{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"1519974","name":"Trace Branch Splint Mine","status":"Active","status_date":"2025-08-22","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"KY","county":"Harlan","nearest_town":"Cumberland","operator_id":"0190634","operator_name":"Bluegrass Natural Resources, LLC","controller_id":"0178863","controller_name":"Javelin Global Commodities (UK) Ltd","district":"C07","office":"Harlan KY Field Office","employees":51,"latitude":36.916111,"longitude":-82.983611},"coverage":{"contributingSources":15,"registeredSources":20,"sourceRows":875},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"1519974","name":"Trace Branch Splint Mine"},"operator":{"type":"operator","id":"0190634","name":"Bluegrass Natural Resources, LLC"},"controller":{"type":"controller","id":"0178863","name":"Javelin Global Commodities (UK) Ltd"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"0178863","name":"Javelin Global Commodities (UK) Ltd"},"object":{"type":"mine","id":"1519974","name":"Trace Branch Splint Mine"},"validFrom":"2023-08-03","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519974|0178863|2023-08-03|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0190634","name":"Bluegrass Natural Resources, LLC"},"object":{"type":"mine","id":"1519974","name":"Trace Branch Splint Mine"},"validFrom":"2025-03-24","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519974|0190634|2025-03-24|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0178863","name":"Javelin Global Commodities (UK) Ltd"},"object":{"type":"operator","id":"0190634","name":"Bluegrass Natural Resources, LLC"},"validFrom":"2025-03-24","validTo":null,"current":true,"derived":true,"evidenceMineId":"1519974","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519974|0190634|2025-03-24|0178863|2023-08-03|38317"}}],"coverage":{"historyRecords":1,"edgeCount":3,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":4,"firstDate":"2025-11-07","lastDate":"2026-09-23","metrics":{"daysLost":2,"injuries":4,"fatalities":0,"recentRows":4,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"272560","DOCUMENT_NO":"220262720004","ACCIDENT_DT":"09/23/2026","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck by powered moving object","OCCUPATION":"Bull gang foreman, Labor foreman, Leadman, Section foreman, Shift boss","NO_INJURIES":"1","NARRATIVE":"EE was located in an intersection when EE was struck by a battery-powered scoop. Following the incident, EE was immediately transported to the surface. EE sustained a posterior dislocation of the left hip with a fracture of the femur ball socket.","sourceDate":"2026-09-23"},{"SOURCE_ROW_NUMBER":"121866","DOCUMENT_NO":"220262720033","ACCIDENT_DT":"09/22/2026","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"2","NARRATIVE":"The employee was removing a chain from the continuous miner trailing cable when the cable coupler (cathead) slid from the top of the power center, inadvertently striking the employee in the face. After being struck by the cable coupler, the employee received two broken teeth and chipped another. * Note: The two teeth that were broken were already implanted. (False teeth) *","sourceDate":"2026-09-22"},{"SOURCE_ROW_NUMBER":"100358","DOCUMENT_NO":"220261690005","ACCIDENT_DT":"06/10/2026","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDTOOLS (NONPOWERED)","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Electrician, Lineman","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee was making a splice in a 480V trailing cable, whenever EE's knife slipped from the jacket of the splice, resulting in a small laceration in EE's right hand.","sourceDate":"2026-06-10"},{"SOURCE_ROW_NUMBER":"152144","DOCUMENT_NO":"220253210039","ACCIDENT_DT":"11/07/2025","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall onto or against objects","OCCUPATION":"Master mechanic, Foreman, Supervisor","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee was checking a water pump and lost balance and put a hand down to catch themselves on the pump. The pump was sitting in a wire cage, and the wire cut their right pinky finger. The laceration required two stitches to close the