{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-17T06:17:15.228Z","identity":{"mine_id":"1519848","name":"Bull Branch Mine","status":"Abandoned and Sealed","status_date":"2024-07-11","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"KY","county":"Bell","nearest_town":"TEJAY","operator_id":"0135993","operator_name":"TENNCO INC.","controller_id":"0124921","controller_name":"Jack  Stump; Michael  Runyon","district":"C07","office":"Barbourville KY Field Office","employees":0,"latitude":36.770556,"longitude":-83.522222},"coverage":{"contributingSources":14,"registeredSources":20,"sourceRows":1741},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-17T05:35:58.500035+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"1519848","name":"Bull Branch Mine"},"operator":{"type":"operator","id":"0135993","name":"TENNCO INC."},"controller":{"type":"controller","id":"0124921","name":"Jack  Stump; Michael  Runyon"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-17T05:35:58.500035+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C03319","name":"Daris  Stump"},"object":{"type":"mine","id":"1519848","name":"Bull Branch Mine"},"validFrom":"2014-11-17","validTo":"2015-02-15","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"1519848|C03319|2014-11-17|2015-02-15"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15892","name":"Jack  Stump Et Al"},"object":{"type":"mine","id":"1519848","name":"Bull Branch Mine"},"validFrom":"2015-02-16","validTo":"2016-03-30","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"1519848|C15892|2015-02-16|2016-03-30"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0124921","name":"Michael  Runyon et al"},"object":{"type":"mine","id":"1519848","name":"Bull Branch Mine"},"validFrom":"2016-03-31","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"1519848|0124921|2016-03-31|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0135993","name":"TENNCO INC."},"object":{"type":"mine","id":"1519848","name":"Bull Branch Mine"},"validFrom":"2018-12-04","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"1519848|0135993|2018-12-04|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0124921","name":"Michael  Runyon et al"},"object":{"type":"operator","id":"0135993","name":"TENNCO INC."},"validFrom":"2018-12-04","validTo":null,"current":true,"derived":true,"evidenceMineId":"1519848","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"1519848|0135993|2018-12-04|0124921|2016-03-31|24245"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0124921","name":"Jack  Stump et al"},"object":{"type":"operator","id":"0135993","name":"TENNCO INC."},"validFrom":"2018-12-04","validTo":null,"current":true,"derived":true,"evidenceMineId":"1519848","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"1519848|0135993|2018-12-04|0124921|2016-03-31|24246"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C03319","name":"Daris  Stump"},"object":{"type":"operator","id":"0135993","name":"TENNCO INC."},"validFrom":"2018-12-04","validTo":"2015-02-15","current":false,"derived":true,"evidenceMineId":"1519848","intervalAnomaly":true,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"1519848|0135993|2018-12-04|C03319|2014-11-17|62504"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15892","name":"Jack  Stump Et Al"},"object":{"type":"operator","id":"0135993","name":"TENNCO INC."},"validFrom":"2018-12-04","validTo":"2016-03-30","current":false,"derived":true,"evidenceMineId":"1519848","intervalAnomaly":true,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"1519848|0135993|2018-12-04|C15892|2015-02-16|97530"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15892","name":"Jackie (Mitch)  Fannin Et Al"},"object":{"type":"operator","id":"0135993","name":"TENNCO INC."},"validFrom":"2018-12-04","validTo":"2016-03-30","current":false,"derived":true,"evidenceMineId":"1519848","intervalAnomaly":true,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"1519848|0135993|2018-12-04|C15892|2015-02-16|97531"}}],"coverage":{"historyRecords":5,"edgeCount":9,"intervalAnomalies":3,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":1,"firstDate":"2019-01-15","lastDate":"2019-01-15","metrics":{"daysLost":40,"injuries":1,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"74650","DOCUMENT_NO":"220190160012","ACCIDENT_DT":"01/15/2019","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Caught in, under or between a moving and a stationary object","OCCUPATION":"Greaser, Grease man, Oiler, Lube man, Dragline oiler","NO_INJURIES":"1","DAYS_LOST":"40","NARRATIVE":"Employee was helping mechanic put left cylinder back on D6 Dozer when the cylinder hit against the grill