{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"1518212","name":"Rhoades Branch H-4","status":"Abandoned and Sealed","status_date":"2002-09-13","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"KY","county":"Letcher","nearest_town":"Deane","operator_id":"P22657","operator_name":"Consol Of Kentucky Inc","controller_id":"C00692","controller_name":"CONSOL Energy Inc","district":"C05","office":"Norton VA Field Office","employees":0,"latitude":37.225556,"longitude":-82.755278},"coverage":{"contributingSources":15,"registeredSources":20,"sourceRows":816},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"1518212","name":"Rhoades Branch H-4"},"operator":{"type":"operator","id":"P22657","name":"Consol Of Kentucky Inc"},"controller":{"type":"controller","id":"C00692","name":"CONSOL Energy Inc"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C00692","name":"CONSOL Energy Inc"},"object":{"type":"mine","id":"1518212","name":"Rhoades Branch H-4"},"validFrom":"1986-07-31","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1518212|C00692|1986-07-31|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P22657","name":"Consol Of Kentucky Inc"},"object":{"type":"mine","id":"1518212","name":"Rhoades Branch H-4"},"validFrom":"1999-10-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1518212|P22657|1999-10-01|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C00692","name":"CONSOL Energy Inc"},"object":{"type":"operator","id":"P22657","name":"Consol Of Kentucky Inc"},"validFrom":"1999-10-01","validTo":null,"current":true,"derived":true,"evidenceMineId":"1518212","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1518212|P22657|1999-10-01|C00692|1986-07-31|49279"}}],"coverage":{"historyRecords":1,"edgeCount":3,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":25,"firstDate":"2000-04-05","lastDate":"2002-05-26","metrics":{"daysLost":378,"injuries":9,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"151986","DOCUMENT_NO":"220021540054","ACCIDENT_DT":"05/26/2002","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Continuous miner operator, Coal mole operator","NO_INJURIES":"1","DAYS_LOST":"59","NARRATIVE":"EE STATED WHILE RE POSITIONING MINER CABLE LOCATED NEXT TO MINER A PIECE OF ROCK SLID OF MINER STRIKING HIM ON TOP OF HIS LEFT FOOT. EE SUSTAINED A FRACTURE TO HIS LEFT FOOT.","sourceDate":"2002-05-26"},{"SOURCE_ROW_NUMBER":"125873","DOCUMENT_NO":"220020910041","ACCIDENT_DT":"03/24/2002","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"ART UNINTENTIONAL ROOF FALL OCCURRED ALONG THE PILLAR LINE IN THE #4 ENTRY AT BREAK #14. FALL WAS PART OF PILLAR FALL SIZE COULD NOT BE DETERMINED. CONTINOUS MINER WAS CAUGHT BY THE FALL, NO I NJURIES OCCURRED, VENTILATION WAS NOT INTERRUPTE","sourceDate":"2002-03-24"},{"SOURCE_ROW_NUMBER":"199190","DOCUMENT_NO":"220020870024","ACCIDENT_DT":"03/13/2002","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion NEC","OCCUPATION":"Electrician, Lineman","NO_INJURIES":"1","DAYS_LOST":"31","NARRATIVE":"EE STATED HE WAS CROSSING MOBILE BRIDGE WHEN HE STEPPED DOWN ON THE MINE FLOOR HE TWISTED HIS LEFT KNEE. AFTER EVALUATION BY A MEDICAL DR., IT WAS DETERMINED EE SUSTAINED A TORN LIGAMENT IN HI S LEFT KNEE.","sourceDate":"2002-03-13"},{"SOURCE_ROW_NUMBER":"272386","DOCUMENT_NO":"220012740078","ACCIDENT_DT":"09/15/2001","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"AN UNINTENTIONAL ROOF FALL OCCURRED ON 9/15/01 IN THE #4 ENTRY (BELT) AT BREAK 128 INTERSECTION ON #7 BELT. FALL WAS 12\"HIGH X 25'LONG X 25'WIDE. FALL OCCURRED ON BELT LINE. NO EQUIPMENT OR PE RSONNEL WERE INVOLVED AND THERE WERE NO INJURIES. THE AREA HAD BEEN BOLTED WITH 6'TENSION REBAR AND 9'CABLE BOLTS.","sourceDate":"2001-09-15"},{"SOURCE_ROW_NUMBER":"207887","DOCUMENT_NO":"220012670114","ACCIDENT_DT":"09/13/2001","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"AN UNINTENTIONAL ROOF FALL WAS DISCOVERED ON 9-13-01 IN THE #3 ENTRY (NEUTRAL AT BREAK #121 INTERSECTION. FALL WAS 6' HIGH X 25' LONG X 25' WIDE. NO EQUIPMENT OR PERSONNEL WERE INVOLVED AND TH ERE WERE NO INJURIES. THE AREA HAD BEEN BOLTED WITH 6' TENSION REBAR AND 9' CABLE BOLTS.","sourceDate":"2001-09-13"},{"SOURCE_ROW_NUMBER":"83164","DOCUMENT_NO":"220012670105","ACCIDENT_DT":"09/10/2001","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"AN UNINTENTIONAL ROOF FALL WAS DISCOVERED ON 9-10-01 IN THE #5 ENTRY (INTAKE) AT BREAK 82 INTERSECTION. FALL WAS 4' HIGH X 17' WIDE X 30' LONG. NO EQUIPMENT OR PERSONNEL WERE INVOLVED AND THER E WERE N9O INJURIES. THE AREA HAD BEEN BOLTED WITHE 72\" RESIN BOLTS.","sourceDate":"2001-09-10"},{"SOURCE_ROW_NUMBER":"108662","DOCUMENT_NO":"220012500008","ACCIDENT_DT":"08/23/2001","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"AN UNINTENTIONAL ROOF FALL WAS DISCOVERED ON 8-23-01 IN THE #7 ENTRY RETURN AT BREAK 61. FALL WAS APPROXIMATELY 5' HIGH X 17' WIDEX 30' LONG. NO ELQUIPMENT OR PERSONNEL WERE INVOLVED AND THERE WERE NO INJURIES. THE AREA HAD BEEN BOLTED WITH48\" RESIN BOLTS.","sourceDate":"2001-08-23"},{"SOURCE_ROW_NUMBER":"117391","DOCUMENT_NO":"220012350042","ACCIDENT_DT":"08/16/2001","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"AN UNINTENTIONAL ROOF FALL WAS DISCOVERED ON 8/16/01 IN THE #4 ENTRY (NEUTRAL) AT BREAK 94. FALL WAS APPROXIMATELY 10'TO 12'HIGH IN CENTER. NO INJURIES, NO EQUIPMENT CAUGHT, VENTILATION WAS NO T INTERRUPTED. THE AREA HAD BEEN BOLTED WITH 7' FULLY GROUTED RODS WITH PIZZA PAUS AS SUPPLEMENTAL SUPPORT FOR DRAW ROCK. FALL OCCURRED ON BELT AND