wound.","sourceDate":"2025-11-07"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2025-08-22","lastDate":"2025-08-22","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":35,"firstDate":"2025-05-28","lastDate":"2026-08-11","metrics":{"ss":4,"delinquent":27,"recentRows":35,"paidPenalty":3189,"proposedPenalty":6613,"currentAssessment":6613},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2986408","VIOLATION_NO":"5085253","ISSUE_DT":"08/11/2026","CFR_STANDARD_CD":"75.220(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Printed","sourceDate":"2026-08-11"},{"SOURCE_ROW_NUMBER":"2986407","VIOLATION_NO":"5085252","ISSUE_DT":"08/11/2026","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Printed","sourceDate":"2026-08-11"},{"SOURCE_ROW_NUMBER":"2986406","VIOLATION_NO":"5085251","ISSUE_DT":"08/06/2026","CFR_STANDARD_CD":"77.1606(c)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Printed","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"2986405","VIOLATION_NO":"5085250","ISSUE_DT":"08/05/2026","CFR_STANDARD_CD":"75.503","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Printed","sourceDate":"2026-08-05"},{"SOURCE_ROW_NUMBER":"2986404","VIOLATION_NO":"5085249","ISSUE_DT":"08/05/2026","CFR_STANDARD_CD":"75.208","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Printed","sourceDate":"2026-08-05"},{"SOURCE_ROW_NUMBER":"2986409","VIOLATION_NO":"9774348","ISSUE_DT":"07/30/2026","CFR_STANDARD_CD":"75.220(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Printed","sourceDate":"2026-07-30"},{"SOURCE_ROW_NUMBER":"2986403","VIOLATION_NO":"5085247","ISSUE_DT":"07/22/2026","CFR_STANDARD_CD":"75.342(a)(4)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Printed","sourceDate":"2026-07-22"},{"SOURCE_ROW_NUMBER":"2986402","VIOLATION_NO":"5085246","ISSUE_DT":"07/16/2026","CFR_STANDARD_CD":"75.523-3(c)(2)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Printed","sourceDate":"2026-07-16"},{"SOURCE_ROW_NUMBER":"2986388","VIOLATION_NO":"5085240","ISSUE_DT":"06/05/2026","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Received","sourceDate":"2026-06-05"},{"SOURCE_ROW_NUMBER":"2986389","VIOLATION_NO":"5085849","ISSUE_DT":"05/27/2026","CFR_STANDARD_CD":"75.320(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"151.00","CURRENT_ASSESSMENT_AMT":"151.00","ASSESS_CASE_STATUS_CD":"Received","sourceDate":"2026-05-27"},{"SOURCE_ROW_NUMBER":"2986387","VIOLATION_NO":"5085239","ISSUE_DT":"05/27/2026","CFR_STANDARD_CD":"75.360(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"398.00","CURRENT_ASSESSMENT_AMT":"398.00","ASSESS_CASE_STATUS_CD":"Received","sourceDate":"2026-05-27"},{"SOURCE_ROW_NUMBER":"2986386","VIOLATION_NO":"5085235","ISSUE_DT":"05/12/2026","CFR_STANDARD_CD":"77.1606(c)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"165.00","CURRENT_ASSESSMENT_AMT":"165.00","ASSESS_CASE_STATUS_CD":"Received","sourceDate":"2026-05-12"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":601,"firstDate":"2025-09-10","lastDate":"2026-09-29","metrics":{"recentRows":601,"cpdmSamples":535,"voidSamples":205,"validSamples":396,"maxConcentration":1.904,"concentrationTotal":290.939},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"3029439","SMP_TAKEN_DT":"9/29/2026","CONC":".424","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CPDM","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"1580955","CASS_NUM":"58544145","SMP_TAKEN_DT":"9/29/2026","CONC":".804","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"1562260","CASS_NUM":"58544159","SMP_TAKEN_DT":"9/29/2026","CONC":".235","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"MMU NOT IN PRODUCING STATUS","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"1061786","CASS_NUM":"58544174","SMP_TAKEN_DT":"9/29/2026","CONC":".208","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"1007741","CASS_NUM":"58544301","SMP_TAKEN_DT":"9/29/2026","CONC":".075","SMP_TYPE_CD_DESC":"INTAKE AIR","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"210384","CASS_NUM":"58544308","SMP_TAKEN_DT":"9/29/2026","CONC":".251","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"MMU NOT IN PRODUCING STATUS","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"191026","CASS_NUM":"58544161","SMP_TAKEN_DT":"9/29/2026","CONC":".167","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"MALFUNCTIONING PUMP","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"2091563","SMP_TAKEN_DT":"9/28/2026","CONC":".407","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CPDM","sourceDate":"2026-09-28"},{"SOURCE_ROW_NUMBER":"1836314","SMP_TAKEN_DT":"9/28/2026","CONC":".713","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CPDM","sourceDate":"2026-09-28"},{"SOURCE_ROW_NUMBER":"3028984","SMP_TAKEN_DT":"9/25/2026","CONC":".048","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CPDM","sourceDate":"2026-09-25"},{"SOURCE_ROW_NUMBER":"2773703","SMP_TAKEN_DT":"9/25/2026","CONC":".48","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CPDM","sourceDate":"2026-09-25"},{"SOURCE_ROW_NUMBER":"2773086","SMP_TAKEN_DT":"9/25/2026","CONC":".116","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CPDM","sourceDate":"2026-09-25"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":1,"firstDate":"2026-05-14","lastDate":"2026-05-14","metrics":{"linkedIssuances":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":45,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":2,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":20,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":2,