on dozer smashing employee's thumb against grill. Went to Clinic, right thumb was broke in (2) places.","sourceDate":"2019-01-15"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2024-07-11","lastDate":"2024-07-11","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":185,"firstDate":"2019-02-19","lastDate":"2024-07-03","metrics":{"ss":43,"delinquent":164,"recentRows":94,"paidPenalty":31575,"proposedPenalty":32016,"currentAssessment":32016},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2886320","VIOLATION_NO":"8435064","ISSUE_DT":"07/03/2024","CFR_STANDARD_CD":"75.1711-2","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"147.00","CURRENT_ASSESSMENT_AMT":"147.00","ASSESS_CASE_STATUS_CD":"Received","sourceDate":"2024-07-03"},{"SOURCE_ROW_NUMBER":"2884451","VIOLATION_NO":"8408343","ISSUE_DT":"11/27/2023","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"147.00","CURRENT_ASSESSMENT_AMT":"147.00","ASSESS_CASE_STATUS_CD":"Received","sourceDate":"2023-11-27"},{"SOURCE_ROW_NUMBER":"2884450","VIOLATION_NO":"8408341","ISSUE_DT":"11/13/2023","CFR_STANDARD_CD":"75.1403-10(l)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"147.00","CURRENT_ASSESSMENT_AMT":"147.00","ASSESS_CASE_STATUS_CD":"Received","sourceDate":"2023-11-13"},{"SOURCE_ROW_NUMBER":"2884449","VIOLATION_NO":"8408339","ISSUE_DT":"11/03/2023","CFR_STANDARD_CD":"75.402","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"346.00","CURRENT_ASSESSMENT_AMT":"346.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2023-11-03"},{"SOURCE_ROW_NUMBER":"2884448","VIOLATION_NO":"8408338","ISSUE_DT":"11/03/2023","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2023-11-03"},{"SOURCE_ROW_NUMBER":"2884453","VIOLATION_NO":"9288822","ISSUE_DT":"10/27/2023","CFR_STANDARD_CD":"77.1606(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"167.00","CURRENT_ASSESSMENT_AMT":"167.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2023-10-27"},{"SOURCE_ROW_NUMBER":"2884452","VIOLATION_NO":"9288821","ISSUE_DT":"10/27/2023","CFR_STANDARD_CD":"77.404(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"252.00","CURRENT_ASSESSMENT_AMT":"252.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2023-10-27"},{"SOURCE_ROW_NUMBER":"2884440","VIOLATION_NO":"7558572","ISSUE_DT":"10/26/2023","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"2884439","VIOLATION_NO":"7558571","ISSUE_DT":"10/26/2023","CFR_STANDARD_CD":"75.362(g)(3)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"2884447","VIOLATION_NO":"8408327","ISSUE_DT":"10/20/2023","CFR_STANDARD_CD":"75.503","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2023-10-20"},{"SOURCE_ROW_NUMBER":"2884446","VIOLATION_NO":"8408326","ISSUE_DT":"10/18/2023","CFR_STANDARD_CD":"75.503","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2023-10-18"},{"SOURCE_ROW_NUMBER":"2884445","VIOLATION_NO":"8408325","ISSUE_DT":"10/18/2023","CFR_STANDARD_CD":"75.503","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2023-10-18"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":813,"firstDate":"2019-02-09","lastDate":"2023-12-11","metrics":{"recentRows":540,"cpdmSamples":682,"voidSamples":145,"validSamples":668,"maxConcentration":1.634,"concentrationTotal":296.557},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2072624","SMP_TAKEN_DT":"12/11/2023","CONC":".67","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2023-12-11"},{"SOURCE_ROW_NUMBER":"825883","CASS_NUM":"58484752","SMP_TAKEN_DT":"12/8/2023","CONC":".072","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2023-12-08"},{"SOURCE_ROW_NUMBER":"717666","CASS_NUM":"58484749","SMP_TAKEN_DT":"12/8/2023","CONC":".196","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2023-12-08"},{"SOURCE_ROW_NUMBER":"564213","CASS_NUM":"58484761","SMP_TAKEN_DT":"12/8/2023","CONC":".054","SMP_TYPE_CD_DESC":"INTAKE AIR","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2023-12-08"},{"SOURCE_ROW_NUMBER":"388551","CASS_NUM":"58484762","SMP_TAKEN_DT":"12/8/2023","CONC":".151","SMP_TYPE_CD_DESC":"NONDESIGNATED WORK