TRACK.","sourceDate":"2001-08-16"},{"SOURCE_ROW_NUMBER":"246676","DOCUMENT_NO":"220012350041","ACCIDENT_DT":"08/10/2001","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"AN UNINTENTIONAL ROOF FALL OCCURRED IN THE #3 HEADING AT BREAK 7 OF PANEL 11 DURING RETREAT MINING ACTIVITIES. FALL WAS 7 1/2 FEET HIGH IN THE #2 LIFT ON THE PILLAR LINE AND CAUGHT THE CONTINU OUS MINER. NO INJURIES, ROOF BOLTED W/6' TORQUE TENSION FULLY GROUTED BOLTS.","sourceDate":"2001-08-10"},{"SOURCE_ROW_NUMBER":"53025","DOCUMENT_NO":"220012350040","ACCIDENT_DT":"08/07/2001","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"AN UNINTENTIONAL ROOF FALL WAS DISCOVERED ON 8/7/01 IN THE #2 ENTRY (NEUTRAL) AT BREAK 123. FALL WAS APPROXIMATELY 6'HIGH X 18'WIDE X 20'LONG (INTERSECTION). NO INJURIES, NO EQUIPMENT CAUGHT, VENTILATION WAS NOT INTERRUPTED. THE AREA HAD BEEN BOLTED WITH 6' REBAR TENSION BOLTS.","sourceDate":"2001-08-07"},{"SOURCE_ROW_NUMBER":"35832","DOCUMENT_NO":"220012320091","ACCIDENT_DT":"08/06/2001","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"AN UNINTENTIONAL ROOF FALL WAS DISCOVERED ON 8-6-01 IN THE #2 ENTRY (NEUTRAL) AT #125 BREAK. FALL WAS APPROX. 18' W X 20' L X 6' H (INTERSECTION). NO INJURIES, NO EQUIPMENT CAUGHT, VENTILATION WAS NOT INTERRUPTED. THE AREA HAD BEEN BOLTED WITH 6' REBAR TENSION BOLTS.","sourceDate":"2001-08-06"},{"SOURCE_ROW_NUMBER":"57258","DOCUMENT_NO":"220012320031","ACCIDENT_DT":"08/02/2001","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"AN UNINTENTIONAL ROOF FALL WAS DISCOVERED ON 8-2-01 IN THE #5 HEADOING IN TAKE AT #120 BREAK. FALL WAS APPROX. 18' WIDES 20' LONG X 5' HIGH INTERSECTION. NO INJURIES NO EQUIPMENT CAUGHT VENTIL ATION WAS NOT INTERRUPTED. THE AREA HAD BEEN BOLTED WITH 6' TENSION REBAR BOLTS.","sourceDate":"2001-08-02"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2002-09-13","lastDate":"2002-09-13","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":151,"firstDate":"2000-01-17","lastDate":"2002-05-14","metrics":{"ss":87,"delinquent":151,"recentRows":0,"paidPenalty":25877,"proposedPenalty":25877,"currentAssessment":25877},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"956543","VIOLATION_NO":"7388945","ISSUE_DT":"05/14/2002","CFR_STANDARD_CD":"75.203(e)(2)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"294.00","CURRENT_ASSESSMENT_AMT":"294.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-05-14"},{"SOURCE_ROW_NUMBER":"956542","VIOLATION_NO":"7388937","ISSUE_DT":"04/16/2002","CFR_STANDARD_CD":"75.1722(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"294.00","CURRENT_ASSESSMENT_AMT":"294.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-04-16"},{"SOURCE_ROW_NUMBER":"988394","VIOLATION_NO":"7383985","ISSUE_DT":"03/07/2002","CFR_STANDARD_CD":"75.503","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-03-07"},{"SOURCE_ROW_NUMBER":"1604233","VIOLATION_NO":"4592981","ISSUE_DT":"02/19/2002","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-02-19"},{"SOURCE_ROW_NUMBER":"1604232","VIOLATION_NO":"4520020","ISSUE_DT":"02/19/2002","CFR_STANDARD_CD":"75.364","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-02-19"},{"SOURCE_ROW_NUMBER":"955539","VIOLATION_NO":"7386166","ISSUE_DT":"02/13/2002","CFR_STANDARD_CD":"77.1607(cc)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"196.00","CURRENT_ASSESSMENT_AMT":"196.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-02-13"},{"SOURCE_ROW_NUMBER":"955538","VIOLATION_NO":"7386165","ISSUE_DT":"02/05/2002","CFR_STANDARD_CD":"75.1722(b)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"399.00","CURRENT_ASSESSMENT_AMT":"399.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-02-05"},{"SOURCE_ROW_NUMBER":"955537","VIOLATION_NO":"7386162","ISSUE_DT":"01/25/2002","CFR_STANDARD_CD":"75.517","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"317.00","CURRENT_ASSESSMENT_AMT":"317.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-01-25"},{"SOURCE_ROW_NUMBER":"955536","VIOLATION_NO":"7386161","ISSUE_DT":"01/25/2002","CFR_STANDARD_CD":"75.1100-2(f)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"317.00","CURRENT_ASSESSMENT_AMT":"317.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-01-25"},{"SOURCE_ROW_NUMBER":"955535","VIOLATION_NO":"7386120","ISSUE_DT":"01/25/2002","CFR_STANDARD_CD":"75.512","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-01-25"},{"SOURCE_ROW_NUMBER":"955534","VIOLATION_NO":"7386119","ISSUE_DT":"01/25/2002","CFR_STANDARD_CD":"75.342(a)(4)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-01-25"},{"SOURCE_ROW_NUMBER":"955533","VIOLATION_NO":"7380737","ISSUE_DT":"01/14/2002","CFR_STANDARD_CD":"75.202(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"317.00","CURRENT_ASSESSMENT_AMT":"317.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-01-14"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":215,"firstDate":"2000-03-31","lastDate":"2002-06-04","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":11,"validSamples":204,"maxConcentration":6.549,"concentrationTotal":137.596},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1478555","CASS_NUM":"57411629","SMP_TAKEN_DT":"6/4/2002","CONC":".758","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"MOBILE BRIDGE OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-04"},{"SOURCE_ROW_NUMBER":"1063977","CASS_NUM":"57411630","SMP_TAKEN_DT":"6/4/2002","CONC":".569","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"MOBILE BRIDGE OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-04"},{"SOURCE_ROW_NUMBER":"986850","CASS_NUM":"57411623","SMP_TAKEN_DT":"6/4/2002","CONC":".564","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-04"},{"SOURCE_ROW_NUMBER":"615809","CASS_NUM":"57411677","SMP_TAKEN_DT":"6/4/2002","CONC":".476","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-04"},{"SOURCE_ROW_NUMBER":"476221","CASS_NUM":"57411639","SMP_TAKEN_DT":"6/4/2002","CONC":".647","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER HELPER","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-04"},{"SOURCE_ROW_NUMBER":"333937","CASS_NUM":"57411665","SMP_TAKEN_DT":"6/4/2002","CONC":".27","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"LABORER","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-04"},{"SOURCE_ROW_NUMBER":"729149","CASS_NUM":"50633777","SMP_TAKEN_DT":"5/21/2002","CONC":"1.204","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-21"},{"SOURCE_ROW_NUMBER":"856669","CASS_NUM":"50633795","SMP_TAKEN_DT":"5/19/2002","CONC":".146","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-19"},{"SOURCE_ROW_NUMBER":"1048083","CASS_NUM":"50633775","SMP_TAKEN_DT":"5/18/2002","CONC":"1.032","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-18"},{"SOURCE_ROW_NUMBER":"529964","CASS_NUM":"50633800","SMP_TAKEN_DT":"5/18/2002","CONC":"1.06","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-18"},{"SOURCE_ROW_NUMBER":"162514","CASS_NUM":"50633807","SMP_TAKEN_DT":"5/17/2002","CONC":"1.522","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-17"},{"SOURCE_ROW_NUMBER":"740963","CASS_NUM":"57411833","SMP_TAKEN_DT":"5/6/2002","CONC":".732","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-06"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":14,"firstDate":"2000-01-06","lastDate":"2001-02-22","metrics":{"linkedIssuances":14},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":78,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":1,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":31,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":1,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":1,"firstDate":"1999-10-01","lastDate":"1999-10-01","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":0},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":86,"firstDate":"2000-03-10","lastDate":"2002-07-01","metrics":{"inspectors":102,"recentRows":0,"onSiteHours":1022.75,"inspectionHours":1600.5,"inspectionSamples":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"631568","EVENT_NO":"4167850","INSPECTION_BEGIN_DT":"07/01/2002","INSPECTION_END_DT":"07/01/2002","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7","SUM_TOTAL_ON_SITE_HOURS":"1.5","sourceDate":"2002-07-01"},{"SOURCE_ROW_NUMBER":"159746","EVENT_NO":"4179693","INSPECTION_BEGIN_DT":"06/03/2002","INSPECTION_END_DT":"06/13/2002","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"13.5","SUM_TOTAL_ON_SITE_HOURS":"9","sourceDate":"2002-06-03"},{"SOURCE_ROW_NUMBER":"984297","EVENT_NO":"4174726","INSPECTION_BEGIN_DT":"05/13/2002","INSPECTION_END_DT":"05/13/2002","ACTIVITY_CODE":"CAA","ACTIVITY":"SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"6.5","SUM_TOTAL_ON_SITE_HOURS":"2","sourceDate":"2002-05-13"},{"SOURCE_ROW_NUMBER":"1122103","EVENT_NO":"4179681","INSPECTION_BEGIN_DT":"05/02/2002","INSPECTION_END_DT":"05/07/2002","ACTIVITY_CODE":"BBB","ACTIVITY":"NOISE TECHNICAL INVESTIGATION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"6.5","SUM_TOTAL_ON_SITE_HOURS":"2.5","sourceDate":"2002-05-02"},{"SOURCE_ROW_NUMBER":"392504","EVENT_NO":"4179680","INSPECTION_BEGIN_DT":"05/02/2002","INSPECTION_END_DT":"05/16/2002","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"15","SUM_TOTAL_ON_SITE_HOURS":"9.5","sourceDate":"2002-05-02"},{"SOURCE_ROW_NUMBER":"773598","EVENT_NO":"4167848","INSPECTION_BEGIN_DT":"04/24/2002","INSPECTION_END_DT":"05/13/2002","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"14.5","SUM_TOTAL_ON_SITE_HOURS":"10.5","sourceDate":"2002-04-24"},{"SOURCE_ROW_NUMBER":"606521","EVENT_NO":"4167841","INSPECTION_BEGIN_DT":"04/01/2002","INSPECTION_END_DT":"05/20/2002","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"78.5","SUM_TOTAL_ON_SITE_HOURS":"57","sourceDate":"2002-04-01"},{"SOURCE_ROW_NUMBER":"1036720","EVENT_NO":"4164252","INSPECTION_BEGIN_DT":"03/25/2002","INSPECTION_END_DT":"03/25/2002","ACTIVITY_CODE":"CCA","ACTIVITY":"ROOF CONTROL TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"6.5","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2002-03-25"},{"SOURCE_ROW_NUMBER":"564007","EVENT_NO":"4179604","INSPECTION_BEGIN_DT":"03/25/2002","INSPECTION_END_DT":"03/26/2002","ACTIVITY_CODE":"AFC","ACTIVITY":"NON-INJURY ACCIDENT INVESTIGATION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"11","SUM_TOTAL_ON_SITE_HOURS":"4.5","sourceDate":"2002-03-25"},{"SOURCE_ROW_NUMBER":"345382","EVENT_NO":"4174716","INSPECTION_BEGIN_DT":"03/21/2002","INSPECTION_END_DT":"03/22/2002","ACTIVITY_CODE":"CAA","ACTIVITY":"SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"4","SUM_TOTAL_ON_SITE_HOURS":"1.5","sourceDate":"2002-03-21"},{"SOURCE_ROW_NUMBER":"703266","EVENT_NO":"4167549","INSPECTION_BEGIN_DT":"03/11/2002","INSPECTION_END_DT":"03/11/2002","ACTIVITY_CODE":"CAA","ACTIVITY":"SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5","SUM_TOTAL_ON_SITE_HOURS":"3","sourceDate":"2002-03-11"},{"SOURCE_ROW_NUMBER":"830130","EVENT_NO":"4179664","INSPECTION_BEGIN_DT":"03/07/2002","INSPECTION_END_DT":"03/14/2002","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"13","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2002-03-07"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":22,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