{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"1519531","name":"White Cabin #9","status":"Abandoned and Sealed","status_date":"2012-12-02","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"KY","county":"Martin","nearest_town":"Inez","operator_id":"P00908","operator_name":"Martin County Coal Corp.","controller_id":"0127923","controller_name":"Alpha Natural Resources Holdings, Inc","district":"C07","office":"Hazard KY Field Office","employees":0,"latitude":37.693611,"longitude":-82.5375},"coverage":{"contributingSources":17,"registeredSources":20,"sourceRows":637},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"1519531","name":"White Cabin #9"},"operator":{"type":"operator","id":"P00908","name":"Martin County Coal Corp."},"controller":{"type":"controller","id":"0127923","name":"Alpha Natural Resources Holdings, Inc"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C02508","name":"Massey Energy Company"},"object":{"type":"mine","id":"1519531","name":"White Cabin #9"},"validFrom":"1975-05-28","validTo":"2011-05-31","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519531|C02508|1975-05-28|2011-05-31"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P00908","name":"Martin County Coal Corp."},"object":{"type":"mine","id":"1519531","name":"White Cabin #9"},"validFrom":"2010-09-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519531|P00908|2010-09-01|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C02508","name":"Massey Energy Company"},"object":{"type":"operator","id":"P00908","name":"Martin County Coal Corp."},"validFrom":"2010-09-01","validTo":"2011-05-31","current":false,"derived":true,"evidenceMineId":"1519531","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519531|P00908|2010-09-01|C02508|1975-05-28|59040"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"mine","id":"1519531","name":"White Cabin #9"},"validFrom":"2011-06-01","validTo":"2016-07-25","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519531|0041211|2011-06-01|2016-07-25"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"operator","id":"P00908","name":"Martin County Coal Corp."},"validFrom":"2011-06-01","validTo":"2016-07-25","current":false,"derived":true,"evidenceMineId":"1519531","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519531|P00908|2010-09-01|0041211|2011-06-01|1907"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0127923","name":"Alpha Natural Resources Holdings, Inc"},"object":{"type":"mine","id":"1519531","name":"White Cabin #9"},"validFrom":"2016-07-26","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519531|0127923|2016-07-26|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0127923","name":"Alpha Natural Resources Holdings, Inc"},"object":{"type":"operator","id":"P00908","name":"Martin County Coal Corp."},"validFrom":"2016-07-26","validTo":null,"current":true,"derived":true,"evidenceMineId":"1519531","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519531|P00908|2010-09-01|0127923|2016-07-26|25448"}}],"coverage":{"historyRecords":3,"edgeCount":7,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":11,"firstDate":"2011-05-20","lastDate":"2012-06-01","metrics":{"daysLost":186,"injuries":5,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"130394","DOCUMENT_NO":"220121580008","ACCIDENT_DT":"06/01/2012","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A non-injury roof fall occurred at this mine at approximately 11:40 pm, the fall occurred on the #3 beltline in the #4 entry the size of fall was 20' long and 5' high.","sourceDate":"2012-06-01"},{"SOURCE_ROW_NUMBER":"212362","DOCUMENT_NO":"220121580007","ACCIDENT_DT":"05/31/2012","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A non injury roof fall occurred at this mine, the roof fall occurred on the #3 belt at break 10 in the crosscut between #5 and #6 entry crushing out the stopping separating the belt from the primary intake. 40' by 6' high.","sourceDate":"2012-05-31"},{"SOURCE_ROW_NUMBER":"100342","DOCUMENT_NO":"220121280048","ACCIDENT_DT":"05/02/2012","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"LW Propman, Propman helper, Move crew if LW, Move-up man, Jacksetter, Advanceman LW helper","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"While putting a man door in the stopping a block fell striking his left hand requiring stitches.","sourceDate":"2012-05-02"},{"SOURCE_ROW_NUMBER":"121841","DOCUMENT_NO":"220121010011","ACCIDENT_DT":"03/30/2012","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A non-injury roof fall occurred in the #3 entry, 1 break inby survey station 649 of the 001 MMU. Fall was approximately 20'W X 20'L X 6'H and will not be cleaned up and has been breakered off.","sourceDate":"2012-03-30"},{"SOURCE_ROW_NUMBER":"216723","DOCUMENT_NO":"220120900056","ACCIDENT_DT":"03/28/2012","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"118","NARRATIVE":"Employee was bolting top in #4 entry when a piece of draw rock fell striking him in the left shoulder.  The rock measured approximately 3' X 2' X 1\" to 10\".","sourceDate":"2012-03-28"},{"SOURCE_ROW_NUMBER":"264017","DOCUMENT_NO":"220113120011","ACCIDENT_DT":"09/28/2011","DEGREE_INJURY":"PERM TOT OR PERM PRTL DISABLTY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Electrician, Lineman","NO_INJURIES":"1","NARRATIVE":"Employee was removing a rock from the #2 take-up when he felt a pain in his shoulder, back and abdomen. He continued to work until 10-3-11 when he started missing work. Workers Comp was looki ng to see if a pre-existing condition existed and the Safety Dept. was notified on 11-2-11 that the accident did not involve a pre-existing condition. Diagnosed with a hernia.","sourceDate":"2011-09-28"},{"SOURCE_ROW_NUMBER":"199352","DOCUMENT_NO":"220112290038","ACCIDENT_DT":"08/15/2011","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A non injury roof fall was discovered in the 1st Northwest Mains while preshift exam was conducted. Roof fall was reported to MSHA","sourceDate":"2011-08-15"},{"SOURCE_ROW_NUMBER":"79016","DOCUMENT_NO":"220112170035","ACCIDENT_DT":"08/01/2011","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall to the walkway or working surface","OCCUPATION":"Discontinued 1/31/2014.  Several other codes cover Scoop Car Operator","NO_INJURIES":"1","DAYS_LOST":"68","NARRATIVE":"Employee was walking towards the underground forklift when he tripped on some mud, falling and twisting his right ankle.","sourceDate":"2011-08-01"},{"SOURCE_ROW_NUMBER":"156458","DOCUMENT_NO":"220111530005","ACCIDENT_DT":"05/31/2011","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A non injury roof fall occurred in the No.7 entry, this is a continuation of a non injury roof fall reported for 5/20/2011. MSHA roof control specialist investigated the non injury roof fall.","sourceDate":"2011-05-31"},{"SOURCE_ROW_NUMBER":"79015","DOCUMENT_NO":"220111520026","ACCIDENT_DT":"05/27/2011","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"While bolting top the roof bolt operator turned to make a bolt up and a piece of roof fell striking the employee on the right ear causing a laceration, Employee received first aid at scene and was transported to HRMC at Prestonsburg Ky,where he received stitches to his right ear.","sourceDate":"2011-05-27"},{"SOURCE_ROW_NUMBER":"268251","DOCUMENT_NO":"220111440003","ACCIDENT_DT":"05/20/2011","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A non injury Roof fall occurred in the #7 heading, The roof fall was reported to MSHA by Supt. of White cabin #9, EE was assigned by MSHA to investigate the roof fall. The roof fall measured 18'x18'x7'","sourceDate":"2011-05-20"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2012-12-02","lastDate":"2012-12-02","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":115,"firstDate":"2010-10-26","lastDate":"2012-06-08","metrics":{"ss":42,"delinquent":115,"recentRows":0,"paidPenalty":36643,"proposedPenalty":37021,"currentAssessment":36643},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1946768","VIOLATION_NO":"8271295","ISSUE_DT":"06/08/2012","CFR_STANDARD_CD":"75.517","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-06-08"},{"SOURCE_ROW_NUMBER":"1946767","VIOLATION_NO":"8271293","ISSUE_DT":"06/04/2012","CFR_STANDARD_CD":"75.403","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-06-04"},{"SOURCE_ROW_NUMBER":"1958037","VIOLATION_NO":"8264034","ISSUE_DT":"05/31/2012","CFR_STANDARD_CD":"75.380(g)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"425.00","CURRENT_ASSESSMENT_AMT":"425.