POSITION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SUPERINTENDENT","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2023-12-08"},{"SOURCE_ROW_NUMBER":"2841036","SMP_TAKEN_DT":"12/7/2023","CONC":".351","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2023-12-07"},{"SOURCE_ROW_NUMBER":"2156759","SMP_TAKEN_DT":"12/6/2023","CONC":".869","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2023-12-06"},{"SOURCE_ROW_NUMBER":"2328568","SMP_TAKEN_DT":"12/5/2023","CONC":".472","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2023-12-05"},{"SOURCE_ROW_NUMBER":"2500011","SMP_TAKEN_DT":"12/4/2023","CONC":".411","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2023-12-04"},{"SOURCE_ROW_NUMBER":"2328601","SMP_TAKEN_DT":"12/1/2023","CONC":".639","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2023-12-01"},{"SOURCE_ROW_NUMBER":"2244032","SMP_TAKEN_DT":"11/30/2023","CONC":".512","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2023-11-30"},{"SOURCE_ROW_NUMBER":"2841258","SMP_TAKEN_DT":"11/29/2023","CONC":".811","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CPDM","sourceDate":"2023-11-29"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":1,"firstDate":"2019-04-22","lastDate":"2019-04-22","metrics":{"linkedIssuances":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":323,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":4,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":54,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":5,"firstDate":"2018-12-04","lastDate":"2018-12-04","metrics":{"recentRows":0,"currentOperatorTenures":5,"completedOperatorTenures":0},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":48,"firstDate":"2019-01-09","lastDate":"2024-07-03","metrics":{"inspectors":132,"recentRows":26,"onSiteHours":2429.5,"inspectionHours":3789.25,"inspectionSamples":121},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"780382","EVENT_NO":"7047437","INSPECTION_BEGIN_DT":"07/03/2024","INSPECTION_END_DT":"07/10/2024","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"20","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2024-07-03"},{"SOURCE_ROW_NUMBER":"84197","EVENT_NO":"7047433","INSPECTION_BEGIN_DT":"06/05/2024","INSPECTION_END_DT":"07/03/2024","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5","SUM_TOTAL_ON_SITE_HOURS":"2","sourceDate":"2024-06-05"},{"SOURCE_ROW_NUMBER":"452204","EVENT_NO":"F004705","INSPECTION_BEGIN_DT":"05/07/2024","INSPECTION_END_DT":"05/07/2024","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"3","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2024-05-07"},{"SOURCE_ROW_NUMBER":"834609","EVENT_NO":"7022159","INSPECTION_BEGIN_DT":"04/02/2024","INSPECTION_END_DT":"04/09/2024","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7.5","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2024-04-02"},{"SOURCE_ROW_NUMBER":"1017682","EVENT_NO":"7020150","INSPECTION_BEGIN_DT":"03/27/2024","INSPECTION_END_DT":"03/28/2024","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"11.5","SUM_TOTAL_ON_SITE_HOURS":"7.5","sourceDate":"2024-03-27"},{"SOURCE_ROW_NUMBER":"420182","EVENT_NO":"7020284","INSPECTION_BEGIN_DT":"01/02/2024","INSPECTION_END_DT":"02/22/2024","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"50","SUM_TOTAL_ON_SITE_HOURS":"22.5","sourceDate":"2024-01-02"},{"SOURCE_ROW_NUMBER":"964160","EVENT_NO":"7045831","INSPECTION_BEGIN_DT":"12/26/2023","INSPECTION_END_DT":"12/26/2023","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10.5","SUM_TOTAL_ON_SITE_HOURS":"5.5","sourceDate":"2023-12-26"},{"SOURCE_ROW_NUMBER":"444346","EVENT_NO":"7045522","INSPECTION_BEGIN_DT":"12/07/2023","INSPECTION_END_DT":"12/11/2023","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"18","SUM_TOTAL_ON_SITE_HOURS":"11","sourceDate":"2023-12-07"},{"SOURCE_ROW_NUMBER":"791636","EVENT_NO":"7020138","INSPECTION_BEGIN_DT":"10/02/2023","INSPECTION_END_DT":"10/02/2023","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"12","SUM_TOTAL_ON_SITE_HOURS":"7.5","sourceDate":"2023-10-02"},{"SOURCE_ROW_NUMBER":"74901","EVENT_NO":"7045683","INSPECTION_BEGIN_DT":"10/02/2023","INSPECTION_END_DT":"11/29/2023","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"6","SUM_TOTAL_INSP_HOURS":"256.5","SUM_TOTAL_ON_SITE_HOURS":"183.5","sourceDate":"2023-10-02"},{"SOURCE_ROW_NUMBER":"1087757","EVENT_NO":"7020275","INSPECTION_BEGIN_DT":"07/03/2023","INSPECTION_END_DT":"09/15/2023","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"7","SUM_TOTAL_INSP_HOURS":"318.75","SUM_TOTAL_ON_SITE_HOURS":"202.25","sourceDate":"2023-07-03"},{"SOURCE_ROW_NUMBER":"880750","EVENT_NO":"4460085","INSPECTION_BEGIN_DT":"04/03/2023","INSPECTION_END_DT":"06/15/2023","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"5","SUM_TOTAL_INSP_HOURS":"275.5","SUM_TOTAL_ON_SITE_HOURS":"181","sourceDate":"2023-04-03"}]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":8,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2019":{"hours":56358,"employees":24,"production":182278},"2020":{"hours":30670,"employees":27,"production":89489},"2022":{"hours":39233,"employees":20,"production":110773},"2023":{"hours":65492,"employees":24,"production":130009}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":69,"firstDate":"2019-03-12","lastDate":"2023-