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":1,"firstDate":"2025-03-24","lastDate":"2025-03-24","metrics":{"recentRows":1,"currentOperatorTenures":1,"completedOperatorTenures":0},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":17,"firstDate":"2025-04-29","lastDate":"2026-10-01","metrics":{"inspectors":70,"recentRows":17,"onSiteHours":886.75,"inspectionHours":1472,"inspectionSamples":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1074719","EVENT_NO":"F01F07A","INSPECTION_BEGIN_DT":"10/01/2026","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"14.5","SUM_TOTAL_ON_SITE_HOURS":"8","sourceDate":"2026-10-01"},{"SOURCE_ROW_NUMBER":"148002","EVENT_NO":"F01F079","INSPECTION_BEGIN_DT":"09/23/2026","INSPECTION_END_DT":"10/01/2026","ACTIVITY_CODE":"E07","ACTIVITY":"Non-Fatal Accident Investigation","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"47","SUM_TOTAL_ON_SITE_HOURS":"22.25","sourceDate":"2026-09-23"},{"SOURCE_ROW_NUMBER":"338977","EVENT_NO":"F01F078","INSPECTION_BEGIN_DT":"09/16/2026","INSPECTION_END_DT":"09/30/2026","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"17.5","SUM_TOTAL_ON_SITE_HOURS":"10.75","sourceDate":"2026-09-16"},{"SOURCE_ROW_NUMBER":"109145","EVENT_NO":"F011D64","INSPECTION_BEGIN_DT":"09/10/2026","INSPECTION_END_DT":"09/10/2026","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"15","SUM_TOTAL_ON_SITE_HOURS":"7.75","sourceDate":"2026-09-10"},{"SOURCE_ROW_NUMBER":"202988","EVENT_NO":"F0195FC","INSPECTION_BEGIN_DT":"07/07/2026","INSPECTION_END_DT":"08/17/2026","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"10","SUM_TOTAL_INSP_HOURS":"238.5","SUM_TOTAL_ON_SITE_HOURS":"151.5","sourceDate":"2026-07-07"},{"SOURCE_ROW_NUMBER":"1048238","EVENT_NO":"F0195F7","INSPECTION_BEGIN_DT":"06/22/2026","INSPECTION_END_DT":"07/01/2026","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"20.5","SUM_TOTAL_ON_SITE_HOURS":"14","sourceDate":"2026-06-22"},{"SOURCE_ROW_NUMBER":"1001568","EVENT_NO":"F0195F4","INSPECTION_BEGIN_DT":"04/23/2026","INSPECTION_END_DT":"06/10/2026","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"8","SUM_TOTAL_INSP_HOURS":"297.75","SUM_TOTAL_ON_SITE_HOURS":"188","sourceDate":"2026-04-23"},{"SOURCE_ROW_NUMBER":"517281","EVENT_NO":"F006B02","INSPECTION_BEGIN_DT":"02/27/2026","INSPECTION_END_DT":"03/12/2026","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"20","SUM_TOTAL_ON_SITE_HOURS":"9","sourceDate":"2026-02-27"},{"SOURCE_ROW_NUMBER":"686690","EVENT_NO":"F021118","INSPECTION_BEGIN_DT":"01/14/2026","INSPECTION_END_DT":"01/27/2026","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"5","SUM_TOTAL_INSP_HOURS":"59.5","SUM_TOTAL_ON_SITE_HOURS":"33","sourceDate":"2026-01-14"},{"SOURCE_ROW_NUMBER":"1127051","EVENT_NO":"F003CEA","INSPECTION_BEGIN_DT":"01/13/2026","INSPECTION_END_DT":"03/19/2026","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"9","SUM_TOTAL_INSP_HOURS":"327","SUM_TOTAL_ON_SITE_HOURS":"205.25","sourceDate":"2026-01-13"},{"SOURCE_ROW_NUMBER":"1023405","EVENT_NO":"7046746","INSPECTION_BEGIN_DT":"11/03/2025","INSPECTION_END_DT":"11/25/2025","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"5","SUM_TOTAL_INSP_HOURS":"152","SUM_TOTAL_ON_SITE_HOURS":"92","sourceDate":"2025-11-03"},{"SOURCE_ROW_NUMBER":"521689","EVENT_NO":"F000E0D","INSPECTION_BEGIN_DT":"10/22/2025","INSPECTION_END_DT":"10/23/2025","ACTIVITY_CODE":"E04","ACTIVITY":"Verbal Hazard Complaint Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10","SUM_TOTAL_ON_SITE_HOURS":"6","sourceDate":"2025-10-22"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":18,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2026-Q2":{"hours":38894,"employees":56,"production":51714},"2026-Q1":{"hours":33795,"employees":54,"production":49261},"2025-Q4":{"hours":28070,"employees":51,"production":49564},"2025-Q3":{"hours":7197,"employees":13,"production":10571},"2025-Q2":{"hours":5852,"employees":8,"production":0},"2025-Q1":{"hours":480,"employees":8,"production":0}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":5,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2025":{"hours":41599,"employees":34,"production":60135},"2026":{"hours":72689,"employees":55,"production":100975}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":49,"firstDate":"2025-09-17","lastDate":"2026-09-29","metrics":{"recentRows":49,"doseOver100":11,"actDoseTotal":3137,"pelDoseTotal":1940},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"117403","EVENT_NO":"F01F078","SURVEY_DATE":"09/29/2026","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","ACT_DOSE_85":"32","PEL_DOSE_90":"13","SURVEY_TYPE":"I","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"117402","EVENT_NO":"F01F078","SURVEY_DATE":"09/29/2026","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","ACT_DOSE_85":"81","PEL_DOSE_90":"47","SURVEY_TYPE":"I","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