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-31"},{"SOURCE_ROW_NUMBER":"1958036","VIOLATION_NO":"8264033","ISSUE_DT":"05/31/2012","CFR_STANDARD_CD":"75.202(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"634.00","CURRENT_ASSESSMENT_AMT":"634.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-31"},{"SOURCE_ROW_NUMBER":"1946772","VIOLATION_NO":"8274511","ISSUE_DT":"05/23/2012","CFR_STANDARD_CD":"75.1103-5","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1946771","VIOLATION_NO":"8274510","ISSUE_DT":"05/23/2012","CFR_STANDARD_CD":"48.29","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1946770","VIOLATION_NO":"8274509","ISSUE_DT":"05/23/2012","CFR_STANDARD_CD":"75.1502","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"127.00","CURRENT_ASSESSMENT_AMT":"127.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1946769","VIOLATION_NO":"8274508","ISSUE_DT":"05/23/2012","CFR_STANDARD_CD":"75.1502","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1946766","VIOLATION_NO":"8271290","ISSUE_DT":"05/23/2012","CFR_STANDARD_CD":"75.333(e)(1)(ii)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"108.00","CURRENT_ASSESSMENT_AMT":"108.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1946765","VIOLATION_NO":"8271289","ISSUE_DT":"05/23/2012","CFR_STANDARD_CD":"75.517","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"108.00","CURRENT_ASSESSMENT_AMT":"108.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1946764","VIOLATION_NO":"8271288","ISSUE_DT":"05/23/2012","CFR_STANDARD_CD":"75.1100-2(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"1530.00","CURRENT_ASSESSMENT_AMT":"1530.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1946763","VIOLATION_NO":"8271287","ISSUE_DT":"05/23/2012","CFR_STANDARD_CD":"75.380(d)(7)(vi)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"362.00","CURRENT_ASSESSMENT_AMT":"362.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2012-05-23"}]},{"id":"msha-civil-penalty-dockets-decisions","name":"Civil Penalty Dockets and Decisions","domains":["compliance","legal"],"products":["docket lineage","decision outcomes","citation packet precedent"],"rowCount":4,"firstDate":"2012-03-07","lastDate":"2012-12-21","metrics":{"appeals":0,"decisions":4,"recentRows":0,"decisionPenalty":1298,"originalPenalty":1676},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"86358","VIOLATION_NO":"8270760","DOCKET_NO":"KENT 2012-941","DECISION_DT":"12/21/2012","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"634.00","DECISION_PENALTY_AMT":"450.00","JUDGE_FIRST_NAME":"Margaret","JUDGE_LAST_NAME":"Miller","sourceDate":"2012-12-21"},{"SOURCE_ROW_NUMBER":"83927","VIOLATION_NO":"8263617","DOCKET_NO":"KENT 2012-648","DECISION_DT":"12/19/2012","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"343.00","DECISION_PENALTY_AMT":"258.00","JUDGE_FIRST_NAME":"Margaret","JUDGE_LAST_NAME":"Miller","sourceDate":"2012-12-19"},{"SOURCE_ROW_NUMBER":"83926","VIOLATION_NO":"8263616","DOCKET_NO":"KENT 2012-648","DECISION_DT":"12/19/2012","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"436.00","DECISION_PENALTY_AMT":"327.00","JUDGE_FIRST_NAME":"Margaret","JUDGE_LAST_NAME":"Miller","sourceDate":"2012-12-19"},{"SOURCE_ROW_NUMBER":"72326","VIOLATION_NO":"8244879","DOCKET_NO":"KENT 2011-962","DECISION_DT":"03/07/2012","DECISION_TYPE_CODE_DESC":"Dismissal","ORIGINAL_PENALTY_AMT":"263.00","DECISION_PENALTY_AMT":"263.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2012-03-07"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":107,"firstDate":"2010-10-28","lastDate":"2012-06-01","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":22,"validSamples":85,"maxConcentration":5.459,"concentrationTotal":44.494},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1248514","CASS_NUM":"51159141","SMP_TAKEN_DT":"6/1/2012","CONC":"0","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"INVALID PRODUCTION","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-06-01"},{"SOURCE_ROW_NUMBER":"191512","CASS_NUM":"51159123","SMP_TAKEN_DT":"5/31/2012","CONC":".14","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-05-31"},{"SOURCE_ROW_NUMBER":"1259801","CASS_NUM":"51159717","SMP_TAKEN_DT":"5/30/2012","CONC":"1.111","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-05-30"},{"SOURCE_ROW_NUMBER":"930845","CASS_NUM":"51159383","SMP_TAKEN_DT":"5/30/2012","CONC":".253","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-05-30"},{"SOURCE_ROW_NUMBER":"991631","CASS_NUM":"51159118","SMP_TAKEN_DT":"5/29/2012","CONC":".245","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-05-29"},{"SOURCE_ROW_NUMBER":"1479905","CASS_NUM":"51176229","SMP_TAKEN_DT":"5/21/2012","CONC":".248","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-05-21"},{"SOURCE_ROW_NUMBER":"764635","CASS_NUM":"51176257","SMP_TAKEN_DT":"5/8/2012","CONC":".163","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"Miner is not active with QnC","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-05-08"},{"SOURCE_ROW_NUMBER":"1432573","CASS_NUM":"57944827","SMP_TAKEN_DT":"4/11/2012","CONC":".254","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-04-11"},{"SOURCE_ROW_NUMBER":"827136","CASS_NUM":"57945045","SMP_TAKEN_DT":"4/11/2012","CONC":".586","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-04-11"},{"SOURCE_ROW_NUMBER":"245208","CASS_NUM":"57945028","SMP_TAKEN_DT":"4/11/2012","CONC":"1.167","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-04-11"},{"SOURCE_ROW_NUMBER":"172679","CASS_NUM":"57944969","SMP_TAKEN_DT":"4/11/2012","CONC":".079","SMP_TYPE_CD_DESC":"INTAKE AIR","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-04-11"},{"SOURCE_ROW_NUMBER":"72296","CASS_NUM":"57945024","SMP_TAKEN_DT":"4/11/2012","CONC":".626","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SCOOP CAR OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2012-04-11"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":1,"firstDate":"2011-06-27","lastDate":"2011-06-27","metrics":{"linkedIssuances":1},"periods":{},"recentRecords":[]},{"id":"msha-contested-violations","name":"Contested Violations","domains":["compliance","legal"],"products":["contest status","time to resolution","contested-rate context"],"rowCount":4,"firstDate":"2011-03-02","lastDate":"2012-01-12","metrics":{"decisions":4,"ssChanged":1,"recentRows":0,"decisionPenalty":1298,"proposedPenalty":1676},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"139604","CITATION_NO":"8270760","CITATION_ISSUE_DT":"01/12/2012","DOCKET_NO":"KENT 2012-941","DECISION_DT":"12/21/2012","CFR_STANDARD_CODE":"75.220(a)(1)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"634.00","DECISION_PENALTY_AMT":"450.00","sourceDate":"2012-01-12"},{"SOURCE_ROW_NUMBER":"371785","CITATION_NO":"8263617","CITATION_ISSUE_DT":"12/20/2011","DOCKET_NO":"KENT 2012-648","DECISION_DT":"12/19/2012","CFR_STANDARD_CODE":"48.26(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"343.00","DECISION_PENALTY_AMT":"258.00","sourceDate":"2011-12-20"},{"SOURCE_ROW_NUMBER":"26108","CITATION_NO":"8263616","CITATION_ISSUE_DT":"12/20/2011","DOCKET_NO":"KENT 