{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"1519198","name":"PE 5 Underground","status":"Abandoned","status_date":"2009-06-26","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"KY","county":"Pike","nearest_town":"Myra","operator_id":"P21756","operator_name":"Premier Elkhorn Coal Company","controller_id":"0149203","controller_name":"J Mark  Campbell","district":"C05","office":"Norton VA Field Office","employees":0,"latitude":37.309444,"longitude":-82.617777},"coverage":{"contributingSources":14,"registeredSources":20,"sourceRows":335},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"1519198","name":"PE 5 Underground"},"operator":{"type":"operator","id":"P21756","name":"Premier Elkhorn Coal Company"},"controller":{"type":"controller","id":"0149203","name":"J Mark  Campbell"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C00286","name":"TECO Energy Inc"},"object":{"type":"mine","id":"1519198","name":"PE 5 Underground"},"validFrom":"1991-12-02","validTo":"2015-09-20","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519198|C00286|1991-12-02|2015-09-20"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P21756","name":"Premier Elkhorn Coal Company"},"object":{"type":"mine","id":"1519198","name":"PE 5 Underground"},"validFrom":"2008-03-11","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519198|P21756|2008-03-11|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C00286","name":"TECO Energy Inc"},"object":{"type":"operator","id":"P21756","name":"Premier Elkhorn Coal Company"},"validFrom":"2008-03-11","validTo":"2015-09-20","current":false,"derived":true,"evidenceMineId":"1519198","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519198|P21756|2008-03-11|C00286|1991-12-02|45856"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C11194","name":"James H  Booth et al"},"object":{"type":"mine","id":"1519198","name":"PE 5 Underground"},"validFrom":"2015-09-21","validTo":"2019-06-15","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519198|C11194|2015-09-21|2019-06-15"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C11194","name":"James H  Booth et al"},"object":{"type":"operator","id":"P21756","name":"Premier Elkhorn Coal Company"},"validFrom":"2015-09-21","validTo":"2019-06-15","current":false,"derived":true,"evidenceMineId":"1519198","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519198|P21756|2008-03-11|C11194|2015-09-21|84050"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0149203","name":"J Mark  Campbell"},"object":{"type":"mine","id":"1519198","name":"PE 5 Underground"},"validFrom":"2019-06-16","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519198|0149203|2019-06-16|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0149203","name":"J Mark  Campbell"},"object":{"type":"operator","id":"P21756","name":"Premier Elkhorn Coal Company"},"validFrom":"2019-06-16","validTo":null,"current":true,"derived":true,"evidenceMineId":"1519198","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1519198|P21756|2008-03-11|0149203|2019-06-16|30606"}}],"coverage":{"historyRecords":3,"edgeCount":7,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":2,"firstDate":"2009-03-01","lastDate":"2009-06-15","metrics":{"daysLost":9,"injuries":2,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"190728","DOCUMENT_NO":"220141190013","ACCIDENT_DT":"06/15/2009","DEGREE_INJURY":"OCCUPATNAL ILLNESS NOT DEG 1-6","CLASSIFICATION":"DUST DISEASE OF LUNGS","ACCIDENT_TYPE":"Inhalation of radiations, caustics, toxic and noxious substances","OCCUPATION":"Electrician, Lineman","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Pneumoconiosis - Premier Elkhorn Safety Dept. personnel were notified that the former employee had filed a claim","sourceDate":"2009-06-15"},{"SOURCE_ROW_NUMBER":"61683","DOCUMENT_NO":"220090680071","ACCIDENT_DT":"03/01/2009","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Discontinued 1/31/2014.  Several other codes cover Scoop Car Operator","NO_INJURIES":"1","DAYS_LOST":"9","NARRATIVE":"Employee was lifting a 50 lb bag of rock dust when he experienced pain in his lower back.","sourceDate":"2009-03-01"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2009-06-26","lastDate":"2009-06-26","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":80,"firstDate":"2008-05-27","lastDate":"2009-05-07","metrics":{"ss":45,"delinquent":80,"recentRows":0,"paidPenalty":22067,"proposedPenalty":22067,"currentAssessment":22067},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1004599","VIOLATION_NO":"8228267","ISSUE_DT":"05/07/2009","CFR_STANDARD_CD":"75.342(a)(4)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"190.00","CURRENT_ASSESSMENT_AMT":"190.