# Relationship history for MSHA mine 3601733

Current hierarchy: **Norman P Miller; Gabriel M Miller → M-K RECYCLING, LLC → Jeddo No 7 Breaker Site**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **operator_operates_mine:** Jeddo-Highland Coal Co → Jeddo No 7 Breaker Site; 1950-01-01 to 2018-08-15; source msha-controller-operator-history
- **controller_controls_mine:** Pagnotti Enterprises Inc → Jeddo No 7 Breaker Site; 1950-01-01 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Pagnotti Enterprises Inc → Jeddo-Highland Coal Co; 1950-01-01 to 2018-08-15; source msha-controller-operator-history
- **operator_operates_mine:** M-K RECYCLING, LLC → Jeddo No 7 Breaker Site; 2018-08-16 to current/open; source msha-controller-operator-history
- **controller_controls_mine:** Gabriel M Miller et al → Jeddo No 7 Breaker Site; 2018-08-16 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Gabriel M Miller et al → M-K RECYCLING, LLC; 2018-08-16 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Norman P Miller et al → M-K RECYCLING, LLC; 2018-08-16 to current/open; source msha-controller-operator-history