2012-648","DECISION_DT":"12/19/2012","CFR_STANDARD_CODE":"48.6(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"436.00","DECISION_PENALTY_AMT":"327.00","sourceDate":"2011-12-20"},{"SOURCE_ROW_NUMBER":"308276","CITATION_NO":"8244879","CITATION_ISSUE_DT":"03/02/2011","DOCKET_NO":"KENT 2011-962","DECISION_DT":"03/07/2012","CFR_STANDARD_CODE":"77.410(b)","ORIGINAL_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"263.00","DECISION_PENALTY_AMT":"263.00","sourceDate":"2011-03-02"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":141,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":2,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":32,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":2,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":3,"firstDate":"2010-09-01","lastDate":"2010-09-01","metrics":{"recentRows":0,"currentOperatorTenures":3,"completedOperatorTenures":0},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":35,"firstDate":"2010-09-02","lastDate":"2012-12-03","metrics":{"inspectors":58,"recentRows":0,"onSiteHours":999,"inspectionHours":1511.75,"inspectionSamples":137},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1035198","EVENT_NO":"6388545","INSPECTION_BEGIN_DT":"12/03/2012","INSPECTION_END_DT":"12/03/2012","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"4","SUM_TOTAL_ON_SITE_HOURS":"0","sourceDate":"2012-12-03"},{"SOURCE_ROW_NUMBER":"857857","EVENT_NO":"6388688","INSPECTION_BEGIN_DT":"07/03/2012","INSPECTION_END_DT":"08/23/2012","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"43.5","SUM_TOTAL_ON_SITE_HOURS":"26","sourceDate":"2012-07-03"},{"SOURCE_ROW_NUMBER":"713590","EVENT_NO":"6392958","INSPECTION_BEGIN_DT":"05/31/2012","INSPECTION_END_DT":"06/11/2012","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"40","SUM_TOTAL_ON_SITE_HOURS":"19","sourceDate":"2012-05-31"},{"SOURCE_ROW_NUMBER":"1126956","EVENT_NO":"6392171","INSPECTION_BEGIN_DT":"04/30/2012","INSPECTION_END_DT":"04/30/2012","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"5.5","sourceDate":"2012-04-30"},{"SOURCE_ROW_NUMBER":"264742","EVENT_NO":"6392170","INSPECTION_BEGIN_DT":"04/26/2012","INSPECTION_END_DT":"04/26/2012","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"5.5","sourceDate":"2012-04-26"},{"SOURCE_ROW_NUMBER":"236812","EVENT_NO":"6388532","INSPECTION_BEGIN_DT":"04/02/2012","INSPECTION_END_DT":"06/24/2012","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"8","SUM_TOTAL_INSP_HOURS":"233.5","SUM_TOTAL_ON_SITE_HOURS":"162.75","sourceDate":"2012-04-02"},{"SOURCE_ROW_NUMBER":"876228","EVENT_NO":"6392164","INSPECTION_BEGIN_DT":"03/30/2012","INSPECTION_END_DT":"04/03/2012","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"18","SUM_TOTAL_ON_SITE_HOURS":"11","sourceDate":"2012-03-30"},{"SOURCE_ROW_NUMBER":"6437","EVENT_NO":"6392303","INSPECTION_BEGIN_DT":"03/15/2012","INSPECTION_END_DT":"03/28/2012","ACTIVITY_CODE":"E21","ACTIVITY":"Ventilation Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"18","SUM_TOTAL_ON_SITE_HOURS":"9.5","sourceDate":"2012-03-15"},{"SOURCE_ROW_NUMBER":"509005","EVENT_NO":"4203722","INSPECTION_BEGIN_DT":"03/14/2012","INSPECTION_END_DT":"03/14/2012","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7.5","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2012-03-14"},{"SOURCE_ROW_NUMBER":"5506","EVENT_NO":"4203713","INSPECTION_BEGIN_DT":"02/23/2012","INSPECTION_END_DT":"02/23/2012","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2012-02-23"},{"SOURCE_ROW_NUMBER":"435776","EVENT_NO":"4191985","INSPECTION_BEGIN_DT":"01/03/2012","INSPECTION_END_DT":"03/28/2012","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"4","SUM_TOTAL_INSP_HOURS":"209","SUM_TOTAL_ON_SITE_HOURS":"133.5","sourceDate":"2012-01-03"},{"SOURCE_ROW_NUMBER":"2848","EVENT_NO":"6388244","INSPECTION_BEGIN_DT":"12/13/2011","INSPECTION_END_DT":"01/09/2012","ACTIVITY_CODE":"E22","ACTIVITY":"Health Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"14.5","SUM_TOTAL_ON_SITE_HOURS":"6.5","sourceDate":"2011-12-13"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":27,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2012-Q4":{"hours":0,"employees":0,"production":0},"2012-Q3":{"hours":3922,"employees":19,"production":0},"2012-Q2":{"hours":16062,"employees":41,"production":43553},"2012-Q1":{"hours":23723,"employees":46,"production":91173},"2011-Q4":{"hours":19248,"employees":31,"production":70277},"2011-Q3":{"hours":16679,"employees":31,"production":80389},"2011-Q2":{"hours":19171,"employees":50,"production":48896},"2011-Q1":{"hours":2382,"employees":26,"production":6600},"2010-Q4":{"hours":0,"employees":0,"production":0}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":4,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2011":{"hours":57480,"employees":34,"production":206162},"2012":{"hours":43707,"employees":35,"production":134726}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":21,"firstDate":"2010-10-28","lastDate":"2012-02-23","metrics":{"recentRows":0,"doseOver100":1,"actDoseTotal":1147,"pelDoseTotal":830},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"107947","EVENT_NO":"4191985","SURVEY_DATE":"02/23/2012","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"40","PEL_DOSE_90":"29","SURVEY_TYPE":"I","sourceDate":"2012-02-23"},{"SOURCE_ROW_NUMBER":"107946","EVENT_NO":"4191985","SURVEY_DATE":"02/23/2012","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"43","PEL_DOSE_90":"31","SURVEY_TYPE":"I","sourceDate":"2012-02-23"},{"SOURCE_ROW_NUMBER":"107945","EVENT_NO":"4191985","SURVEY_DATE":"02/23/2012","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"42","PEL_DOSE_90":"28","SURVEY_TYPE":"I","sourceDate":"2012-02-23"},{"SOURCE_ROW_NUMBER":"107944","EVENT_NO":"4191985","SURVEY_DATE":"02/23/2012","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"68","PEL_DOSE_90":"36","SURVEY_TYPE":"I","sourceDate":"2012-02-23"},{"SOURCE_ROW_NUMBER":"107943","EVENT_NO":"4191985","SURVEY_DATE":"02/23/2012","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"48","PEL_DOSE_90":"2","SURVEY_TYPE":"I","sourceDate":"2012-02-23"},{"SOURCE_ROW_NUMBER":"107942","EVENT_NO":"4191985","SURVEY_DATE":"02/23/2012","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"119","ACT_DOSE_85":"23","PEL_DOSE_90":"19","SURVEY_TYPE":"I","sourceDate":"2012-02-23"},{"SOURCE_ROW_NUMBER":"107941","EVENT_NO":"4191985","SURVEY_DATE":"02/02/2012","OCCUPATION_CD_DESC":"SUPERINTENDENT","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"2","PEL_DOSE_90":"1","SURVEY_TYPE":"I","sourceDate":"2012-02-02"},{"SOURCE_ROW_NUMBER":"107940","EVENT_NO":"4191985","SURVEY_DATE":"02/02/2012","OCCUPATION_CD_DESC":"UTILITY MAN","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"2","PEL_DOSE_90":"1","SURVEY_TYPE":"I","sourceDate":"2012-02-02"},{"SOURCE_ROW_NUMBER":"107960","EVENT_NO":"6388519","SURVEY_DATE":"08/02/2011","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"81","PEL_DOSE_90":"80","SURVEY_TYPE":"I","sourceDate":"2011-08-02"},{"SOURCE_ROW_NUMBER":"107959","EVENT_NO":"6388519","SURVEY_DATE":"08/02/2011","OCCUPATION_CD_DESC":"MINE FOREMAN/MINE MANAGER","MACHINE_CD":"40","MANUFACTURER_CD":"039","ACT_DOSE_85":"81","PEL_DOSE_90":"80","SURVEY_TYPE":"I","sourceDate":"2011-08-02"},{"SOURCE_ROW_NUMBER":"107958","EVENT_NO":"6388519","SURVEY_DATE":"08/02/2011","OCCUPATION_CD_DESC":"ELECTRICIAN","MACHINE_CD":"40","MANUFACTURER_CD":"120","ACT_DOSE_85":"29","PEL_DOSE_90":"11","SURVEY_TYPE":"I","sourceDate":"2011-08-02"},{"SOURCE_ROW_NUMBER":"107957","EVENT_NO":"6388519","SURVEY_DATE":"08/02/2011","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"60","PEL_DOSE_90":"55","SURVEY_TYPE":"I","sourceDate":"2011-08-02"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":9,"firstDate":"2011-03-16","lastDate":"2012-04-11","metrics":{"recentRows":0,"voidSamples":2,"maxQuartzPct":12.5,"validSamples":7,"quartzPctTotal":56.5},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"135196","CASSETTE_NO":"57945028","SAMPLE_DT":"04/11/2012","QUARTZ_PCT":"03.5","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2012-04-11"},{"SOURCE_ROW_NUMBER":"12319","CASSETTE_NO":"57943209","SAMPLE_DT":"01/25/2012","QUARTZ_PCT":"09.