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-05-07"},{"SOURCE_ROW_NUMBER":"1004598","VIOLATION_NO":"8228266","ISSUE_DT":"05/07/2009","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"807.00","CURRENT_ASSESSMENT_AMT":"807.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-05-07"},{"SOURCE_ROW_NUMBER":"1004597","VIOLATION_NO":"8228265","ISSUE_DT":"05/07/2009","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"807.00","CURRENT_ASSESSMENT_AMT":"807.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-05-07"},{"SOURCE_ROW_NUMBER":"1004590","VIOLATION_NO":"8227949","ISSUE_DT":"04/15/2009","CFR_STANDARD_CD":"75.503","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"162.00","CURRENT_ASSESSMENT_AMT":"162.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-04-15"},{"SOURCE_ROW_NUMBER":"1004596","VIOLATION_NO":"8228008","ISSUE_DT":"04/03/2009","CFR_STANDARD_CD":"75.1100-2(f)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1004595","VIOLATION_NO":"8228007","ISSUE_DT":"04/03/2009","CFR_STANDARD_CD":"75.360(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"1304.00","CURRENT_ASSESSMENT_AMT":"1304.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1004594","VIOLATION_NO":"8228006","ISSUE_DT":"04/03/2009","CFR_STANDARD_CD":"75.220(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1004593","VIOLATION_NO":"8228002","ISSUE_DT":"04/03/2009","CFR_STANDARD_CD":"75.606","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1004592","VIOLATION_NO":"8228001","ISSUE_DT":"04/03/2009","CFR_STANDARD_CD":"75.1100-2(d)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1004591","VIOLATION_NO":"8228000","ISSUE_DT":"04/03/2009","CFR_STANDARD_CD":"75.312(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"998428","VIOLATION_NO":"8229884","ISSUE_DT":"02/24/2009","CFR_STANDARD_CD":"75.1107","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-02-24"},{"SOURCE_ROW_NUMBER":"998427","VIOLATION_NO":"8229883","ISSUE_DT":"02/23/2009","CFR_STANDARD_CD":"75.320(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-02-23"}]},{"id":"msha-civil-penalty-dockets-decisions","name":"Civil Penalty Dockets and Decisions","domains":["compliance","legal"],"products":["docket lineage","decision outcomes","citation packet precedent"],"rowCount":2,"firstDate":"2010-08-05","lastDate":"2010-08-05","metrics":{"appeals":0,"decisions":2,"recentRows":0,"decisionPenalty":200,"originalPenalty":200},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"247613","VIOLATION_NO":"8228002","DOCKET_NO":"KENT 2009-1122","DECISION_DT":"08/05/2010","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Avram","JUDGE_LAST_NAME":"Weisberger","sourceDate":"2010-08-05"},{"SOURCE_ROW_NUMBER":"246915","VIOLATION_NO":"8228001","DOCKET_NO":"KENT 2009-1122","DECISION_DT":"08/05/2010","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Avram","JUDGE_LAST_NAME":"Weisberger","sourceDate":"2010-08-05"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":114,"firstDate":"2008-08-26","lastDate":"2009-05-12","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":16,"validSamples":98,"maxConcentration":4.548,"concentrationTotal":52.798},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"216151","CASS_NUM":"51005384","SMP_TAKEN_DT":"5/12/2009","CONC":".135","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-05-12"},{"SOURCE_ROW_NUMBER":"1287893","CASS_NUM":"51005404","SMP_TAKEN_DT":"5/8/2009","CONC":".23","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-05-08"},{"SOURCE_ROW_NUMBER":"169767","CASS_NUM":"51005385","SMP_TAKEN_DT":"5/7/2009","CONC":".242","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-05-07"},{"SOURCE_ROW_NUMBER":"525266","CASS_NUM":"51005378","SMP_TAKEN_DT":"5/5/2009","CONC":".092","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-05-05"},{"SOURCE_ROW_NUMBER":"78600","CASS_NUM":"51005387","SMP_TAKEN_DT":"5/4/2009","CONC":".074","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-05-04"},{"SOURCE_ROW_NUMBER":"1417319","CASS_NUM":"51005427","SMP_TAKEN_DT":"4/27/2009","CONC":".217","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-04-27"},{"SOURCE_ROW_NUMBER":"1379573","CASS_NUM":"57755038","SMP_TAKEN_DT":"4/15/2009","CONC":".034","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"INVALID