"117401","EVENT_NO":"F01F078","SURVEY_DATE":"09/29/2026","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","ACT_DOSE_85":"120","PEL_DOSE_90":"88","SURVEY_TYPE":"I","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"117400","EVENT_NO":"F01F078","SURVEY_DATE":"09/29/2026","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","ACT_DOSE_85":"27","PEL_DOSE_90":"7","SURVEY_TYPE":"I","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"117399","EVENT_NO":"F01F078","SURVEY_DATE":"09/29/2026","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","ACT_DOSE_85":"89","PEL_DOSE_90":"52","SURVEY_TYPE":"I","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"117395","EVENT_NO":"F0195FC","SURVEY_DATE":"08/06/2026","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","ACT_DOSE_85":"90","PEL_DOSE_90":"68","SURVEY_TYPE":"I","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"117394","EVENT_NO":"F0195FC","SURVEY_DATE":"08/06/2026","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","ACT_DOSE_85":"102","PEL_DOSE_90":"75","SURVEY_TYPE":"I","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"117393","EVENT_NO":"F0195FC","SURVEY_DATE":"08/06/2026","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","ACT_DOSE_85":"37","PEL_DOSE_90":"9","SURVEY_TYPE":"I","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"117392","EVENT_NO":"F0195FC","SURVEY_DATE":"08/06/2026","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","ACT_DOSE_85":"72","PEL_DOSE_90":"37","SURVEY_TYPE":"I","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"117391","EVENT_NO":"F0195FC","SURVEY_DATE":"08/06/2026","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","ACT_DOSE_85":"88","PEL_DOSE_90":"56","SURVEY_TYPE":"I","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"117398","EVENT_NO":"F0195FC","SURVEY_DATE":"07/17/2026","OCCUPATION_CD_DESC":"CLERK/TIMEKEEPER","MACHINE_CD":"40","ACT_DOSE_85":"3","PEL_DOSE_90":"1","SURVEY_TYPE":"I","sourceDate":"2026-07-17"},{"SOURCE_ROW_NUMBER":"117397","EVENT_NO":"F0195FC","SURVEY_DATE":"07/17/2026","OCCUPATION_CD_DESC":"HIGHLIFT OPERATOR/FRONT END LOADER","MACHINE_CD":"18","ACT_DOSE_85":"14","PEL_DOSE_90":"5","SURVEY_TYPE":"I","sourceDate":"2026-07-17"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":31,"firstDate":"2025-09-17","lastDate":"2026-09-29","metrics":{"recentRows":31,"voidSamples":2,"maxQuartzPct":15.2,"validSamples":29,"quartzPctTotal":195.7},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"138623","CASSETTE_NO":"58544159","SAMPLE_DT":"09/29/2026","QUARTZ_PCT":"01.9","QUARTZ_MICROGRAMS":"4","OCC_CODE_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"MMU NOT IN PRODUCING STATUS","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"128975","CASSETTE_NO":"58544308","SAMPLE_DT":"09/29/2026","QUARTZ_PCT":"03.0","QUARTZ_MICROGRAMS":"7","OCC_CODE_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"MMU NOT IN PRODUCING STATUS","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"71117","CASSETTE_NO":"58544174","SAMPLE_DT":"09/29/2026","QUARTZ_PCT":"01.6","QUARTZ_MICROGRAMS":"3","OCC_CODE_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"33702","CASSETTE_NO":"58544145","SAMPLE_DT":"09/29/2026","QUARTZ_PCT":"02.2","QUARTZ_MICROGRAMS":"17","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-09-29"},{"SOURCE_ROW_NUMBER":"145515","CASSETTE_NO":"58544346","SAMPLE_DT":"08/06/2026","QUARTZ_PCT":"01.3","QUARTZ_MICROGRAMS":"7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"84206","CASSETTE_NO":"58543824","SAMPLE_DT":"08/06/2026","QUARTZ_PCT":"02.6","QUARTZ_MICROGRAMS":"8","OCC_CODE_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"72859","CASSETTE_NO":"58544099","SAMPLE_DT":"08/06/2026","QUARTZ_PCT":"01.1","QUARTZ_MICROGRAMS":"2","OCC_CODE_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"72158","CASSETTE_NO":"58544330","SAMPLE_DT":"08/06/2026","QUARTZ_PCT":"01.0","QUARTZ_MICROGRAMS":"2","OCC_CODE_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-08-06"},{"SOURCE_ROW_NUMBER":"117339","CASSETTE_NO":"58541633","SAMPLE_DT":"05/20/2026","QUARTZ_PCT":"13.6","QUARTZ_MICROGRAMS":"18","OCC_CODE_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-05-20"},{"SOURCE_ROW_NUMBER":"101379","CASSETTE_NO":"58542120","SAMPLE_DT":"05/20/2026","QUARTZ_PCT":"08.6","QUARTZ_MICROGRAMS":"17","OCC_CODE_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-05-20"},{"SOURCE_ROW_NUMBER":"95737","CASSETTE_NO":"58542131","SAMPLE_DT":"05/20/2026","QUARTZ_PCT":"11.2","QUARTZ_MICROGRAMS":"98","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-05-20"},{"SOURCE_ROW_NUMBER":"86722","CASSETTE_NO":"58542029","SAMPLE_DT":"05/20/2026","QUARTZ_PCT":"15.2","QUARTZ_MICROGRAMS":"53","OCC_CODE_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2026-05-20"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":46,"firstDate":"2025-05-28