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2012-01-25"},{"SOURCE_ROW_NUMBER":"130783","CASSETTE_NO":"51091253","SAMPLE_DT":"08/30/2011","QUARTZ_PCT":"12.2","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2011-08-30"},{"SOURCE_ROW_NUMBER":"16061","CASSETTE_NO":"57898455","SAMPLE_DT":"08/02/2011","QUARTZ_PCT":"12.5","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2011-08-02"},{"SOURCE_ROW_NUMBER":"37916","CASSETTE_NO":"51096189","SAMPLE_DT":"06/29/2011","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"INSUFFICIENT WEIGHT GAIN","sourceDate":"2011-06-29"},{"SOURCE_ROW_NUMBER":"46966","CASSETTE_NO":"57898629","SAMPLE_DT":"06/07/2011","QUARTZ_PCT":"06.3","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2011-06-07"},{"SOURCE_ROW_NUMBER":"34239","CASSETTE_NO":"57898588","SAMPLE_DT":"06/07/2011","QUARTZ_PCT":"06.7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2011-06-07"},{"SOURCE_ROW_NUMBER":"6016","CASSETTE_NO":"51096269","SAMPLE_DT":"04/20/2011","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"INSUFFICIENT WEIGHT GAIN","sourceDate":"2011-04-20"},{"SOURCE_ROW_NUMBER":"49087","CASSETTE_NO":"57919749","SAMPLE_DT":"03/16/2011","QUARTZ_PCT":"06.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2011-03-16"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":121,"firstDate":"2010-10-26","lastDate":"2012-06-08","metrics":{"ss":42,"amountDue":36643,"contested":0,"amountPaid":36643,"recentRows":0,"section104d":0,"unterminated":1,"proposedPenalty":37021},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1177684","VIOLATION_NO":"8271295","VIOLATION_ISSUE_DT":"06/08/2012","SIG_SUB":"N","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/08/2012","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2012-06-08"},{"SOURCE_ROW_NUMBER":"1177683","VIOLATION_NO":"8271293","VIOLATION_ISSUE_DT":"06/04/2012","SIG_SUB":"N","PART_SECTION":"75.403","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/06/2012","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2012-06-04"},{"SOURCE_ROW_NUMBER":"1177721","VIOLATION_NO":"8264034","VIOLATION_ISSUE_DT":"05/31/2012","SIG_SUB":"Y","PART_SECTION":"75.380(g)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/01/2012","PROPOSED_PENALTY":"425","AMOUNT_DUE":"425","AMOUNT_PAID":"425","CONTESTED_IND":"N","sourceDate":"2012-05-31"},{"SOURCE_ROW_NUMBER":"1177720","VIOLATION_NO":"8264033","VIOLATION_ISSUE_DT":"05/31/2012","SIG_SUB":"Y","PART_SECTION":"75.202(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/11/2012","PROPOSED_PENALTY":"634","AMOUNT_DUE":"634","AMOUNT_PAID":"634","CONTESTED_IND":"N","sourceDate":"2012-05-31"},{"SOURCE_ROW_NUMBER":"1177719","VIOLATION_NO":"8264032","VIOLATION_ISSUE_DT":"05/31/2012","CIT_ORD_SAFE":"Order","NO_AFFECTED":"0","TERMINATION_DT":"06/01/2012","CONTESTED_IND":"N","sourceDate":"2012-05-31"},{"SOURCE_ROW_NUMBER":"1177688","VIOLATION_NO":"8274511","VIOLATION_ISSUE_DT":"05/23/2012","SIG_SUB":"N","PART_SECTION":"75.1103-5","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/23/2012","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1177687","VIOLATION_NO":"8274510","VIOLATION_ISSUE_DT":"05/23/2012","SIG_SUB":"N","PART_SECTION":"48.29","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/23/2012","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1177686","VIOLATION_NO":"8274509","VIOLATION_ISSUE_DT":"05/23/2012","SIG_SUB":"N","PART_SECTION":"75.1502","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"5","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/08/2012","PROPOSED_PENALTY":"127","AMOUNT_DUE":"127","AMOUNT_PAID":"127","CONTESTED_IND":"N","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1177685","VIOLATION_NO":"8274508","VIOLATION_ISSUE_DT":"05/23/2012","SIG_SUB":"N","PART_SECTION":"75.1502","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/30/2012","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1177682","VIOLATION_NO":"8271290","VIOLATION_ISSUE_DT":"05/23/2012","SIG_SUB":"N","PART_SECTION":"75.333(e)(1)(ii)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/24/2012","PROPOSED_PENALTY":"108","AMOUNT_DUE":"108","AMOUNT_PAID":"108","CONTESTED_IND":"N","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1177681","VIOLATION_NO":"8271289","VIOLATION_ISSUE_DT":"05/23/2012","SIG_SUB":"N","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/24/2012","PROPOSED_PENALTY":"108","AMOUNT_DUE":"108","AMOUNT_PAID":"108","CONTESTED_IND":"N","sourceDate":"2012-05-23"},{"SOURCE_ROW_NUMBER":"1177680","VIOLATION_NO":"8271288","VIOLATION_ISSUE_DT":"05/23/2012","SIG_SUB":"Y","PART_SECTION":"75.1100-2(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"8","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/24/2012","PROPOSED_PENALTY":"1530","AMOUNT_DUE":"1530","AMOUNT_PAID":"1530","CONTESTED_IND":"N","sourceDate":"2012-05-23"}]}],"safety":{"href":"/api/v1/mines/1519531/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/1519531/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.517","heading":"Power wires and cables; insulation and protection.","id":"75.517","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.517","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nPower wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately and fully protected.","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.403","heading":"Maintenance of incombustible content of rock dust.","id":"75.403","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.403","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Where rock dust is required to be applied, it shall be distributed upon the top, floor, and sides of all underground areas of a coal mine and maintained in such quantities that the incombustible content of the combined coal dust, rock dust, and other dust shall be not less than 80 percent. Where methane is present in any ventilating current, the percent of incombustible content of such combined dust shall be increased 0.4 percent for each 0.1 percent of methane.\n\n[75 FR 57857, Sept. 23, 2010; 76 FR 35978, June 21, 2011]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.380","heading":"Escapeways; bituminous and lignite mines.","id":"75.380","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.380","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) Except in situations addressed in § 75.381, § 75.385 and § 75.386, at least two separate and distinct travelable passageways shall be designated as escapeways and shall meet the requirements of this section.\n\n(b) (1) Escapeways shall be provided from each working section, and each area where mechanized mining equipment is being installed or removed, continuous to the surface escape drift opening or continuous to the escape shaft or slope facilities to the surface.\n\n(2) During equipment installation, these escapeways shall begin at the projected location for the section loading point. During equipment removal, they shall begin at the location of the last loading point.\n\n(c) The two separate and distinct escapeways required by this section shall not end at a common shaft, slope, or drift opening, except that multiple compartment shafts or slopes separated by walls constructed of noncombustible material may be used as separate and distinct passageways.