PRODUCTION","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-04-15"},{"SOURCE_ROW_NUMBER":"1039846","CASS_NUM":"57755018","SMP_TAKEN_DT":"4/15/2009","CONC":".169","SMP_TYPE_CD_DESC":"INTAKE AIR","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"INVALID PRODUCTION","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-04-15"},{"SOURCE_ROW_NUMBER":"990581","CASS_NUM":"57755058","SMP_TAKEN_DT":"4/15/2009","CONC":".093","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"INVALID PRODUCTION","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-04-15"},{"SOURCE_ROW_NUMBER":"675991","CASS_NUM":"57754986","SMP_TAKEN_DT":"4/15/2009","CONC":".076","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"INVALID PRODUCTION","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-04-15"},{"SOURCE_ROW_NUMBER":"624741","CASS_NUM":"57755059","SMP_TAKEN_DT":"4/15/2009","CONC":".097","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"INVALID PRODUCTION","OCC_CD_DESC":"SCOOP CAR OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-04-15"},{"SOURCE_ROW_NUMBER":"624421","CASS_NUM":"57755093","SMP_TAKEN_DT":"4/15/2009","CONC":".08","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"INVALID PRODUCTION","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-04-15"}]},{"id":"msha-contested-violations","name":"Contested Violations","domains":["compliance","legal"],"products":["contest status","time to resolution","contested-rate context"],"rowCount":2,"firstDate":"2009-04-03","lastDate":"2009-04-03","metrics":{"decisions":2,"ssChanged":0,"recentRows":0,"decisionPenalty":200,"proposedPenalty":200},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"408293","CITATION_NO":"8228001","CITATION_ISSUE_DT":"04/03/2009","DOCKET_NO":"KENT 2009-1122","DECISION_DT":"08/05/2010","CFR_STANDARD_CODE":"75.1100-2(d)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"12511","CITATION_NO":"8228002","CITATION_ISSUE_DT":"04/03/2009","DOCKET_NO":"KENT 2009-1122","DECISION_DT":"08/05/2010","CFR_STANDARD_CODE":"75.606","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2009-04-03"}]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":3,"firstDate":"2008-03-11","lastDate":"2008-03-11","metrics":{"recentRows":0,"currentOperatorTenures":3,"completedOperatorTenures":0},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":9,"firstDate":"2008-04-01","lastDate":"2009-04-01","metrics":{"inspectors":28,"recentRows":0,"onSiteHours":548.5,"inspectionHours":798.75,"inspectionSamples":102},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1029527","EVENT_NO":"4196261","INSPECTION_BEGIN_DT":"04/01/2009","INSPECTION_END_DT":"04/01/2009","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"5.5","sourceDate":"2009-04-01"},{"SOURCE_ROW_NUMBER":"844504","EVENT_NO":"4183056","INSPECTION_BEGIN_DT":"04/01/2009","INSPECTION_END_DT":"06/29/2009","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"82","SUM_TOTAL_ON_SITE_HOURS":"51.25","sourceDate":"2009-04-01"},{"SOURCE_ROW_NUMBER":"1132387","EVENT_NO":"4182392","INSPECTION_BEGIN_DT":"03/31/2009","INSPECTION_END_DT":"03/31/2009","ACTIVITY_CODE":"E04","ACTIVITY":"Verbal Hazard Complaint Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"4","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2009-03-31"},{"SOURCE_ROW_NUMBER":"1074501","EVENT_NO":"4182388","INSPECTION_BEGIN_DT":"01/02/2009","INSPECTION_END_DT":"03/13/2009","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"183.75","SUM_TOTAL_ON_SITE_HOURS":"128.25","sourceDate":"2009-01-02"},{"SOURCE_ROW_NUMBER":"640913","EVENT_NO":"4182386","INSPECTION_BEGIN_DT":"10/06/2008","INSPECTION_END_DT":"12/04/2008","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"5","SUM_TOTAL_INSP_HOURS":"222.5","SUM_TOTAL_ON_SITE_HOURS":"158","sourceDate":"2008-10-06"},{"SOURCE_ROW_NUMBER":"1039311","EVENT_NO":"4193970","INSPECTION_BEGIN_DT":"09/10/2008","INSPECTION_END_DT":"09/18/2008","ACTIVITY_CODE":"E21","ACTIVITY":"Ventilation Technical