12-08","metrics":{"recentRows":38,"doseOver100":3,"actDoseTotal":3791,"pelDoseTotal":2520},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"114990","EVENT_NO":"7045522","SURVEY_DATE":"12/08/2023","OCCUPATION_CD_DESC":"SUPERINTENDENT","MACHINE_CD":"40","ACT_DOSE_85":"10","PEL_DOSE_90":"2","SURVEY_TYPE":"I","sourceDate":"2023-12-08"},{"SOURCE_ROW_NUMBER":"114989","EVENT_NO":"7045522","SURVEY_DATE":"12/08/2023","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","ACT_DOSE_85":"65","PEL_DOSE_90":"38","SURVEY_TYPE":"I","sourceDate":"2023-12-08"},{"SOURCE_ROW_NUMBER":"114988","EVENT_NO":"7045522","SURVEY_DATE":"12/08/2023","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","ACT_DOSE_85":"96","PEL_DOSE_90":"72","SURVEY_TYPE":"I","sourceDate":"2023-12-08"},{"SOURCE_ROW_NUMBER":"114996","EVENT_NO":"7045683","SURVEY_DATE":"11/17/2023","OCCUPATION_CD_DESC":"MINE FOREMAN/MINE MANAGER","MACHINE_CD":"40","MANUFACTURER_CD":"120","ACT_DOSE_85":"2","PEL_DOSE_90":"0","SURVEY_TYPE":"I","sourceDate":"2023-11-17"},{"SOURCE_ROW_NUMBER":"114995","EVENT_NO":"7045683","SURVEY_DATE":"10/26/2023","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","ACT_DOSE_85":"43","PEL_DOSE_90":"26","SURVEY_TYPE":"I","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"114994","EVENT_NO":"7045683","SURVEY_DATE":"10/26/2023","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","ACT_DOSE_85":"23","PEL_DOSE_90":"11","SURVEY_TYPE":"I","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"114993","EVENT_NO":"7045683","SURVEY_DATE":"10/26/2023","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (OFF STANDARD)","MACHINE_CD":"37","ACT_DOSE_85":"18","PEL_DOSE_90":"5","SURVEY_TYPE":"I","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"114992","EVENT_NO":"7045683","SURVEY_DATE":"10/26/2023","OCCUPATION_CD_DESC":"UTILITY MAN","MACHINE_CD":"40","ACT_DOSE_85":"22","PEL_DOSE_90":"9","SURVEY_TYPE":"I","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"114991","EVENT_NO":"7045683","SURVEY_DATE":"10/26/2023","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","ACT_DOSE_85":"67","PEL_DOSE_90":"44","SURVEY_TYPE":"I","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"114982","EVENT_NO":"7020275","SURVEY_DATE":"07/20/2023","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","ACT_DOSE_85":"24","PEL_DOSE_90":"16","SURVEY_TYPE":"I","sourceDate":"2023-07-20"},{"SOURCE_ROW_NUMBER":"114981","EVENT_NO":"7020275","SURVEY_DATE":"07/20/2023","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (OFF STANDARD)","MACHINE_CD":"37","ACT_DOSE_85":"38","PEL_DOSE_90":"24","SURVEY_TYPE":"I","sourceDate":"2023-07-20"},{"SOURCE_ROW_NUMBER":"114980","EVENT_NO":"7020275","SURVEY_DATE":"07/20/2023","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (OFF STANDARD)","MACHINE_CD":"37","ACT_DOSE_85":"42","PEL_DOSE_90":"26","SURVEY_TYPE":"I","sourceDate":"2023-07-20"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":39,"firstDate":"2019-03-15","lastDate":"2023-12-08","metrics":{"recentRows":20,"voidSamples":0,"maxQuartzPct":12.4,"validSamples":39,"quartzPctTotal":201.8},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"21007","CASSETTE_NO":"58484749","SAMPLE_DT":"12/08/2023","QUARTZ_PCT":"07.8","QUARTZ_MICROGRAMS":"15","OCC_CODE_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-12-08"},{"SOURCE_ROW_NUMBER":"71169","CASSETTE_NO":"58485093","SAMPLE_DT":"10/26/2023","QUARTZ_PCT":"02.0","QUARTZ_MICROGRAMS":"4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"44841","CASSETTE_NO":"58485087","SAMPLE_DT":"10/26/2023","QUARTZ_PCT":"01.6","QUARTZ_MICROGRAMS":"2","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"68731","CASSETTE_NO":"58484679","SAMPLE_DT":"07/20/2023","QUARTZ_MICROGRAMS":"0","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-07-20"},{"SOURCE_ROW_NUMBER":"55865","CASSETTE_NO":"58484920","SAMPLE_DT":"07/20/2023","QUARTZ_PCT":"08.8","QUARTZ_MICROGRAMS":"10","OCC_CODE_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-07-20"},{"SOURCE_ROW_NUMBER":"50265","CASSETTE_NO":"58484892","SAMPLE_DT":"07/20/2023","QUARTZ_PCT":"09.9","QUARTZ_MICROGRAMS":"11","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-07-20"},{"SOURCE_ROW_NUMBER":"153141","CASSETTE_NO":"58484774","SAMPLE_DT":"04/18/2023","QUARTZ_PCT":"03.9","QUARTZ_MICROGRAMS":"26","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-04-18"},{"SOURCE_ROW_NUMBER":"133436","CASSETTE_NO":"58484782","SAMPLE_DT":"04/18/2023","QUARTZ_PCT":"03.6","QUARTZ_MICROGRAMS":"11","OCC_CODE_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-04-18"},{"SOURCE_ROW_NUMBER":"71729","CASSETTE_NO":"58484930","SAMPLE_DT":"04/18/2023","QUARTZ_PCT":"03.8","QUARTZ_MICROGRAMS":"6","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-04-18"},{"SOURCE_ROW_NUMBER":"24927","CASSETTE_NO":"58484781","SAMPLE_DT":"04/18/2023","QUARTZ_PCT":"04.6","QUARTZ_MICROGRAMS":"6","OCC_CODE_DESC":"SHUTTLE