\n\n(d) Each escapeway shall be—\n\n(1) Maintained in a safe condition to always assure passage of anyone, including disabled persons;\n\n(2) Clearly marked to show the route and direction of travel to the surface;\n\n(3) Maintained to at least a height of 5 feet from the mine floor to the mine roof, excluding the thickness of any roof support, except that the escapeways shall be maintained to at least the height of the coalbed, excluding the thickness of any roof support, where the coalbed is less than 5 feet. In areas of mines where escapeways pass through doors, the height may be less than 5 feet, provided that sufficient height is maintained to enable miners, including disabled persons, to escape quickly in an emergency. In areas of mines developed before November 16, 1992, where escapeways pass over or under overcasts or undercasts, the height may be less than 5 feet provided that sufficient height is maintained to enable miners, including disabled persons, to escape quickly in an emergency. When there is a need to determine whether sufficient height is provided, MSHA may require a stretcher test where 4 persons carry a miner through the area in question on a stretcher;\n\n(4) Maintained at least 6 feet wide except—\n\n(i) Where necessary supplemental roof support is installed, the escapeway shall not be less than 4 feet wide; or\n\n(ii) Where the route of travel passes through doors or other permanent ventilation controls, the escapeway shall be at least 4 feet wide to enable miners to escape quickly in an emergency, or\n\n(iii) Where the alternate escapeway passes through doors or other permanent ventilation controls or where supplemental roof support is required and sufficient width is maintained to enable miners, including disabled persons, to escape quickly in an emergency. When there is a need to determine whether sufficient width is provided, MSHA may require a stretcher test where 4 persons carry a miner through the area in question on a stretcher, or\n\n(iv) Where mobile equipment near working sections, and other equipment essential to the ongoing operation of longwall sections, is necessary during normal mining operations, such as material cars containing rock dust or roof control supplies, or is to be used for the evacuation of miners off the section in the event of an emergency. In any instance, escapeways shall be of sufficient width to enable miners, including disabled persons, to escape quickly in an emergency. When there is a need to determine whether sufficient width is provided, MSHA may require a stretcher test where 4 persons carry a miner through the area in question on a stretcher;\n\n(5) Located to follow the most direct, safe and practical route to the nearest mine opening suitable for the safe evacuation of miners; and\n\n(6) Provided with ladders, stairways, ramps, or similar facilities where the escapeways cross over obstructions.\n\n(7) Provided with a continuous, durable directional lifeline or equivalent device that shall be—\n\n(i) Installed and maintained throughout the entire length of each escapeway as defined in paragraph (b)(1) of this section;\n\n(ii) Flame-resistant in accordance with the requirements of part 18 of this chapter upon replacement of existing lifelines; but in no case later than June 15, 2009;\n\n(iii) Marked with a reflective material every 25 feet;\n\n(iv) Located in such a manner for miners to use effectively to escape;\n\n(v) Equipped with one directional indicator cone securely attached to the lifeline, signifying the route of escape, placed at intervals not exceeding 100 feet. Cones shall be installed so that the tapered section points inby;\n\n(vi) Equipped with one sphere securely attached to the lifeline at each intersection where personnel doors are installed in adjacent crosscuts;\n\n(vii) Equipped with two securely attached cones, installed consecutively with the tapered section pointing inby, to signify an attached branch line is immediately ahead.\n\n(A) A branch line leading from the lifeline to an SCSR cache will be marked with four cones with the base sections in contact to form two diamond shapes. The cones must be placed within reach of the lifeline.\n\n(B) A branch line leading from the lifeline to a refuge alternative will be marked with a rigid spiraled coil at least eight inches in length. The spiraled coil must be placed within reach of the lifeline (see Illustration 1 below).\n\n(e) Surface openings shall be adequately protected to prevent surface fires, fumes, smoke, and flood water from entering the mine.\n\n(f) Primary escapeway. (1) One escapeway that is ventilated with intake air shall be designated as the primary escapeway. The primary escapeway shall have a higher ventilation pressure than the belt entry unless the mine operator submits an alternative in the mine ventilation plan to protect the integrity of the primary escapeway, based on mine specific conditions, which is approved by the district manager.\n\n(2) Paragraphs (f)(3) through (f)(7) of this section apply as follows:\n\n(i) To all areas of a primary escapeway developed on or after November 16, 1992;\n\n(ii) Effective as of June 10, 1997, to all areas of a primary escapeway developed between March 30, 1970 and November 16, 1992; and\n\n(iii) Effective as of June 10, 1997, to all areas of the primary escapeway developed prior to March 30, 1970 where separation of the belt and trolley haulage entries from the primary escapeway existed prior to November 16, 1992.\n\n(3) The following equipment is not permitted in the primary escapeway:\n\n(i) Mobile equipment hauling coal except for hauling coal incidental to cleanup or maintenance of the primary escapeway.\n\n(ii) Compressors, except—\n\n(A) Compressors necessary to maintain the escapeway in safe, travelable condition;\n\n(B) Compressors that are components of equipment such as locomotives and rock dusting machines; and\n\n(C) Compressors of less than five horsepower.\n\n(iii) Underground transformer stations, battery charging stations, substations, and rectifiers except—\n\n(A) Where necessary to maintain the escapeway in safe, travelable condition; and\n\n(B) Battery charging stations and rectifiers and power centers with transformers that are either dry-type or contain nonflammable liquid, provided they are located on or near a working section and are moved as the section advances or retreats.\n\n(iv) Water pumps, except—\n\n(A) Water pumps necessary to maintain the escapeway in safe, travelable condition;\n\n(B) Submersible pumps;\n\n(C) Permissible pumps and associated permissible switchgear;\n\n(D) Pumps located on or near a working section that are moved as the section advances or retreats;\n\n(E) Pumps installed in anthracite mines; and\n\n(F) Small portable pumps.\n\n(4) Mobile equipment operated in the primary escapeway, except for continuous miners and as provided in paragraphs (f)(5), (f)(6), and (f)(7) of this section, shall be equipped with a fire suppression system installed according to §§ 75.1107-3 through 75.1107-16 that is—\n\n(i) Manually operated and attended continuously by a person trained in the systems function and use, or\n\n(ii) A multipurpose dry chemical type capable of both automatic and manual activation.\n\n(5) Personnel carriers and small mobile equipment designed and used only for carrying people and small hand tools may be operated in primary escapeways if—\n\n(i) The equipment is provided with a multipurpose dry chemical type fire suppression system capable of both automatic and manual activation, and the suppression system is suitable for the intended application and is listed or approved by a nationally recognized independent testing laboratory, or,\n\n(ii) Battery powered and provided with two 10 pound multipurpose dry chemical portable fire extinguishers.