Investigation","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"36","SUM_TOTAL_ON_SITE_HOURS":"25.5","sourceDate":"2008-09-10"},{"SOURCE_ROW_NUMBER":"57530","EVENT_NO":"4182412","INSPECTION_BEGIN_DT":"07/14/2008","INSPECTION_END_DT":"09/30/2008","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"148.25","SUM_TOTAL_ON_SITE_HOURS":"102.25","sourceDate":"2008-07-14"},{"SOURCE_ROW_NUMBER":"520689","EVENT_NO":"4195188","INSPECTION_BEGIN_DT":"07/07/2008","INSPECTION_END_DT":"07/07/2008","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2008-07-07"},{"SOURCE_ROW_NUMBER":"778369","EVENT_NO":"4182406","INSPECTION_BEGIN_DT":"04/01/2008","INSPECTION_END_DT":"06/16/2008","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"8","SUM_TOTAL_INSP_HOURS":"106.25","SUM_TOTAL_ON_SITE_HOURS":"71.75","sourceDate":"2008-04-01"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":9,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2009-Q2":{"hours":17641,"employees":36,"production":20333},"2009-Q1":{"hours":34985,"employees":49,"production":46047},"2008-Q4":{"hours":31945,"employees":50,"production":63364},"2008-Q3":{"hours":23255,"employees":40,"production":43949},"2008-Q2":{"hours":5365,"employees":7,"production":13249}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":4,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2008":{"hours":60565,"employees":35,"production":120562},"2009":{"hours":52626,"employees":43,"production":66380}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":12,"firstDate":"2008-09-29","lastDate":"2008-09-29","metrics":{"recentRows":0,"doseOver100":3,"actDoseTotal":853,"pelDoseTotal":630},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"97702","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"53","PEL_DOSE_90":"28","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97701","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"119","ACT_DOSE_85":"138","PEL_DOSE_90":"129","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97700","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"82","PEL_DOSE_90":"62","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97699","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"87","PEL_DOSE_90":"58","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97698","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"119","ACT_DOSE_85":"36","PEL_DOSE_90":"15","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97697","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"LABORER/BLACKSMITH","ACT_DOSE_85":"29","PEL_DOSE_90":"11","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97696","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"BELT MAN/CONVEYOR MAN","MACHINE_CD":"40","MANUFACTURER_CD":"120","ACT_DOSE_85":"7","PEL_DOSE_90":"6","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97695","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"119","PEL_DOSE_90":"96","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97694","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"119","ACT_DOSE_85":"29","PEL_DOSE_90":"24","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97693","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"65","PEL_DOSE_90":"35","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97692","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"65","PEL_DOSE_90":"35","SURVEY_TYPE":"I","sourceDate":"2008-09-29"},{"SOURCE_ROW_NUMBER":"97691","EVENT_NO":"4182412","SURVEY_DATE":"09/29/2008","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"119","ACT_DOSE_85":"143","PEL_DOSE_90":"131","SURVEY_TYPE":"I","sourceDate":"2008-09-29"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":15,"firstDate":"2008-08-26","lastDate":"2009-02-05","metrics":{"recentRows":0,"voidSamples":6,"maxQuartzPct":16.7,"validSamples":9,"quartzPctTotal":81.3},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"131907","CASSETTE_NO":"51005418","SAMPLE_DT":"02/05/2009","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"OVERSIZE PARTICLES","sourceDate":"2009-02-05"},{"SOURCE_ROW_NUMBER":"168588","CASSETTE_NO":"57756074","SAMPLE_DT":"01/14/2009","QUARTZ_PCT":"15.8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2009-01-14"},{"SOURCE_ROW_NUMBER":"76593","CASSETTE_NO":"50965810","SAMPLE_DT":"12/04/2008","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"OVERSIZE PARTICLES","sourceDate":"2008-12-04"},{"SOURCE_ROW_NUMBER":"9420","CASSETTE_NO":"50965822","SAMPLE_DT":"12/04/2008","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"OVERSIZE PARTICLES","sourceDate":"2008-12-04"},{"SOURCE_ROW_NUMBER":"30476","CASSETTE_NO":"50965845","SAMPLE_DT":"11/24/2008","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"CONTAMINATED","sourceDate":"2008-11-24"},{"SOURCE_ROW_NUMBER":"139540","CASSETTE_NO":"57745179","SAMPLE_DT":"10/22/2008","QUARTZ_PCT":"09.