2002-Q3":{"hours":672,"employees":2,"production":0},"2002-Q2":{"hours":26678,"employees":46,"production":163346},"2002-Q1":{"hours":41207,"employees":72,"production":200069},"2001-Q4":{"hours":38650,"employees":67,"production":185288},"2001-Q3":{"hours":40208,"employees":67,"production":180947},"2001-Q2":{"hours":38993,"employees":66,"production":225630},"2001-Q1":{"hours":40816,"employees":65,"production":210669},"2000-Q4":{"hours":39216,"employees":65,"production":213522},"2000-Q3":{"hours":39947,"employees":66,"production":212383},"2000-Q2":{"hours":39877,"employees":59,"production":203826},"2000-Q1":{"hours":1239,"employees":2,"production":5196}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":6,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000":{"hours":120279,"employees":49,"production":634927},"2001":{"hours":158667,"employees":66,"production":802534},"2002":{"hours":68557,"employees":40,"production":363415}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":11,"firstDate":"2001-09-25","lastDate":"2002-05-06","metrics":{"recentRows":0,"doseOver100":2,"actDoseTotal":1028,"pelDoseTotal":784},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"70215","EVENT_NO":"4179681","SURVEY_DATE":"05/06/2002","OCCUPATION_CD_DESC":"SUPPLY MAN","MACHINE_CD":"25","MANUFACTURER_CD":"119","ACT_DOSE_85":"39","PEL_DOSE_90":"22","SURVEY_TYPE":"I","sourceDate":"2002-05-06"},{"SOURCE_ROW_NUMBER":"70214","EVENT_NO":"4179681","SURVEY_DATE":"05/06/2002","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"95","PEL_DOSE_90":"72","SURVEY_TYPE":"I","sourceDate":"2002-05-06"},{"SOURCE_ROW_NUMBER":"70213","EVENT_NO":"4179681","SURVEY_DATE":"05/06/2002","OCCUPATION_CD_DESC":"MOBILE BRIDGE OPERATOR","MACHINE_CD":"08","MANUFACTURER_CD":"102","ACT_DOSE_85":"100","PEL_DOSE_90":"82","SURVEY_TYPE":"I","sourceDate":"2002-05-06"},{"SOURCE_ROW_NUMBER":"70212","EVENT_NO":"4179681","SURVEY_DATE":"05/06/2002","OCCUPATION_CD_DESC":"CONTINUOUS MINER HELPER","MACHINE_CD":"06","MANUFACTURER_CD":"033","ACT_DOSE_85":"164","PEL_DOSE_90":"128","SURVEY_TYPE":"I","sourceDate":"2002-05-06"},{"SOURCE_ROW_NUMBER":"70211","EVENT_NO":"4179681","SURVEY_DATE":"05/06/2002","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"033","ACT_DOSE_85":"161","PEL_DOSE_90":"119","SURVEY_TYPE":"I","sourceDate":"2002-05-06"},{"SOURCE_ROW_NUMBER":"70210","EVENT_NO":"4167379","SURVEY_DATE":"09/25/2001","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"033","ACT_DOSE_85":"78","PEL_DOSE_90":"65","SURVEY_TYPE":"I","sourceDate":"2001-09-25"},{"SOURCE_ROW_NUMBER":"70209","EVENT_NO":"4167379","SURVEY_DATE":"09/25/2001","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"77","PEL_DOSE_90":"51","SURVEY_TYPE":"I","sourceDate":"2001-09-25"},{"SOURCE_ROW_NUMBER":"70208","EVENT_NO":"4167379","SURVEY_DATE":"09/25/2001","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"85","PEL_DOSE_90":"62","SURVEY_TYPE":"I","sourceDate":"2001-09-25"},{"SOURCE_ROW_NUMBER":"70207","EVENT_NO":"4167379","SURVEY_DATE":"09/25/2001","OCCUPATION_CD_DESC":"MOBILE BRIDGE OPERATOR","MACHINE_CD":"40","MANUFACTURER_CD":"058","ACT_DOSE_85":"66","PEL_DOSE_90":"43","SURVEY_TYPE":"I","sourceDate":"2001-09-25"},{"SOURCE_ROW_NUMBER":"70206","EVENT_NO":"4167379","SURVEY_DATE":"09/25/2001","OCCUPATION_CD_DESC":"MOBILE BRIDGE OPERATOR","MACHINE_CD":"40","MANUFACTURER_CD":"058","ACT_DOSE_85":"84","PEL_DOSE_90":"74","SURVEY_TYPE":"I","sourceDate":"2001-09-25"},{"SOURCE_ROW_NUMBER":"70205","EVENT_NO":"4167379","SURVEY_DATE":"09/25/2001","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"033","ACT_DOSE_85":"79","PEL_DOSE_90":"66","SURVEY_TYPE":"I","sourceDate":"2001-09-25"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":22,"firstDate":"2000-04-10","lastDate":"2002-05-06","metrics":{"recentRows":0,"voidSamples":0,"maxQuartzPct":7.6,"validSamples":22,"quartzPctTotal":117.3},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"136410","CASSETTE_NO":"57411833","SAMPLE_DT":"05/06/2002","QUARTZ_PCT":"05.9","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-05-06"},{"SOURCE_ROW_NUMBER":"156464","CASSETTE_NO":"57411949","SAMPLE_DT":"04/24/2002","QUARTZ_PCT":"05.4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-04-24"},{"SOURCE_ROW_NUMBER":"104430","CASSETTE_NO":"57411926","SAMPLE_DT":"04/24/2002","QUARTZ_PCT":"05.5","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-04-24"},{"SOURCE_ROW_NUMBER":"14292","CASSETTE_NO":"57411920","SAMPLE_DT":"04/24/2002","QUARTZ_PCT":"03.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-04-24"},{"SOURCE_ROW_NUMBER":"168890","CASSETTE_NO":"57390559","SAMPLE_DT":"03/07/2002","QUARTZ_PCT":"05.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-03-07"},{"SOURCE_ROW_NUMBER":"164425","CASSETTE_NO":"57288431","SAMPLE_DT":"11/08/2001","QUARTZ_PCT":"02.9","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-11-08"},{"SOURCE_ROW_NUMBER":"134840","CASSETTE_NO":"57288362","SAMPLE_DT":"11/08/2001","QUARTZ_PCT":"06.4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-11-08"},{"SOURCE_ROW_NUMBER":"77228","CASSETTE_NO":"57288384","SAMPLE_DT":"11/08/2001","QUARTZ_PCT":"06.8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-11-08"},{"SOURCE_ROW_NUMBER":"92672","CASSETTE_NO":"57287745","SAMPLE_DT":"09/25/2001","QUARTZ_PCT":"05.7","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-09-25"},{"SOURCE_ROW_NUMBER":"38870","CASSETTE_NO":"57287738","SAMPLE_DT":"09/25/2001","QUARTZ_PCT":"03.4","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-09-25"},{"SOURCE_ROW_NUMBER":"18268","CASSETTE_NO":"57287643","SAMPLE_DT":