","lastDate":"2026-10-06","metrics":{"ss":6,"amountDue":6613,"contested":0,"amountPaid":3189,"recentRows":46,"section104d":0,"unterminated":0,"proposedPenalty":6613},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1208016","VIOLATION_NO":"5085894","VIOLATION_ISSUE_DT":"10/06/2026","SIG_SUB":"N","PART_SECTION":"75.362(d)(2)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Permanent","NO_AFFECTED":"2","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"10/06/2026","CONTESTED_IND":"N","sourceDate":"2026-10-06"},{"SOURCE_ROW_NUMBER":"1208011","VIOLATION_NO":"8853273","VIOLATION_ISSUE_DT":"09/28/2026","SIG_SUB":"N","PART_SECTION":"75.1505(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"16","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"09/28/2026","CONTESTED_IND":"N","sourceDate":"2026-09-28"},{"SOURCE_ROW_NUMBER":"1208015","VIOLATION_NO":"5085893","VIOLATION_ISSUE_DT":"09/25/2026","PART_SECTION":"75.1403","CIT_ORD_SAFE":"Safeguard","NO_AFFECTED":"0","TERMINATION_DT":"09/25/2026","CONTESTED_IND":"N","sourceDate":"2026-09-25"},{"SOURCE_ROW_NUMBER":"1208014","VIOLATION_NO":"5085892","VIOLATION_ISSUE_DT":"09/23/2026","PART_SECTION":"75.1403","CIT_ORD_SAFE":"Safeguard","NO_AFFECTED":"0","TERMINATION_DT":"09/25/2026","CONTESTED_IND":"N","sourceDate":"2026-09-23"},{"SOURCE_ROW_NUMBER":"1208013","VIOLATION_NO":"5085891","VIOLATION_ISSUE_DT":"09/23/2026","SIG_SUB":"Y","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Fatal","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"09/25/2026","CONTESTED_IND":"N","sourceDate":"2026-09-23"},{"SOURCE_ROW_NUMBER":"1208012","VIOLATION_NO":"5085889","VIOLATION_ISSUE_DT":"09/23/2026","CIT_ORD_SAFE":"Order","NO_AFFECTED":"0","TERMINATION_DT":"10/01/2026","CONTESTED_IND":"N","sourceDate":"2026-09-23"},{"SOURCE_ROW_NUMBER":"1208010","VIOLATION_NO":"5085890","VIOLATION_ISSUE_DT":"09/23/2026","SIG_SUB":"N","PART_SECTION":"75.1107-4(a)(2)(ii)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"09/25/2026","CONTESTED_IND":"N","sourceDate":"2026-09-23"},{"SOURCE_ROW_NUMBER":"1208009","VIOLATION_NO":"5085262","VIOLATION_ISSUE_DT":"09/23/2026","SIG_SUB":"N","PART_SECTION":"75.503","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"09/25/2026","CONTESTED_IND":"N","sourceDate":"2026-09-23"},{"SOURCE_ROW_NUMBER":"1208008","VIOLATION_NO":"5085261","VIOLATION_ISSUE_DT":"09/23/2026","SIG_SUB":"N","PART_SECTION":"75.512","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"09/25/2026","CONTESTED_IND":"N","sourceDate":"2026-09-23"},{"SOURCE_ROW_NUMBER":"1208007","VIOLATION_NO":"5085260","VIOLATION_ISSUE_DT":"09/23/2026","SIG_SUB":"Y","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"09/25/2026","CONTESTED_IND":"N","sourceDate":"2026-09-23"},{"SOURCE_ROW_NUMBER":"1208005","VIOLATION_NO":"5085253","VIOLATION_ISSUE_DT":"08/11/2026","SIG_SUB":"N","PART_SECTION":"75.220(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"08/11/2026","PROPOSED_PENALTY":"151","AMOUNT_DUE":"151","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2026-08-11"},{"SOURCE_ROW_NUMBER":"1208004","VIOLATION_NO":"5085252","VIOLATION_ISSUE_DT":"08/11/2026","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"08/11/2026","PROPOSED_PENALTY":"151","AMOUNT_DUE":"151","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2026-08-11"}]}],"safety":{"href":"/api/v1/mines/1519974/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/1519974/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.362","heading":"On-shift examination.","id":"75.362","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.362","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) At least once during each shift, or more often if necessary for safety, a certified person designated by the operator shall conduct an on-shift examination of each section where anyone is assigned to work during the shift and any area where mechanized mining equipment is being installed or removed during the shift. The certified person shall check for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction.\n\n(2) A person designated by the operator shall conduct an examination and record the results and the corrective actions taken to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan. In those instances when a shift change is accomplished without an interruption in production on a section, the examination shall be made anytime within 1 hour after the shift change. In those instances when there is an interruption in production during the shift change, the examination shall be made before production begins on a section. Deficiencies in dust controls shall be corrected before production begins or resumes. The examination shall include: Air quantities and velocities; water pressures and flow rates; excessive leakage in the water delivery system; water spray numbers and orientations; section ventilation and control device placement; roof bolting machine dust collector vacuum levels; scrubber air flow rate; work practices required by the ventilation plan; and any other dust suppression measures. Measurements of the air velocity and quantity, water pressure and flow rates are not required if continuous monitoring of these controls is used and indicates that the dust controls are functioning properly.