CAR OPERATOR (OFF STANDARD)","SAMPLE_TYPE_DESC":"NON DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-04-18"},{"SOURCE_ROW_NUMBER":"65158","CASSETTE_NO":"58456289","SAMPLE_DT":"02/03/2023","QUARTZ_PCT":"04.3","QUARTZ_MICROGRAMS":"16","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-02-03"},{"SOURCE_ROW_NUMBER":"13727","CASSETTE_NO":"58456468","SAMPLE_DT":"02/03/2023","QUARTZ_PCT":"02.5","QUARTZ_MICROGRAMS":"5","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2023-02-03"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":193,"firstDate":"2019-02-19","lastDate":"2024-07-03","metrics":{"ss":43,"amountDue":32016,"contested":0,"amountPaid":31575,"recentRows":98,"section104d":0,"unterminated":2,"proposedPenalty":32016},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1203728","VIOLATION_NO":"8435064","VIOLATION_ISSUE_DT":"07/03/2024","SIG_SUB":"N","PART_SECTION":"75.1711-2","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/09/2024","PROPOSED_PENALTY":"147","AMOUNT_DUE":"147","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2024-07-03"},{"SOURCE_ROW_NUMBER":"1203769","VIOLATION_NO":"8408343","VIOLATION_ISSUE_DT":"11/27/2023","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"11/27/2023","PROPOSED_PENALTY":"147","AMOUNT_DUE":"147","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2023-11-27"},{"SOURCE_ROW_NUMBER":"1203768","VIOLATION_NO":"8408341","VIOLATION_ISSUE_DT":"11/13/2023","SIG_SUB":"N","PART_SECTION":"75.1403-10(l)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"11/14/2023","PROPOSED_PENALTY":"147","AMOUNT_DUE":"147","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2023-11-13"},{"SOURCE_ROW_NUMBER":"1203767","VIOLATION_NO":"8408339","VIOLATION_ISSUE_DT":"11/03/2023","SIG_SUB":"Y","PART_SECTION":"75.402","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"11/09/2023","PROPOSED_PENALTY":"346","AMOUNT_DUE":"346","AMOUNT_PAID":"346","CONTESTED_IND":"N","sourceDate":"2023-11-03"},{"SOURCE_ROW_NUMBER":"1203766","VIOLATION_NO":"8408338","VIOLATION_ISSUE_DT":"11/03/2023","SIG_SUB":"N","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"11/09/2023","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2023-11-03"},{"SOURCE_ROW_NUMBER":"1203771","VIOLATION_NO":"9288822","VIOLATION_ISSUE_DT":"10/27/2023","SIG_SUB":"N","PART_SECTION":"77.1606(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"11/03/2023","PROPOSED_PENALTY":"167","AMOUNT_DUE":"167","AMOUNT_PAID":"167","CONTESTED_IND":"N","sourceDate":"2023-10-27"},{"SOURCE_ROW_NUMBER":"1203770","VIOLATION_NO":"9288821","VIOLATION_ISSUE_DT":"10/27/2023","SIG_SUB":"Y","PART_SECTION":"77.404(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"11/13/2023","PROPOSED_PENALTY":"252","AMOUNT_DUE":"252","AMOUNT_PAID":"252","CONTESTED_IND":"N","sourceDate":"2023-10-27"},{"SOURCE_ROW_NUMBER":"1203758","VIOLATION_NO":"7558572","VIOLATION_ISSUE_DT":"10/26/2023","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/26/2023","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"1203757","VIOLATION_NO":"7558571","VIOLATION_ISSUE_DT":"10/26/2023","SIG_SUB":"N","PART_SECTION":"75.362(g)(3)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/26/2023","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2023-10-26"},{"SOURCE_ROW_NUMBER":"1203765","VIOLATION_NO":"8408327","VIOLATION_ISSUE_DT":"10/20/2023","SIG_SUB":"N","PART_SECTION":"75.503","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/20/2023","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2023-10-20"},{"SOURCE_ROW_NUMBER":"1203764","VIOLATION_NO":"8408326","VIOLATION_ISSUE_DT":"10/18/2023","SIG_SUB":"N","PART_SECTION":"75.503","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/20/2023","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2023-10-18"},{"SOURCE_ROW_NUMBER":"1203763","VIOLATION_NO":"8408325","VIOLATION_ISSUE_DT":"10/18/2023","SIG_SUB":"N","PART_SECTION":"75.503","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/20/2023","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2023-10-18"}]}],"safety":{"href":"/api/v1/mines/1519848/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/1519848/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","heading":"Sealing of slope or drift openings.