\n\n(6) Notwithstanding the requirements of paragraph (f)(3)(i), mobile equipment not provided with a fire suppression system may operate in the primary escapeway if no one is inby except those persons directly engaged in using or moving the equipment.\n\n(7) Notwithstanding the requirements of paragraph (f)(3)(i), mobile equipment designated and used only as emergency vehicles or ambulances, may be operated in the primary escapeway without fire suppression systems.\n\n(g) Except where separation of belt and trolley haulage entries from designated escapeways did not exist before November 15, 1992, and except as provided in § 75.350(c), the primary escapeway must be separated from belt and trolley haulage entries for its entire length, to and including the first connecting crosscut outby each loading point except when a greater or lesser distance for this separation is specified and approved in the mine ventilation plan and does not pose a hazard to miners.\n\n(h) Alternate escapeway. One escapeway shall be designated as the alternate escapeway. The alternate escapeway shall be separated from the primary escapeway for its entire length, except that the alternate and primary escapeways may be ventilated from a common intake air shaft or slope opening.\n\n(i) Mechanical escape facilities shall be provided and maintained for—\n\n(1) Each shaft that is part of a designated escapeway and is greater than 50 feet in depth; and\n\n(2) Each slope from the coal seam to the surface that is part of a designated escapeway and is inclined more than 9 degrees from the horizontal.\n\n(j) Within 30 minutes after mine personnel on the surface have been notified of an emergency requiring evacuation, mechanical escape facilities provided under paragraph (i) of this section shall be operational at the bottom of shaft and slope openings that are part of escapeways.\n\n(k) Except where automatically activated hoisting equipment is used, the bottom of each shaft or slope opening that is part of a designated escapeway shall be equipped with a means of signaling a surface location where a person is always on duty when anyone is underground. When the signal is activated or the evacuation of persons underground is necessary, the person shall assure that mechanical escape facilities are operational as required by paragraph (j) of this section.\n\n(l)(1) Stairways or mechanical escape facilities shall be installed in shafts that are part of the designated escapeways and that are 50 feet or less in depth, except ladders may be used in shafts that are part of the designated escapeways and that are 5 feet or less in depth.\n\n(2) Stairways shall be constructed of concrete or metal, set on an angle not to exceed 45 degrees from the horizontal, and equipped on the open side with handrails. In addition, landing platforms that are at least 2 feet by 4 feet shall be installed at intervals not to exceed 20 vertical feet on the stairways and equipped on the open side with handrails.\n\n(3) Ladders shall be constructed of metal, anchored securely, and set on an angle not to exceed 60 degrees from the horizontal.\n\n(m) A travelway designed to prevent slippage shall be provided in slope and drift openings that are part of designated escapeways, unless mechanical escape facilities are installed.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 69 FR 17530, Apr. 2, 2004; 71 FR 12269, Mar. 9, 2006; 71 FR 71452, Dec. 8, 2006; 73 FR 80613, Dec. 31, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.202","heading":"Protection from falls of roof, face and ribs.","id":"75.202","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.202","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"C","subpartHeading":"Subpart C—Roof Support","text":"(a) The roof, face and ribs of areas where persons work or travel shall be supported or otherwise controlled to protect persons from hazards related to falls of the roof, face or ribs and coal or rock bursts.\n\n(b) No person shall work or travel under unsupported roof unless in accordance with this subpart.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1103-5","heading":"Automatic fire warning devices; actions and response.","id":"75.1103-5","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1103-5","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) When the carbon monoxide level reaches 10 parts per million above the established ambient level at any sensor location, automatic fire sensor and warning device systems shall provide an effective warning signal at the following locations:\n\n(1) At working sections and other work locations where miners may be endangered from a fire in the belt entry.\n\n(2) At a manned surface location where personnel have an assigned post of duty. The manned surface location must have:\n\n(i) A telephone or equivalent communication with all miners who may be endangered and\n\n(ii) A map or schematic that shows the locations of sensors, and the intended air flow direction at these locations. This map or schematic must be updated within 24 hours of any change in this information.\n\n(3) The automatic fire sensor and warning device system shall be monitored for a period of 4 hours after the belt is stopped, unless an examination for hot rollers and fire is made as prescribed in § 75.1103-4(e).\n\n(b) The fire sensor and warning device system shall include a means for rapid evaluation of electrical short and open circuits, ground faults, pneumatic leaks, or other defect detrimental to its proper operational condition.\n\n(c) Automatic fire sensor and warning devices shall include a manual reset feature.\n\n(d) When a malfunction or warning signal is received at the manned surface location, the sensors that are activated must be identified and appropriate personnel immediately notified.\n\n(e) Upon notification of a malfunction or warning signal, appropriate personnel must immediately initiate an investigation to determine the cause of the malfunction or warning signal and take the required actions set forth in paragraph (f) of this section.\n\n(f) If any sensor indicates a warning, the following actions must be taken unless the mine operator determines that the signal does not present a hazard to miners:\n\n(1) Appropriate personnel must notify miners in affected working sections, in affected areas where mechanized mining equipment is being installed or removed, and at other locations specified in the approved mine emergency evacuation and firefighting program of instruction; and\n\n(2) All miners in the affected areas, unless assigned emergency response duties, must be immediately withdrawn to a safe location identified in the mine emergency evacuation and firefighting program of instruction.\n\n(g) If the warning signal will be activated during calibration of sensors, personnel manning the surface location must be notified prior to and upon completion of calibration. Affected working sections, areas where mechanized mining equipment is being installed or removed, or other areas designated in the approved emergency evacuation and firefighting program of instruction must be notified at the beginning and completion of calibration.