\n\n(3) On-shift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(b) During each shift that coal is produced, a certified person shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section along each belt conveyor haulageway where a belt conveyor is operated. This examination may be conducted at the same time as the preshift examination of belt conveyors and belt conveyor haulageways, if the examination is conducted within 3 hours before the oncoming shift.\n\n(c) Persons conducting the on-shift examination shall determine at the following locations:\n\n(1) The volume of air in the last open crosscut of each set of entries or rooms on each section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) The volume of air on a longwall or shortwall, including areas where longwall or shortwall equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.\n\n(3) The velocity of air at each end of the longwall or shortwall face at the locations specified in the approved ventilation plan.\n\n(4) The volume of air at the intake end of any pillar line—\n\n(i) Where a single split of air is used in the intake entry furthest from the return air course immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) Where a split system is used in the intake entries of each split immediately inby the split point.\n\n(d) (1) A qualified person shall make tests for methane—\n\n(i) At the start of each shift at each working place before electrically operated equipment is energized; and\n\n(ii) Immediately before equipment is energized, taken into, or operated in a working place; and\n\n(iii) At 20-minute intervals, or more often if required in the approved ventilation plan at specific locations, during the operation of equipment in the working place.\n\n(2) Except as provided for in paragraph (d)(3) of this section, these methane tests shall be made at the face from under permanent roof support, using extendable probes or other acceptable means. When longwall or shortwall mining systems are used, these methane tests shall be made at the shearer, the plow, or the cutting head. When mining has been stopped for more than 20 minutes, methane tests shall be conducted prior to the start up of equipment.\n\n(3) As an alternative method of compliance with paragraph (d)(2) of this section during roof bolting, methane tests may be made by sweeping an area not less than 16 feet inby the last area of permanently supported roof, using a probe or other acceptable means. This method of testing is conditioned on meeting the following requirements:\n\n(i) The roof bolting machine must be equipped with an integral automated temporary roof support (ATRS) system that meets the requirements of 30 CFR 75.209.\n\n(ii) The roof bolting machine must have a permanently mounted, MSHA-approved methane monitor which meets the maintenance and calibration requirements of 30 CFR 75.342(a)(4), the warning signal requirements of 30 CFR 75.342(b), and the automatic de-energization requirements of 30 CFR 75.342(c).\n\n(iii) The methane monitor sensor must be mounted near the inby end and within 18 inches of the longitudinal center of the ATRS support, and positioned at least 12 inches from the roof when the ATRS is fully deployed.\n\n(iv) Manual methane tests must be made at intervals not exceeding 20 minutes. The test may be made either from under permanent roof support or from the roof bolter's work position protected by the deployed ATRS.\n\n(v) Once a methane test is made at the face, all subsequent methane tests in the same area of unsupported roof must also be made at the face, from under permanent roof support, using extendable probes or other acceptable means at intervals not exceeding 20 minutes.\n\n(vi) The district manager may require that the ventilation plan include the minimum air quantity and the position and placement of ventilation controls to be maintained during roof bolting.\n\n(e) If auxiliary fans and tubing are used, they shall be inspected frequently.\n\n(f) During each shift that coal is produced and at intervals not exceeding 4 hours, tests for methane shall be made by a certified person or by an atmospheric monitoring system (AMS) in each return split of air from each working section between the last working place, or longwall or shortwall face, ventilated by that split of air and the junction of the return air split with another air split, seal, or worked-out area. If auxiliary fans and tubing are used, the tests shall be made at a location outby the auxiliary fan discharge.