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1711-2","part":"75","subchapter":"O","subpart":"R","id":"75.1711-2","citation":"30 CFR 75.1711-2","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1403-10","heading":"Criteria—Haulage; general.","id":"75.1403-10","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-O/section-75.1403-10","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"O","subpartHeading":"Subpart O—Hoisting and Mantrips","text":"(a) A permissible trip light or other approved device such as reflectors, approved by the Coal Mine Safety District Manager(s), should be used on the rear of trips pulled, on the front of trips pushed and on trips lowered in slopes. However, trip lights or other approved devices need not be used on cars being shifted to and from loading machines, on cars being handled at loading heads, during gathering operations at working faces, when trailing locomotives are used, or on trips pulled by animals.\n\n(b) Cars on main haulage roads should not be pushed, except where necessary to push cars from side tracks located near the working section to the producing entries and rooms, where necessary to clear switches and sidetracks, and on the approach to cages, slopes, and surface inclines.\n\n(c) Warning lights or reflective signs or tapes should be installed along haulage roads at locations of abrupt or sudden changes in the overhead clearance.\n\n(d) No person, other than the motorman and brakeman, should ride on a locomotive unless authorized by the mine foreman, and then only when safe riding facilities are provided. No person should ride on any loaded car or on the bumper of any car. However, the brakeman may ride on the rear bumper of the last car of a slow moving trip pulled by a locomotive.\n\n(e) Positive-acting stopblocks or derails should be used where necessary to protect persons from danger of runaway haulage equipment.\n\n(f) An audible warning should be given by the operator of all self-propelled equipment including off-track equipment, where persons may be endangered by the movement of the equipment.\n\n(g) Locomotives and personnel carriers should not approach to within 300 feet of preceding haulage equipment, except trailing locomotives that are an integral part of the trip.\n\n(h) A total of at least 36 inches of unobstructed side clearance (both sides combined) should be provided for all rubber-tired haulage equipment where such equipment is used.\n\n(i) Off-track haulage roadways should be maintained as free as practicable from bottom irregularities, debris, and wet or muddy conditions that affect the control of the equipment.\n\n(j) Operators of self-propelled equipment should face in the direction of travel.\n\n(k) Mechanical steering and control devices should be maintained so as to provide positive control at all times.\n\n(l) All self-propelled rubber-tired haulage equipment should be equipped with well maintained brakes, lights, and a warning device.\n\n(m) On and after March 30, 1971, all tram control switches on rubber-tired equipment should be designed to provide automatic return to the stop or off position when released.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.402","heading":"Rock dusting.","id":"75.402","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.402","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"[Statutory Provision]\n\nAll underground areas of a coal mine, except those areas in which the dust is too wet or too high in incombustible content to propagate an explosion, shall be rock dusted to within 40 feet of all working faces, unless such areas are inaccessible or unsafe to enter or unless the Secretary or his authorized representative permits an exception upon his finding that such exception will not pose a hazard to the miners. All crosscuts that are less than 40 feet from a working face shall also be rock dusted.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.1606","heading":"Loading and haulage equipment; inspection and maintenance.","id":"77.1606","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-Q/section-77.1606","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"Q","subpartHeading":"Subpart Q—Loading and Haulage","text":"(a) Mobile loading and haulage equipment shall be inspected by a competent person before such equipment is placed in operation. Equipment defects affecting safety shall be recorded and reported to the mine operator.\n\n(b) Carriers on aerial tramways, including loading and unloading mechanisms, shall be inspected each shift; brakes shall be inspected daily; ropes and supports shall be inspected as recommended by the manufacturer or as physical conditions warrant. Equipment defects affecting safety shall be reported to the mine operator.\n\n(c) Equipment defects affecting safety shall be corrected before the equipment is used.