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"59937","CASSETTE_NO":"57745246","SAMPLE_DT":"10/16/2008","QUARTZ_PCT":"03.8","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-10-16"},{"SOURCE_ROW_NUMBER":"64562","CASSETTE_NO":"50965830","SAMPLE_DT":"10/13/2008","QUARTZ_PCT":"06.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"UNACCEPTABLE TIMEFRAME","sourceDate":"2008-10-13"},{"SOURCE_ROW_NUMBER":"31366","CASSETTE_NO":"50965805","SAMPLE_DT":"10/13/2008","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"INSUFFICIENT WEIGHT GAIN","sourceDate":"2008-10-13"},{"SOURCE_ROW_NUMBER":"143579","CASSETTE_NO":"50965853","SAMPLE_DT":"09/25/2008","QUARTZ_PCT":"00.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-09-25"},{"SOURCE_ROW_NUMBER":"103332","CASSETTE_NO":"50965847","SAMPLE_DT":"09/25/2008","QUARTZ_PCT":"01.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-09-25"},{"SOURCE_ROW_NUMBER":"136441","CASSETTE_NO":"57749106","SAMPLE_DT":"08/26/2008","QUARTZ_PCT":"14.6","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-08-26"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":81,"firstDate":"2008-05-27","lastDate":"2009-05-07","metrics":{"ss":45,"amountDue":22067,"contested":2,"amountPaid":22067,"recentRows":0,"section104d":0,"unterminated":0,"proposedPenalty":22067},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1129334","VIOLATION_NO":"8228267","VIOLATION_ISSUE_DT":"05/07/2009","SIG_SUB":"N","PART_SECTION":"75.342(a)(4)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"6","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/07/2009","PROPOSED_PENALTY":"190","AMOUNT_DUE":"190","AMOUNT_PAID":"190","CONTESTED_IND":"N","sourceDate":"2009-05-07"},{"SOURCE_ROW_NUMBER":"1129333","VIOLATION_NO":"8228266","VIOLATION_ISSUE_DT":"05/07/2009","SIG_SUB":"Y","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/11/2009","PROPOSED_PENALTY":"807","AMOUNT_DUE":"807","AMOUNT_PAID":"807","CONTESTED_IND":"N","sourceDate":"2009-05-07"},{"SOURCE_ROW_NUMBER":"1129332","VIOLATION_NO":"8228265","VIOLATION_ISSUE_DT":"05/07/2009","SIG_SUB":"Y","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/11/2009","PROPOSED_PENALTY":"807","AMOUNT_DUE":"807","AMOUNT_PAID":"807","CONTESTED_IND":"N","sourceDate":"2009-05-07"},{"SOURCE_ROW_NUMBER":"1129325","VIOLATION_NO":"8227949","VIOLATION_ISSUE_DT":"04/15/2009","SIG_SUB":"N","PART_SECTION":"75.503","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/15/2009","PROPOSED_PENALTY":"162","AMOUNT_DUE":"162","AMOUNT_PAID":"162","CONTESTED_IND":"N","sourceDate":"2009-04-15"},{"SOURCE_ROW_NUMBER":"1129331","VIOLATION_NO":"8228008","VIOLATION_ISSUE_DT":"04/03/2009","SIG_SUB":"N","PART_SECTION":"75.1100-2(f)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/07/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1129330","VIOLATION_NO":"8228007","VIOLATION_ISSUE_DT":"04/03/2009","SIG_SUB":"Y","PART_SECTION":"75.360(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"8","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/07/2009","PROPOSED_PENALTY":"1304","AMOUNT_DUE":"1304","AMOUNT_PAID":"1304","CONTESTED_IND":"N","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1129329","VIOLATION_NO":"8228006","VIOLATION_ISSUE_DT":"04/03/2009","SIG_SUB":"N","PART_SECTION":"75.220(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/03/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1129328","VIOLATION_NO":"8228002","VIOLATION_ISSUE_DT":"04/03/2009","SIG_SUB":"N","PART_SECTION":"75.606","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/07/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"Y","DOCKET_NO":"KENT 2009-1122","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1129327","VIOLATION_NO":"8228001","VIOLATION_ISSUE_DT":"04/03/2009","SIG_SUB":"N","PART_SECTION":"75.1100-2(d)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/03/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"Y","DOCKET_NO":"KENT 2009-1122","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1129326","VIOLATION_NO":"8228000","VIOLATION_ISSUE_DT":"04/03/2009","SIG_SUB":"N","PART_SECTION":"75.312(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"04/03/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-04-03"},{"SOURCE_ROW_NUMBER":"1129322","VIOLATION_NO":"8229884","VIOLATION_ISSUE_DT":"02/24/2009","SIG_SUB":"N","PART_SECTION":"75.1107","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"03/02/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-02-24"},{"SOURCE_ROW_NUMBER":"1129321","VIOLATION_NO":"8229883","VIOLATION_ISSUE_DT":"02/23/2009","SIG_SUB":"N","PART_SECTION":"75.320(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/23/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-02-23"}]}],"safety":{"href":"/api/v1/mines/1519198/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/1519198/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.342","heading":"Methane