\n\n(h) If any fire detection component becomes inoperative, immediate action must be taken to repair the component. While repairs are being made, operation of the belt may continue if the following requirements are met:\n\n(1) If one sensor becomes inoperative, a trained person must continuously monitor for carbon monoxide at the inoperative sensor;\n\n(2) If two or more adjacent sensors become inoperative, trained persons must patrol and continuously monitor the affected areas for carbon monoxide so that they will be traveled each hour in their entirety. Alternatively, a trained person must be stationed at each inoperative sensor to monitor for carbon monoxide;\n\n(3) If the complete fire detection system becomes inoperative, trained persons must patrol and continuously monitor the affected areas for carbon monoxide so that they will be traveled each hour in their entirety;\n\n(4) Trained persons who conduct monitoring under this section must have two-way voice communication capability, at intervals not to exceed 2,000 feet, and must report carbon monoxide concentrations to the surface at intervals not to exceed one hour;\n\n(5) Trained persons who conduct monitoring under this section must immediately report to the surface any concentration of carbon monoxide that reaches 10 parts per million above the established ambient level, unless the mine operator knows that the source of the carbon monoxide does not present a hazard to miners; and\n\n(6) Handheld detectors used to monitor the belt entry under this section must have a detection level equivalent to that of the system's carbon monoxide sensors.\n\n[37 FR 16545, Aug. 16, 1972, as amended at 73 FR 80615, Dec. 31, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 48.29","heading":"Records of training.","id":"48.29","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-48/subpart-B/section-48.29","part":"48","partHeading":"PART 48—TRAINING AND RETRAINING OF MINERS","subchapter":"H","subchapterHeading":"SUBCHAPTER H—EDUCATION AND TRAINING","subpart":"B","subpartHeading":"Subpart B—Training and Retraining of Miners Working at Surface Mines and Surface Areas of Underground Mines","text":"(a) Upon a miner's completion of each MSHA approved training program, the operator shall record and certify on MSHA form 5000-23 that the miner has received the specified training. A copy of the training certificate shall be given to the miner at the completion of the training. The training certificates for each miner shall be available at the mine site for inspection by MSHA and for examination by the miners, the miners' representative and State inspection agencies. When a miner leaves the operator's employ, the miner shall be entitled to a copy of his training certificates.\n\n(b) False certification that training was given shall be punishable under section 110 (a) and (f) of the Act.\n\n(c) Copies of training certificates for currently employed miners shall be kept at the mine site for 2 years, or for 60 days after termination of employment.\n\n(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))\n\n[43 FR 47459, Oct. 13, 1978, as amended at 47 FR 14706, Apr. 6, 1982; 60 FR 33723, June 29, 1995]","occurrenceCount":1},{"chapter":"I","heading":"Mine emergency evacuation and firefighting program of instruction.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-P/section-75.1502","part":"75","subchapter":"O","subpart":"P","id":"75.1502","citation":"30 CFR 75.1502","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.333","heading":"Ventilation controls.","id":"75.333","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) For purposes of this section, “doors” include any door frames.\n\n(b) Permanent stoppings or other permanent ventilation control devices constructed after November 15, 1992, shall be built and maintained—\n\n(1) Between intake and return air courses, except temporary controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the room was developed including where continuous face haulage systems are used in such rooms. Unless otherwise approved in the ventilation plan, these stoppings or controls shall be maintained to and including the third connecting crosscut outby the working face;\n\n(2) To separate belt conveyor haulageways from return air courses, except where belt entries in areas of mines developed before March 30, 1970, are used as return air courses;\n\n(3) To separate belt conveyor haulageways from intake air courses when the air in the intake air courses is used to provide air to active working places. Temporary ventilation controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the rooms were developed including where continuous face haulage systems are used in such rooms. When continuous face haulage systems are used, permanent stoppings or other permanent ventilation control devices shall be built and maintained to the outby most point of travel of the dolly or 600 feet from the point of deepest penetration in the conveyor belt entry, whichever distance is closer to the point of deepest penetration, to separate the continuous haulage entry from the intake entries;\n\n(4) To separate the primary escapeway from belt and trolley haulage entries, as required by § 75.380(g). For the purposes of § 75.380(g), the loading point for a continuous haulage system shall be the outby most point of travel of the dolly or 600 feet from the point of deepest penetration, whichever distance is less; and\n\n(5) In return air courses to direct air into adjacent worked-out areas.\n\n(c) Personnel doors shall be constructed of noncombustible material and shall be of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between air courses, and shall be installed as follows in permanent stoppings constructed after November 15, 1992:\n\n(1) The distance between personnel doors shall be no more than 300 feet in seam heights below 48 inches and 600 feet in seam heights 48 inches or higher.\n\n(2) The location of all personnel doors in stoppings along escapeways shall be clearly marked so that the doors may be easily identified by anyone traveling in the escapeway and in the entries on either side of the doors.\n\n(3) When not in use, personnel doors shall be closed.\n\n(4) An airlock shall be established where the air pressure differential between air courses creates a static force exceeding 125 pounds on closed personnel doors along escapeways.\n\n(d) Doors, other than personnel doors, constructed after November 15, 1992, that are used in lieu of permanent stoppings or to control ventilation within an air course shall be:\n\n(1) Made of noncombustible material or coated on all accessible surfaces with flame-retardant materials having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(2) Of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between or within air courses or entries.\n\n(3) Installed in pairs to form an airlock. When an airlock is used, one side of the airlock shall remain closed. When not in use, both sides shall be closed.\n\n(e)(1)(i) Except as provided in paragraphs (e)(2), (3), and (4) of this section, all overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after June 10, 1996, shall be constructed in a traditionally accepted method and of materials that have been demonstrated to perform adequately or in a method and of materials that have been tested and shown to have a minimum strength equal to or greater than the traditionally accepted in-mine controls. Tests may be performed under ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction” (Section 12-Transverse Load-Specimen Vertical, load, only), or the operator may conduct comparative in-mine tests. In-mine tests shall be designed to demonstrate the comparative strength of the proposed construction and a traditionally accepted in-mine control. The publication ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction,” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(ii) All overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after November 15, 1992, shall be constructed of noncombustible material. Materials that are suitable for the construction of overcasts, undercasts, shaft partitions, permanent stoppings, and regulators include concrete, concrete block, brick, cinder block, tile, or steel. No ventilation controls installed after November 15, 1992, shall be constructed of aluminum.