"09/25/2001","QUARTZ_PCT":"07.6","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-09-25"},{"SOURCE_ROW_NUMBER":"52052","CASSETTE_NO":"57371235","SAMPLE_DT":"07/09/2001","QUARTZ_PCT":"05.3","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-07-09"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":152,"firstDate":"2000-01-17","lastDate":"2002-05-14","metrics":{"ss":87,"amountDue":25877,"contested":0,"amountPaid":25877,"recentRows":0,"section104d":0,"unterminated":0,"proposedPenalty":25877},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"964480","VIOLATION_NO":"7388945","VIOLATION_ISSUE_DT":"05/14/2002","SIG_SUB":"Y","PART_SECTION":"75.203(e)(2)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/14/2002","PROPOSED_PENALTY":"294","AMOUNT_DUE":"294","AMOUNT_PAID":"294","CONTESTED_IND":"N","sourceDate":"2002-05-14"},{"SOURCE_ROW_NUMBER":"964479","VIOLATION_NO":"7388937","VIOLATION_ISSUE_DT":"04/16/2002","SIG_SUB":"Y","PART_SECTION":"75.1722(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/16/2002","PROPOSED_PENALTY":"294","AMOUNT_DUE":"294","AMOUNT_PAID":"294","CONTESTED_IND":"N","sourceDate":"2002-04-16"},{"SOURCE_ROW_NUMBER":"964478","VIOLATION_NO":"7383985","VIOLATION_ISSUE_DT":"03/07/2002","SIG_SUB":"N","PART_SECTION":"75.503","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"03/11/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-03-07"},{"SOURCE_ROW_NUMBER":"964475","VIOLATION_NO":"4592981","VIOLATION_ISSUE_DT":"02/19/2002","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/26/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-02-19"},{"SOURCE_ROW_NUMBER":"964474","VIOLATION_NO":"4520020","VIOLATION_ISSUE_DT":"02/19/2002","SIG_SUB":"N","PART_SECTION":"75.364","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/26/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-02-19"},{"SOURCE_ROW_NUMBER":"964466","VIOLATION_NO":"7386166","VIOLATION_ISSUE_DT":"02/13/2002","SIG_SUB":"Y","PART_SECTION":"77.1607(cc)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"02/15/2002","PROPOSED_PENALTY":"196","AMOUNT_DUE":"196","AMOUNT_PAID":"196","CONTESTED_IND":"N","sourceDate":"2002-02-13"},{"SOURCE_ROW_NUMBER":"964465","VIOLATION_NO":"7386165","VIOLATION_ISSUE_DT":"02/05/2002","SIG_SUB":"Y","PART_SECTION":"75.1722(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/06/2002","PROPOSED_PENALTY":"399","AMOUNT_DUE":"399","AMOUNT_PAID":"399","CONTESTED_IND":"N","sourceDate":"2002-02-05"},{"SOURCE_ROW_NUMBER":"964464","VIOLATION_NO":"7386162","VIOLATION_ISSUE_DT":"01/25/2002","SIG_SUB":"Y","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/25/2002","PROPOSED_PENALTY":"317","AMOUNT_DUE":"317","AMOUNT_PAID":"317","CONTESTED_IND":"N","sourceDate":"2002-01-25"},{"SOURCE_ROW_NUMBER":"964463","VIOLATION_NO":"7386161","VIOLATION_ISSUE_DT":"01/25/2002","SIG_SUB":"Y","PART_SECTION":"75.1100-2(f)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/25/2002","PROPOSED_PENALTY":"317","AMOUNT_DUE":"317","AMOUNT_PAID":"317","CONTESTED_IND":"N","sourceDate":"2002-01-25"},{"SOURCE_ROW_NUMBER":"964462","VIOLATION_NO":"7386120","VIOLATION_ISSUE_DT":"01/25/2002","SIG_SUB":"N","PART_SECTION":"75.512","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/30/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-01-25"},{"SOURCE_ROW_NUMBER":"964461","VIOLATION_NO":"7386119","VIOLATION_ISSUE_DT":"01/25/2002","SIG_SUB":"N","PART_SECTION":"75.342(a)(4)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/30/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-01-25"},{"SOURCE_ROW_NUMBER":"964460","VIOLATION_NO":"7380737","VIOLATION_ISSUE_DT":"01/14/2002","SIG_SUB":"Y","PART_SECTION":"75.202(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/17/2002","PROPOSED_PENALTY":"317","AMOUNT_DUE":"317","AMOUNT_PAID":"317","CONTESTED_IND":"N","sourceDate":"2002-01-14"}]}],"safety":{"href":"/api/v1/mines/1518212/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/1518212/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","heading":"Mining methods.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.203","part":"75","subchapter":"O","subpart":"C","id":"75.203","citation":"30 CFR 75.203","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1722","heading":"Mechanical equipment guards.","id":"75.1722","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1722","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) Gears; sprockets; chains; drive, head, tail, and takeup pulleys; flywheels; couplings, shafts; sawblades; fan inlets; and similar exposed moving machine parts which may be contacted by persons, and which may cause injury to persons shall be guarded.\n\n(b) Guards at conveyor-drive, conveyor-head, and conveyor-tail pulleys shall extend a distance sufficient to prevent a person from reaching behind the guard and becoming caught between the belt and the pulley.\n\n(c) Except when testing the machinery, guards shall be securely in place while machinery is being operated.\n\n[38 FR 4976, Feb. 23, 1973]","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.503","heading":"Permissible electric face equipment; maintenance.","id":"75.503","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nThe operator of each coal mine shall maintain in permissible condition all electric face equipment required by §§ 75.500, 75.501, 75.504 to be permissible which is taken into or used inby the last open crosscut of any such mine.