# Relationship history for MSHA mine 2901886

Current hierarchy: **Doug  Foutz → Doug Foutz Construction → DOUG FOUTZ CONSTRUCTION**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-17T05:35:58.500035+00:00

## Valid-time edges

- **operator_operates_mine:** Doug Foutz Construction → DOUG FOUTZ CONSTRUCTION; 1982-09-01 to current/open; source msha-controller-operator-history
- **controller_controls_mine:** Doug  Foutz → DOUG FOUTZ CONSTRUCTION; 1982-09-01 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Doug  Foutz → Doug Foutz Construction; 1982-09-01 to current/open; source msha-controller-operator-history
