# Relationship history for MSHA mine 2602619

Current hierarchy: **Loren E  Hunewill → H. E. Hunewill Construction Co. Inc. → Cedarapids MVP450 Cone Crusher S/N54075**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-17T05:35:58.500035+00:00

## Valid-time edges

- **controller_controls_mine:** Loren E  Hunewill  et al → Cedarapids MVP450 Cone Crusher S/N54075; 1978-03-09 to current/open; source msha-controller-operator-history
- **operator_operates_mine:** H. E. Hunewill Construction Co. Inc. → Cedarapids MVP450 Cone Crusher S/N54075; 2007-08-10 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Loren E  Hunewill  et al → H. E. Hunewill Construction Co. Inc.; 2007-08-10 to current/open; source msha-controller-operator-history