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.364","heading":"Weekly examination.","id":"75.364","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.364","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) Worked-out areas. (1) At least every 7 days, a certified person shall examine unsealed worked-out areas where no pillars have been recovered by traveling to the area of deepest penetration; measuring methane and oxygen concentrations and air quantities and making tests to determine if the air is moving in the proper direction in the area. The locations of measurement points where tests and measurements will be performed shall be included in the mine ventilation plan and shall be adequate in number and location to assure ventilation and air quality in the area. Air quantity measurements shall also be made where the air enters and leaves the worked-out area. An alternative method of evaluating the ventilation of the area may be approved in the ventilation plan.\n\n(2) At least every 7 days, a certified person shall evaluate the effectiveness of bleeder systems required by § 75.334 as follows:\n\n(i) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in its proper direction shall be made where air enters the worked-out area.\n\n(ii) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in the proper direction shall be made immediately before the air enters a return split of air.\n\n(iii) At least one entry of each set of bleeder entries used as part of a bleeder system under § 75.334 shall be traveled in its entirety. Measurements of methane and oxygen concentrations and air quantities and a test to determine if the air is moving in the proper direction shall be made at the measurement point locations specified in the mine ventilation plan to determine the effectiveness of the bleeder system.\n\n(iv) In lieu of the requirements of paragraphs (a)(2)(i) and (iii) of this section, an alternative method of evaluation may be specified in the ventilation plan provided the alternative method results in proper evaluation of the effectiveness of the bleeder system.\n\n(b) Hazardous conditions and violations of mandatory health or safety standards. At least every 7 days, an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(8) of this section shall be made by a certified person designated by the operator at the following locations:\n\n(1) In at least one entry of each intake air course, in its entirety, so that the entire air course is traveled.\n\n(2) In at least one entry of each return air course, in its entirety, so that the entire air course is traveled.\n\n(3) In each longwall or shortwall travelway in its entirety, so that the entire travelway is traveled.\n\n(4) At each seal along return and bleeder air courses and at each seal along intake air courses not examined under § 75.360(b)(5).\n\n(5) In each escapeway so that the entire escapeway is traveled.\n\n(6) On each working section not examined under § 75.360(b)(3) during the previous 7 days.\n\n(7) At each water pump not examined during a preshift examination conducted during the previous 7 days.\n\n(8) Weekly examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust; and\n\n(iv) § 75.1403—maintenance of off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) Measurements and tests. At least every 7 days, a certified person shall—\n\n(1) Determine the volume of air entering the main intakes and in each intake split;\n\n(2) Determine the volume of air and test for methane in the last open crosscut in any pair or set of developing entries or rooms, in the return of each split of air immediately before it enters the main returns, and where the air leaves the main returns; and\n\n(3) Test for methane in the return entry nearest each set of seals immediately after the air passes the seals.\n\n(d) Hazardous conditions shall be corrected immediately. If the condition creates an imminent danger, everyone except those persons referred to in section 104(c) of the Act shall be withdrawn from the area affected to a safe area until the hazardous condition is corrected. Any violation of the nine mandatory health or safety standards found during a weekly examination shall be corrected.\n\n(e) The weekly examination may be conducted at the same time as the preshift or on-shift examinations.\n\n(f) (1) The weekly examination is not required during any 7 day period in which no one enters any underground area of the mine.\n\n(2) Except for certified persons required to make examinations, no one shall enter any underground area of the mine if a weekly examination has not been completed within the previous 7 days.\n\n(g) Certification. The person making the weekly examinations shall certify by initials, date, and the time that the examination was made. Certifications and times shall appear at enough locations to show that the entire area has been examined.\n\n(h) Recordkeeping. At the completion of any shift during which a portion of a weekly examination is conducted, a record of the results of each weekly examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards found during each examination and their locations, the corrective action taken, and the results and location of air and methane measurements, shall be made. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the person making the examination or a person designated by the operator. If made by a person other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. The record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(i) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 77 FR 20715, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.1607","heading":"Loading and haulage equipment; operation.","id":"77.1607","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-Q/section-77.1607","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"Q","subpartHeading":"Subpart Q—Loading and Haulage","text":"(a) Vehicles shall follow at a safe distance; passing shall be limited to areas of adequate clearance and visibility.