\n\n(g) Certification. (1) The person conducting the on-shift examination in belt haulage entries shall certify by initials, date, and time that the examination was made. The certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(2) The certified person directing the on-shift examination to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan shall:\n\n(i) Certify by initials, date, and time on a board maintained at the section load-out or similar location showing that the examination was made prior to resuming production; and\n\n(ii) Verify, by initials and date, the record of the results of the examination required under (a)(2) of this section to assure compliance with the respirable dust control parameters specified in the mine ventilation plan. The verification shall be made no later than the end of the shift for which the examination was made.\n\n(3) The mine foreman or equivalent mine official shall countersign each examination record required under (a)(2) of this section after it is verified by the certified person under (g)(2)(ii) of this section, and no later than the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(4) Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 26442, May 28, 1996, as amended at 68 FR 40138, July 7, 2003; 77 FR 20715, Apr. 6, 2012; 79 FR 24987, May 1, 2014]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1505","heading":"Escapeway maps.","id":"75.1505","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-P/section-75.1505","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"P","subpartHeading":"Subpart P—Mine Emergencies","text":"(a) Content and accessibility. An escapeway map shall show the designated escapeways from the working sections or the miners' work stations to the surface or the exits at the bottom of the shaft or slope, refuge alternatives, and SCSR storage locations. The escapeway map shall be posted or readily accessible for all miners—\n\n(1) In each working section;\n\n(2) In each area where mechanized mining equipment is being installed or removed;\n\n(3) At the refuge alternative; and\n\n(4) At a surface location of the mine where miners congregate, such as at the mine bulletin board, bathhouse, or waiting room.\n\n(b) Keeping maps current. All maps shall be kept up-to-date and any change in route of travel, location of doors, location of refuge alternatives, or direction of airflow shall be shown on the maps by the end of the shift on which the change is made.\n\n(c) Informing affected miners. Miners underground on a shift when any such change is made shall be notified immediately of the change and other affected miners shall be informed of the change before entering the underground areas of the mine.\n\n[71 FR 71452, Dec. 8, 2006, as amended at 73 FR 80698, Dec. 31, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1403","heading":"Other safeguards.","id":"75.1403","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-O/section-75.1403","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"O","subpartHeading":"Subpart O—Hoisting and Mantrips","text":"[Statutory Provisions]\n\nOther safeguards adequate, in the judgment of an authorized representative of the Secretary, to minimize hazards with respect to transportation of men and materials shall be provided.","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1107-4","heading":"Automatic fire sensors and manual actuators; installation; minimum requirements.","id":"75.1107-4","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1107-4","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a)(1) Where fire suppression devices are installed on unattended underground equipment, one or more point-type sensors or equivalent shall be installed for each 50 square feet of top surface area, or fraction thereof, of such equipment, and each sensor shall be designed to activate the first suppression system and disconnect the electrical power source to the equipment protected, and, except where sprinklers are used, there shall be in addition, a manual actuator installed to operate the system. Where sprinklers are used, provision shall be made for manual application of water to the protected equipment in lieu of a manual actuator.\n\n(2) Two or more manual actuators, where practicable, shall be installed, as provided in paragraphs (a)(2) (i) and (ii) of this section, to activate fire suppression devices on attended equipment purchased on or after the effective date of this § 75.1107-4. At least one manual actuator shall be used on equipment purchased prior to the effective date of this § 75.1107-4.\n\n(i) Manual actuators installed on attended equipment regularly operated by a miner, as provided in § 75.1107-1(c)(1) shall be located at different locations on the equipment, and at least one manual actuator shall be located within easy reach of the operator's normal operating position.