# Relationship history for MSHA mine 2900504

Current hierarchy: **Amrize South Central → Permian Basin Materials, LLC → Eunice**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **operator_operates_mine:** Wallach Concrete Inc → Eunice; 1950-01-01 to 2015-07-31; source msha-controller-operator-history
- **controller_controls_mine:** Robert R  Wallach → Eunice; 1950-01-01 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Robert R  Wallach → Wallach Concrete Inc; 1950-01-01 to 2015-07-31; source msha-controller-operator-history
- **operator_operates_mine:** Permian Basin Materials, LLC → Eunice; 2015-08-01 to current/open; source msha-controller-operator-history
- **controller_controls_mine:** W L Ross & Co LLC et al → Eunice; 2015-08-01 to 2026-02-17; source msha-controller-operator-history
- **controller_controls_operator:** W L Ross & Co LLC et al → Permian Basin Materials, LLC; 2015-08-01 to 2026-02-17; source msha-controller-operator-history
- **controller_controls_mine:** Amrize South Central → Eunice; 2026-02-18 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Amrize South Central → Permian Basin Materials, LLC; 2026-02-18 to current/open; source msha-controller-operator-history