\n\n(b) Mobile equipment operators shall have full control of the equipment while it is in motion.\n\n(c) Equipment operating speeds shall be prudent and consistent with conditions of roadway, grades, clearance, visibility, traffic, and the type of equipment used.\n\n(d) Cabs of mobile equipment shall be kept free of extraneous materials.\n\n(e) Operators shall sit facing the direction of travel while operating equipment with dual controls.\n\n(f) When an equipment operator is present, men shall notify him before getting on or off equipment.\n\n(g) Equipment operators shall be certain, by signal or other means, that all persons are clear before starting or moving equipment.\n\n(h) Where possible, aerial tramways shall not be started until the tramway operator has ascertained that everyone is in the clear.\n\n(i) Dust control measures shall be taken where dust significantly reduces visibility of equipment operators.\n\n(j) Dippers, buckets, loading booms, or heavy suspended loads shall not be swung over the cabs of haulage vehicles until the drivers are out of the cabs and in safe locations, unless the trucks are designed specifically to protect the drivers from falling material.\n\n(k) Men shall not work or pass under the buckets or booms of loaders in operation.\n\n(l) Tires shall be deflated before repairs on them are started and adequate means shall be provided to prevent wheel locking rims from creating a hazard during tire inflation.\n\n(m) Electrically powered mobile equipment shall not be left unattended unless the master switch is in the off position, all operating controls are in the neutral position, and the brakes are set or other equivalent precautions are taken against rolling.\n\n(n) Mobile equipment shall not be left unattended unless the brakes are set. The wheels shall be turned into a bank or berm, or shall be blocked, when such equipment is parked on a grade.\n\n(o) Lights, flares, or other warning devices shall be posted when parked equipment creates a hazard to vehicular traffic.\n\n(p) Dippers, buckets, scraper blades, and similar movable parts shall be secured or lowered to the ground when not in use.\n\n(q) Shovel trailing cables shall not be moved with the shovel dipper unless cable slings or sleds are used.\n\n(r) Equipment which is to be hauled shall be loaded and protected so as to prevent sliding or spillage.\n\n(s) When moving between work areas, the equipment shall be secured in the travel position.\n\n(t) Any load extending more than 4 feet beyond the rear of the vehicle body should be marked clearly with a red flag by day and a red light at night.\n\n(u) Tow bars shall be used to tow heavy equipment and a safety chain shall be used in conjunction with each tow bar.\n\n(v) Railroad cars shall be kept under control at all times by the car dropper. Cars shall be dropped at a safe rate and in a manner that will insure that the car dropper maintains a safe position while working and traveling around the cars.\n\n(w) Railroad cars shall not be coupled or uncoupled manually from the inside of curves unless the railroad and cars are so designed to eliminate any hazard from coupling or uncoupling cars from inside of curves.\n\n(x) Persons shall wear safety belts when dropping railroad cars.\n\n(y) Railcars shall not be left on sidetracks unless ample clearance is provided for traffic on adjacent tracks.\n\n(z) Parked railcars, unless held effectively by brakes, shall be blocked securely.\n\n(aa) Railroad cars and all trucks shall be trimmed properly when they have been loaded higher than the confines of their cargo space.\n\n(bb) When the entire length of a conveyor is visible from the starting switch, the operator shall visually check to make certain that all persons are in the clear before starting the conveyor. When the entire length of the conveyor is not visible from the starting switch, a positive audible or visible warning system shall be installed and operated to warn persons that the conveyor will be started.\n\n(cc) Unguarded conveyors with walkways shall be equipped with emergency stop devices or cords along their full length.\n\n(dd) Adequate backstops or brakes shall be installed on inclined-conveyor drive units to prevent conveyors from running in reverse if a hazard to personnel would be caused.\n\n(ee) Aerial tram conveyor buckets shall not be overloaded, and feed shall be regulated to prevent spillage.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.517","heading":"Power wires and cables; insulation and protection.","id":"75.517","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.517","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nPower wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately and fully protected.