\n\n(ii) Manual actuators to activate fire suppression devices on attended equipment not regularly operated by a miner, as provided in § 75.1107-1(c)(2), shall be installed at different location, and at least one manual actuator shall be installed so as to be easily reached by the miner at the jobsite or by persons approaching the equipment.\n\n(b) Sensors shall, where practicable, be installed in accordance with the recommendations set forth in National Fire Code No. 72A “Local Protective Signaling Systems” (NFPA No. 72A-1967).\n\n(c) On unattended equipment the fire suppression device shall operate independently of the power to the main motor (or equivalent) so it will remain operative if the circuit breakers (or other protective device) actuates. On attended equipment powered through a trailing cable the fire suppression device shall operate independently of the electrical power provided by the cable.\n\n(d) Point-type sensors (such as thermocouple, bimetallic strip, or rate of temperature rise) located in ventilated passageways shall be installed downwind from the equipment to be protected.\n\n(e) Sensor systems shall include a device or method for determining their operative condition.\n\n[37 FR 15301, July 29, 1972]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.503","heading":"Permissible electric face equipment; maintenance.","id":"75.503","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nThe operator of each coal mine shall maintain in permissible condition all electric face equipment required by §§ 75.500, 75.501, 75.504 to be permissible which is taken into or used inby the last open crosscut of any such mine.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.512","heading":"Electric equipment; examination, testing and maintenance.","id":"75.512","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.512","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provision]\n\nAll electric equipment shall be frequently examined, tested, and properly maintained by a qualified person to assure safe operating conditions. When a potentially dangerous condition is found on electric equipment, such equipment shall be removed from service until such condition is corrected. A record of such examinations shall be kept and made available to an authorized representative of the Secretary and to the miners in such mine.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.517","heading":"Power wires and cables; insulation and protection.","id":"75.517","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.517","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nPower wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately and fully protected.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.220","heading":"Roof control plan.","id":"75.220","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"C","subpartHeading":"Subpart C—Roof Support","text":"(a)(1) Each mine operator shall develop and follow a roof control plan, approved by the District Manager, that is suitable to the prevailing geological conditions, and the mining system to be used at the mine. Additional measures shall be taken to protect persons if unusual hazards are encountered.\n\n(2) The proposed roof control plan and any revisions to the plan shall be submitted, in writing, to the District Manager. When revisions to a roof control plan are proposed, only the revised pages need to be submitted unless otherwise specified by the District Manager.\n\n(b)(1) The mine operator will be notified in writing of the approval or denial of approval of a proposed roof control plan or proposed revision.\n\n(2) When approval of a proposed plan or revision is denied, the deficiencies of the plan or revision and recommended changes will be specified and the mine operator will be afforded an opportunity to discuss the deficiencies and changes with the District Manager.\n\n(3) Before new support materials, devices or systems other than roof bolts and accessories, are used as the only means of roof support, the District Manager may require that their effectiveness be demonstrated by experimental installations.\n\n(c) No proposed roof control plan or revision to a roof control plan shall be implemented before it is approved.\n\n(d) Before implementing an approved revision to a roof control plan, all persons who are affected by the revision shall be instructed in its provisions.\n\n(e) The approved roof control plan and any revisions shall be available to the miners and representative of miners at the mine.\n\n[53 FR 2375, Jan. 27, 1988; 53 FR 11395, Apr. 6, 1988, as amended at 60 FR 33723, June 29, 1995; 71 FR 16668, Apr. 3, 2006]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"1519974","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}