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.404","heading":"Machinery and equipment; operation and maintenance.","id":"77.404","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-E/section-77.404","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Safeguards for Mechanical Equipment","text":"(a) Mobile and stationary machinery and equipment shall be maintained in safe operating condition and machinery or equipment in unsafe condition shall be removed from service immediately.\n\n(b) Machinery and equipment shall be operated only by persons trained in the use of and authorized to operate such machinery or equipment.\n\n(c) Repairs or maintenance shall not be performed on machinery until the power is off and the machinery is blocked against motion, except where machinery motion is necessary to make adjustments.\n\n(d) Machinery shall not be lubricated while in motion where a hazard exists, unless equipped with extended fittings or cups.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.362","heading":"On-shift examination.","id":"75.362","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.362","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) At least once during each shift, or more often if necessary for safety, a certified person designated by the operator shall conduct an on-shift examination of each section where anyone is assigned to work during the shift and any area where mechanized mining equipment is being installed or removed during the shift. The certified person shall check for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction.\n\n(2) A person designated by the operator shall conduct an examination and record the results and the corrective actions taken to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan. In those instances when a shift change is accomplished without an interruption in production on a section, the examination shall be made anytime within 1 hour after the shift change. In those instances when there is an interruption in production during the shift change, the examination shall be made before production begins on a section. Deficiencies in dust controls shall be corrected before production begins or resumes. The examination shall include: Air quantities and velocities; water pressures and flow rates; excessive leakage in the water delivery system; water spray numbers and orientations; section ventilation and control device placement; roof bolting machine dust collector vacuum levels; scrubber air flow rate; work practices required by the ventilation plan; and any other dust suppression measures. Measurements of the air velocity and quantity, water pressure and flow rates are not required if continuous monitoring of these controls is used and indicates that the dust controls are functioning properly.\n\n(3) On-shift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(b) During each shift that coal is produced, a certified person shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section along each belt conveyor haulageway where a belt conveyor is operated. This examination may be conducted at the same time as the preshift examination of belt conveyors and belt conveyor haulageways, if the examination is conducted within 3 hours before the oncoming shift.\n\n(c) Persons conducting the on-shift examination shall determine at the following locations:\n\n(1) The volume of air in the last open crosscut of each set of entries or rooms on each section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) The volume of air on a longwall or shortwall, including areas where longwall or shortwall equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.\n\n(3) The velocity of air at each end of the longwall or shortwall face at the locations specified in the approved ventilation plan.\n\n(4) The volume of air at the intake end of any pillar line—\n\n(i) Where a single split of air is used in the intake entry furthest from the return air course immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) Where a split system is used in the intake entries of each split immediately inby the split point.\n\n(d) (1) A qualified person shall make tests for methane—\n\n(i) At the start of each shift at each working place before electrically operated equipment is energized; and\n\n(ii) Immediately before equipment is energized, taken into, or operated in a working place; and\n\n(iii) At 20-minute intervals, or more often if required in the approved ventilation plan at specific locations, during the operation of equipment in the working place.