monitors.","id":"75.342","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.342","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) MSHA approved methane monitors shall be installed on all face cutting machines, continuous miners, longwall face equipment, loading machines, and other mechanized equipment used to extract or load coal within the working place.\n\n(2) The sensing device for methane monitors on longwall shearing machines shall be installed at the return air end of the longwall face. An additional sensing device also shall be installed on the longwall shearing machine, downwind and as close to the cutting head as practicable. An alternative location or locations for the sensing device required on the longwall shearing machine may be approved in the ventilation plan.\n\n(3) The sensing devices of methane monitors shall be installed as close to the working face as practicable.\n\n(4) Methane monitors shall be maintained in permissible and proper operating condition and shall be calibrated with a known air-methane mixture at least once every 31 days. To assure that methane monitors are properly maintained and calibrated, the operator shall:\n\n(i) Use persons properly trained in the maintenance, calibration, and permissibility of methane monitors to calibrate and maintain the devices.\n\n(ii) Maintain a record of all calibration tests of methane monitors. Records shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(iii) Retain the record of calibration tests for 1 year from the date of the test. Records shall be retained at a surface location at the mine and made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n(b)(1) When the methane concentration at any methane monitor reaches 1.0 percent the monitor shall give a warning signal.\n\n(2) The warning signal device of the methane monitor shall be visible to a person who can deenergize electric equipment or shut down diesel-powered equipment on which the monitor is mounted.\n\n(c) The methane monitor shall automatically deenergize electric equipment or shut down diesel-powered equipment on which it is mounted when—\n\n(1) The methane concentration at any methane monitor reaches 2.0 percent; or\n\n(2) The monitor is not operating properly.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.503","heading":"Permissible electric face equipment; maintenance.","id":"75.503","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nThe operator of each coal mine shall maintain in permissible condition all electric face equipment required by §§ 75.500, 75.501, 75.504 to be permissible which is taken into or used inby the last open crosscut of any such mine.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1100-2","heading":"Quantity and location of firefighting equipment.","id":"75.1100-2","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-2","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Working sections. (1) Each working section of coal mines producing 300 tons or more per shift shall be provided with two portable fire extinguishers and 240 pounds of rock dust in bags or other suitable containers; waterlines shall extend to each section loading point and be equipped with enough fire hose to reach each working face unless the section loading point is provided with one of the following:\n\n(i) Two portable water cars; or\n\n(ii) Two portable chemical cars; or\n\n(iii) One portable water car or one portable chemical car, and either (a) a portable foam-generating machine or (b) a portable high-pressure rock-dusting machine fitted with at least 250 feet of hose and supplied with at least 60 sacks of rock dust.\n\n(2) Each working section of coal mines producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Two portable fire extinguishers; and\n\n(ii) 240 pounds of rock dust in bags or other suitable containers; and\n\n(iii) At least 500 gallons of water and at least three pails of 10-quart capacity; or a waterline with sufficient hose to reach the working places; or a portable water car of at least 500-gallons capacity; or a portable, all-purpose, dry-powder chemical car of at least 125-pounds capacity.