\n\n(2) In anthracite mines, permanent stoppings may be constructed of overlapping layers of hardwood mine boards, if the stoppings are a minimum 2 inches thick.\n\n(3) When timbers are used to create permanent stoppings in heaving or caving areas, the stoppings shall be coated on all accessible surfaces with a flame-retardant material having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(4) In anthracite mines, doors and regulators may be constructed of overlapping layers of hardwood boards, if the doors, door frames, and regulators are a minimum 2 inches thick.\n\n(f) When sealants are applied to ventilation controls, the sealant shall have a flame-spread index of 25 or less under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(g) Before mining is discontinued in an entry or room that is advanced more than 20 feet from the inby rib, a crosscut shall be made or line brattice shall be installed and maintained to provide adequate ventilation. When conditions such as methane liberation warrant a distance less than 20 feet, the approved ventilation plan shall specify the location of such rooms or entries and the maximum distance they will be developed before a crosscut is made or line brattice is installed.\n\n(h) All ventilation controls, including seals, shall be maintained to serve the purpose for which they were built.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996; 61 FR 26442, May 28, 1996; 61 FR 29288, 29289, June 10, 1996, as amended at 67 FR 38386, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 73 FR 80612, Dec. 31, 2008; 80 FR 52991, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1100-2","heading":"Quantity and location of firefighting equipment.","id":"75.1100-2","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-2","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Working sections. (1) Each working section of coal mines producing 300 tons or more per shift shall be provided with two portable fire extinguishers and 240 pounds of rock dust in bags or other suitable containers; waterlines shall extend to each section loading point and be equipped with enough fire hose to reach each working face unless the section loading point is provided with one of the following:\n\n(i) Two portable water cars; or\n\n(ii) Two portable chemical cars; or\n\n(iii) One portable water car or one portable chemical car, and either (a) a portable foam-generating machine or (b) a portable high-pressure rock-dusting machine fitted with at least 250 feet of hose and supplied with at least 60 sacks of rock dust.\n\n(2) Each working section of coal mines producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Two portable fire extinguishers; and\n\n(ii) 240 pounds of rock dust in bags or other suitable containers; and\n\n(iii) At least 500 gallons of water and at least three pails of 10-quart capacity; or a waterline with sufficient hose to reach the working places; or a portable water car of at least 500-gallons capacity; or a portable, all-purpose, dry-powder chemical car of at least 125-pounds capacity.\n\n(3) As an alternative to paragraph (a)(2) of this section, each working section with no electrical equipment at the face of an anthracite coal mine producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Portable fire extinguishers containing a total capacity of at least 30 pounds of dry chemical or 15 gallons of foam and located at the entrance to the gangway at the bottom of the slope; and\n\n(ii) Portable fire extinguishers containing a total capacity of at least 20 pounds of dry chemical or 10 gallons of foam and located within 500 feet from the working face.\n\n(b) Belt conveyors. In all coal mines, waterlines shall be installed parallel to the entire length of belt conveyors and shall be equipped with firehose outlets with valves at 300-foot intervals along each belt conveyor and at tailpieces. At least 500 feet of firehose with fittings suitable for connection with each belt conveyor waterline system shall be stored at strategic locations along the belt conveyor. Waterlines may be installed in entries adjacent to the conveyor entry belt as long as the outlets project into the belt conveyor entry.\n\n(c) Haulage tracks. (1) In mines producing 300 tons of coal or more per shift waterlines shall be installed parallel to all haulage tracks using mechanized equipment in the track or adjacent entry and shall extend to the loading point of each working section. Waterlines shall be equipped with outlet valves at intervals of not more than 500 feet, and 500 feet of firehose with fittings suitable for connection with such waterlines shall be provided at strategic locations. Two portable water cars, readily available, may be used in lieu of waterlines prescribed under this paragraph.\n\n(2) In mines producing less than 300 tons of coal per shift, there shall be provided at 500-foot intervals in all main and secondary haulage roads:\n\n(i) A tank of water of at least 55-gallon capacity with at least 3 pails of not less than 10-quart capacity; or\n\n(ii) Not less than 240 pounds of bagged rock dust.\n\n(d) Transportation. Each track or off-track locomotive, self-propelled man-trip car, or personnel carrier shall be equipped with one portable fire extinguisher.\n\n(e) Electrical installations. At each electrical installation, the operator shall provide two portable fire extinguishers that have a nominal capacity of 5 pounds of dry chemical, or one extinguisher that has a nominal capacity of at least 10 pounds of dry chemical, and which have a 2-A:10-B:C or higher rating.\n\n(f) Oil storage stations. Two portable fire extinguishers and 240 pounds of rock dust, shall be provided at each permanent underground oil storage station. One portable fire extinguisher shall be provided at each working section where 25 gallons or more of oil are stored in addition to extinguishers required under paragraph (a) of this section.\n\n(g) Welding, cutting, soldering. One portable fire extinguisher or 240 pounds of rock dust shall be provided at locations where welding, cutting, or soldering with arc or flame is being done.\n\n(h) Powerlines. At each wooden door through which powerlines pass there shall be one portable fire extinguisher or 240 pounds of rock dust within 25 feet of the door on the intake air side.\n\n(i) Emergency materials. (1) At each mine producing 300 tons of coal or more per shift there shall be readily available the following materials at locations not exceeding 2 miles from each working section:\n\n1,000 board feet of brattice boards 2 rolls of brattice cloth 2 hand saws 25 pounds of 8 d nails 25 pounds of 10 d nails 25 pounds of 16 d nails 3 claw hammers 25 bags of wood fiber plaster or 10 bags of cement (or equivalent material for stoppings) 5 tons of rock dust\n\n(2) At each mine producing less than 300 tons of coal per shift the above materials shall be available at the mine, provided, however, that the emergency materials for one or more mines may be stored at a central warehouse or building supply company and such supply must be the equivalent of that required for all mines involved and within 1-hour's delivery time from each mine. This exception shall not apply where the active working sections are more than 2 miles from the surface.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 53127, Sept. 15, 2008]","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"1519531","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}