\n\n(2) Except as provided for in paragraph (d)(3) of this section, these methane tests shall be made at the face from under permanent roof support, using extendable probes or other acceptable means. When longwall or shortwall mining systems are used, these methane tests shall be made at the shearer, the plow, or the cutting head. When mining has been stopped for more than 20 minutes, methane tests shall be conducted prior to the start up of equipment.\n\n(3) As an alternative method of compliance with paragraph (d)(2) of this section during roof bolting, methane tests may be made by sweeping an area not less than 16 feet inby the last area of permanently supported roof, using a probe or other acceptable means. This method of testing is conditioned on meeting the following requirements:\n\n(i) The roof bolting machine must be equipped with an integral automated temporary roof support (ATRS) system that meets the requirements of 30 CFR 75.209.\n\n(ii) The roof bolting machine must have a permanently mounted, MSHA-approved methane monitor which meets the maintenance and calibration requirements of 30 CFR 75.342(a)(4), the warning signal requirements of 30 CFR 75.342(b), and the automatic de-energization requirements of 30 CFR 75.342(c).\n\n(iii) The methane monitor sensor must be mounted near the inby end and within 18 inches of the longitudinal center of the ATRS support, and positioned at least 12 inches from the roof when the ATRS is fully deployed.\n\n(iv) Manual methane tests must be made at intervals not exceeding 20 minutes. The test may be made either from under permanent roof support or from the roof bolter's work position protected by the deployed ATRS.\n\n(v) Once a methane test is made at the face, all subsequent methane tests in the same area of unsupported roof must also be made at the face, from under permanent roof support, using extendable probes or other acceptable means at intervals not exceeding 20 minutes.\n\n(vi) The district manager may require that the ventilation plan include the minimum air quantity and the position and placement of ventilation controls to be maintained during roof bolting.\n\n(e) If auxiliary fans and tubing are used, they shall be inspected frequently.\n\n(f) During each shift that coal is produced and at intervals not exceeding 4 hours, tests for methane shall be made by a certified person or by an atmospheric monitoring system (AMS) in each return split of air from each working section between the last working place, or longwall or shortwall face, ventilated by that split of air and the junction of the return air split with another air split, seal, or worked-out area. If auxiliary fans and tubing are used, the tests shall be made at a location outby the auxiliary fan discharge.\n\n(g) Certification. (1) The person conducting the on-shift examination in belt haulage entries shall certify by initials, date, and time that the examination was made. The certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(2) The certified person directing the on-shift examination to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan shall:\n\n(i) Certify by initials, date, and time on a board maintained at the section load-out or similar location showing that the examination was made prior to resuming production; and\n\n(ii) Verify, by initials and date, the record of the results of the examination required under (a)(2) of this section to assure compliance with the respirable dust control parameters specified in the mine ventilation plan. The verification shall be made no later than the end of the shift for which the examination was made.\n\n(3) The mine foreman or equivalent mine official shall countersign each examination record required under (a)(2) of this section after it is verified by the certified person under (g)(2)(ii) of this section, and no later than the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(4) Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 26442, May 28, 1996, as amended at 68 FR 40138, July 7, 2003; 77 FR 20715, Apr. 6, 2012; 79 FR 24987, May 1, 2014]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.503","heading":"Permissible electric face equipment; maintenance.","id":"75.503","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nThe operator of each coal mine shall maintain in permissible condition all electric face equipment required by §§ 75.500, 75.501, 75.504 to be permissible which is taken into or used inby the last open crosscut of any such mine.","occurrenceCount":3}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"1519848","dataSource":"postgres","snapshotId":"2026-10-17T05:35:58.500035+00:00","completedAt":"2026-10-17T06:17:15.228Z","sourceCount":20,"totalRows":15450873}}