\n\n(3) As an alternative to paragraph (a)(2) of this section, each working section with no electrical equipment at the face of an anthracite coal mine producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Portable fire extinguishers containing a total capacity of at least 30 pounds of dry chemical or 15 gallons of foam and located at the entrance to the gangway at the bottom of the slope; and\n\n(ii) Portable fire extinguishers containing a total capacity of at least 20 pounds of dry chemical or 10 gallons of foam and located within 500 feet from the working face.\n\n(b) Belt conveyors. In all coal mines, waterlines shall be installed parallel to the entire length of belt conveyors and shall be equipped with firehose outlets with valves at 300-foot intervals along each belt conveyor and at tailpieces. At least 500 feet of firehose with fittings suitable for connection with each belt conveyor waterline system shall be stored at strategic locations along the belt conveyor. Waterlines may be installed in entries adjacent to the conveyor entry belt as long as the outlets project into the belt conveyor entry.\n\n(c) Haulage tracks. (1) In mines producing 300 tons of coal or more per shift waterlines shall be installed parallel to all haulage tracks using mechanized equipment in the track or adjacent entry and shall extend to the loading point of each working section. Waterlines shall be equipped with outlet valves at intervals of not more than 500 feet, and 500 feet of firehose with fittings suitable for connection with such waterlines shall be provided at strategic locations. Two portable water cars, readily available, may be used in lieu of waterlines prescribed under this paragraph.\n\n(2) In mines producing less than 300 tons of coal per shift, there shall be provided at 500-foot intervals in all main and secondary haulage roads:\n\n(i) A tank of water of at least 55-gallon capacity with at least 3 pails of not less than 10-quart capacity; or\n\n(ii) Not less than 240 pounds of bagged rock dust.\n\n(d) Transportation. Each track or off-track locomotive, self-propelled man-trip car, or personnel carrier shall be equipped with one portable fire extinguisher.\n\n(e) Electrical installations. At each electrical installation, the operator shall provide two portable fire extinguishers that have a nominal capacity of 5 pounds of dry chemical, or one extinguisher that has a nominal capacity of at least 10 pounds of dry chemical, and which have a 2-A:10-B:C or higher rating.\n\n(f) Oil storage stations. Two portable fire extinguishers and 240 pounds of rock dust, shall be provided at each permanent underground oil storage station. One portable fire extinguisher shall be provided at each working section where 25 gallons or more of oil are stored in addition to extinguishers required under paragraph (a) of this section.\n\n(g) Welding, cutting, soldering. One portable fire extinguisher or 240 pounds of rock dust shall be provided at locations where welding, cutting, or soldering with arc or flame is being done.\n\n(h) Powerlines. At each wooden door through which powerlines pass there shall be one portable fire extinguisher or 240 pounds of rock dust within 25 feet of the door on the intake air side.\n\n(i) Emergency materials. (1) At each mine producing 300 tons of coal or more per shift there shall be readily available the following materials at locations not exceeding 2 miles from each working section:\n\n1,000 board feet of brattice boards 2 rolls of brattice cloth 2 hand saws 25 pounds of 8 d nails 25 pounds of 10 d nails 25 pounds of 16 d nails 3 claw hammers 25 bags of wood fiber plaster or 10 bags of cement (or equivalent material for stoppings) 5 tons of rock dust\n\n(2) At each mine producing less than 300 tons of coal per shift the above materials shall be available at the mine, provided, however, that the emergency materials for one or more mines may be stored at a central warehouse or building supply company and such supply must be the equivalent of that required for all mines involved and within 1-hour's delivery time from each mine. This exception shall not apply where the active working sections are more than 2 miles from the surface.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 53127, Sept. 15, 2008]","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.360","heading":"Preshift examination at fixed intervals.","id":"75.360","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.