of this section, “doors” include any door frames.\n\n(b) Permanent stoppings or other permanent ventilation control devices constructed after November 15, 1992, shall be built and maintained—\n\n(1) Between intake and return air courses, except temporary controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the room was developed including where continuous face haulage systems are used in such rooms. Unless otherwise approved in the ventilation plan, these stoppings or controls shall be maintained to and including the third connecting crosscut outby the working face;\n\n(2) To separate belt conveyor haulageways from return air courses, except where belt entries in areas of mines developed before March 30, 1970, are used as return air courses;\n\n(3) To separate belt conveyor haulageways from intake air courses when the air in the intake air courses is used to provide air to active working places. Temporary ventilation controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the rooms were developed including where continuous face haulage systems are used in such rooms. When continuous face haulage systems are used, permanent stoppings or other permanent ventilation control devices shall be built and maintained to the outby most point of travel of the dolly or 600 feet from the point of deepest penetration in the conveyor belt entry, whichever distance is closer to the point of deepest penetration, to separate the continuous haulage entry from the intake entries;\n\n(4) To separate the primary escapeway from belt and trolley haulage entries, as required by § 75.380(g). For the purposes of § 75.380(g), the loading point for a continuous haulage system shall be the outby most point of travel of the dolly or 600 feet from the point of deepest penetration, whichever distance is less; and\n\n(5) In return air courses to direct air into adjacent worked-out areas.\n\n(c) Personnel doors shall be constructed of noncombustible material and shall be of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between air courses, and shall be installed as follows in permanent stoppings constructed after November 15, 1992:\n\n(1) The distance between personnel doors shall be no more than 300 feet in seam heights below 48 inches and 600 feet in seam heights 48 inches or higher.\n\n(2) The location of all personnel doors in stoppings along escapeways shall be clearly marked so that the doors may be easily identified by anyone traveling in the escapeway and in the entries on either side of the doors.\n\n(3) When not in use, personnel doors shall be closed.\n\n(4) An airlock shall be established where the air pressure differential between air courses creates a static force exceeding 125 pounds on closed personnel doors along escapeways.\n\n(d) Doors, other than personnel doors, constructed after November 15, 1992, that are used in lieu of permanent stoppings or to control ventilation within an air course shall be:\n\n(1) Made of noncombustible material or coated on all accessible surfaces with flame-retardant materials having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(2) Of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between or within air courses or entries.\n\n(3) Installed in pairs to form an airlock. When an airlock is used, one side of the airlock shall remain closed. When not in use, both sides shall be closed.\n\n(e)(1)(i) Except as provided in paragraphs (e)(2), (3), and (4) of this section, all overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after June 10, 1996, shall be constructed in a traditionally accepted method and of materials that have been demonstrated to perform adequately or in a method and of materials that have been tested and shown to have a minimum strength equal to or greater than the traditionally accepted in-mine controls. Tests may be performed under ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction” (Section 12-Transverse Load-Specimen Vertical, load, only), or the operator may conduct comparative in-mine tests. In-mine tests shall be designed to demonstrate the comparative strength of the proposed construction and a traditionally accepted in-mine control. The publication ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction,” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(ii) All overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after November 15, 1992, shall be constructed of noncombustible material. Materials that are suitable for the construction of overcasts, undercasts, shaft partitions, permanent stoppings, and regulators include concrete, concrete block, brick, cinder block, tile, or steel. No ventilation controls installed after November 15, 1992, shall be constructed of aluminum.\n\n(2) In anthracite mines, permanent stoppings may be constructed of overlapping layers of hardwood mine boards, if the stoppings are a minimum 2 inches thick.\n\n(3) When timbers are used to create permanent stoppings in heaving or caving areas, the stoppings shall be coated on all accessible surfaces with a flame-retardant material having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(4) In anthracite mines, doors and regulators may be constructed of overlapping layers of hardwood boards, if the doors, door frames, and regulators are a minimum 2 inches thick.\n\n(f) When sealants are applied to ventilation controls, the sealant shall have a flame-spread index of 25 or less under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(g) Before mining is discontinued in an entry or room that is advanced more than 20 feet from the inby rib, a crosscut shall be made or line brattice shall be installed and maintained to provide adequate ventilation. When conditions such as methane liberation warrant a distance less than 20 feet, the approved ventilation plan shall specify the location of such rooms or entries and the maximum distance they will be developed before a crosscut is made or line brattice is installed.\n\n(h) All ventilation controls, including seals, shall be maintained to serve the purpose for which they were built.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996; 61 FR 26442, May 28, 1996; 61 FR 29288, 29289, June 10, 1996, as amended at 67 FR 38386, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 73 FR 80612, Dec. 31, 2008; 80 FR 52991, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":2}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"3608508","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}