\n\n(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.\n\n(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:\n\n(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.\n\n(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.\n\n(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.\n\n(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.\n\n(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.\n\n(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,\n\n(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.\n\n(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.\n\n(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.\n\n(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.\n\n(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.\n\n(11) Preshift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:\n\n(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.\n\n(3) At the intake end of any pillar line—\n\n(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) If a split system is used, in the intake entries of each split immediately inby the split point.\n\n(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.\n\n(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.\n\n(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.220","heading":"Roof control plan.","id":"75.220","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"C","subpartHeading":"Subpart C—Roof Support","text":"(a)(1) Each mine operator shall develop and follow a roof control plan, approved by the District Manager, that is suitable to the prevailing geological conditions, and the mining system to be used at the mine. Additional measures shall be taken to protect persons if unusual hazards are encountered.\n\n(2) The proposed roof control plan and any revisions to the plan shall be submitted, in writing, to the District Manager. When revisions to a roof control plan are proposed, only the revised pages need to be submitted unless otherwise specified by the District Manager.\n\n(b)(1) The mine operator will be notified in writing of the approval or denial of approval of a proposed roof control plan or proposed revision.\n\n(2) When approval of a proposed plan or revision is denied, the deficiencies of the plan or revision and recommended changes will be specified and the mine operator will be afforded an opportunity to discuss the deficiencies and changes with the District Manager.\n\n(3) Before new support materials, devices or systems other than roof bolts and accessories, are used as the only means of roof support, the District Manager may require that their effectiveness be demonstrated by experimental installations.\n\n(c) No proposed roof control plan or revision to a roof control plan shall be implemented before it is approved.\n\n(d) Before implementing an approved revision to a roof control plan, all persons who are affected by the revision shall be instructed in its provisions.\n\n(e) The approved roof control plan and any revisions shall be available to the miners and representative of miners at the mine.\n\n[53 FR 2375, Jan. 27, 1988; 53 FR 11395, Apr. 6, 1988, as amended at 60 FR 33723, June 29, 1995; 71 FR 16668, Apr. 3, 2006]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.606","heading":"Protection of trailing cables.","id":"75.606","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.606","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"G","subpartHeading":"Subpart G—Trailing Cables","text":"[Statutory Provisions]\n\nTrailing cables shall be adequately protected to prevent damage by mobile equipment.","occurrenceCount":1},{"chapter":"I","heading":"Main mine fan examinations and records.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.312","part":"75","subchapter":"O","subpart":"D","id":"75.312","citation":"30 CFR 75.312","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","heading":"Fire suppression devices.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1107","part":"75","subchapter":"O","subpart":"L","id":"75.1107","citation":"30 CFR 75.1107","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","heading":"Air quality detectors and measurement devices.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.320","part":"75","subchapter":"O","subpart":"D","id":"75.320","citation":"30 CFR 75.320","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"1519198","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}