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1100-2","heading":"Quantity and location of firefighting equipment.","id":"75.1100-2","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-2","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Working sections. (1) Each working section of coal mines producing 300 tons or more per shift shall be provided with two portable fire extinguishers and 240 pounds of rock dust in bags or other suitable containers; waterlines shall extend to each section loading point and be equipped with enough fire hose to reach each working face unless the section loading point is provided with one of the following:\n\n(i) Two portable water cars; or\n\n(ii) Two portable chemical cars; or\n\n(iii) One portable water car or one portable chemical car, and either (a) a portable foam-generating machine or (b) a portable high-pressure rock-dusting machine fitted with at least 250 feet of hose and supplied with at least 60 sacks of rock dust.\n\n(2) Each working section of coal mines producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Two portable fire extinguishers; and\n\n(ii) 240 pounds of rock dust in bags or other suitable containers; and\n\n(iii) At least 500 gallons of water and at least three pails of 10-quart capacity; or a waterline with sufficient hose to reach the working places; or a portable water car of at least 500-gallons capacity; or a portable, all-purpose, dry-powder chemical car of at least 125-pounds capacity.\n\n(3) As an alternative to paragraph (a)(2) of this section, each working section with no electrical equipment at the face of an anthracite coal mine producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Portable fire extinguishers containing a total capacity of at least 30 pounds of dry chemical or 15 gallons of foam and located at the entrance to the gangway at the bottom of the slope; and\n\n(ii) Portable fire extinguishers containing a total capacity of at least 20 pounds of dry chemical or 10 gallons of foam and located within 500 feet from the working face.\n\n(b) Belt conveyors. In all coal mines, waterlines shall be installed parallel to the entire length of belt conveyors and shall be equipped with firehose outlets with valves at 300-foot intervals along each belt conveyor and at tailpieces. At least 500 feet of firehose with fittings suitable for connection with each belt conveyor waterline system shall be stored at strategic locations along the belt conveyor. Waterlines may be installed in entries adjacent to the conveyor entry belt as long as the outlets project into the belt conveyor entry.\n\n(c) Haulage tracks. (1) In mines producing 300 tons of coal or more per shift waterlines shall be installed parallel to all haulage tracks using mechanized equipment in the track or adjacent entry and shall extend to the loading point of each working section. Waterlines shall be equipped with outlet valves at intervals of not more than 500 feet, and 500 feet of firehose with fittings suitable for connection with such waterlines shall be provided at strategic locations. Two portable water cars, readily available, may be used in lieu of waterlines prescribed under this paragraph.\n\n(2) In mines producing less than 300 tons of coal per shift, there shall be provided at 500-foot intervals in all main and secondary haulage roads:\n\n(i) A tank of water of at least 55-gallon capacity with at least 3 pails of not less than 10-quart capacity; or\n\n(ii) Not less than 240 pounds of bagged rock dust.\n\n(d) Transportation. Each track or off-track locomotive, self-propelled man-trip car, or personnel carrier shall be equipped with one portable fire extinguisher.\n\n(e) Electrical installations. At each electrical installation, the operator shall provide two portable fire extinguishers that have a nominal capacity of 5 pounds of dry chemical, or one extinguisher that has a nominal capacity of at least 10 pounds of dry chemical, and which have a 2-A:10-B:C or higher rating.\n\n(f) Oil storage stations. Two portable fire extinguishers and 240 pounds of rock dust, shall be provided at each permanent underground oil storage station. One portable fire extinguisher shall be provided at each working section where 25 gallons or more of oil are stored in addition to extinguishers required under paragraph (a) of this section.\n\n(g) Welding, cutting, soldering. One portable fire extinguisher or 240 pounds of rock dust shall be provided at locations where welding, cutting, or soldering with arc or flame is being done.\n\n(h) Powerlines. At each wooden door through which powerlines pass there shall be one portable fire extinguisher or 240 pounds of rock dust within 25 feet of the door on the intake air side.\n\n(i) Emergency materials. (1) At each mine producing 300 tons of coal or more per shift there shall be readily available the following materials at locations not exceeding 2 miles from each working section:\n\n1,000 board feet of brattice boards 2 rolls of brattice cloth 2 hand saws 25 pounds of 8 d nails 25 pounds of 10 d nails 25 pounds of 16 d nails 3 claw hammers 25 bags of wood fiber plaster or 10 bags of cement (or equivalent material for stoppings) 5 tons of rock dust\n\n(2) At each mine producing less than 300 tons of coal per shift the above materials shall be available at the mine, provided, however, that the emergency materials for one or more mines may be stored at a central warehouse or building supply company and such supply must be the equivalent of that required for all mines involved and within 1-hour's delivery time from each mine. This exception shall not apply where the active working sections are more than 2 miles from the surface.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 53127, Sept. 15, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.512","heading":"Electric equipment; examination, testing and maintenance.","id":"75.512","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.512","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provision]\n\nAll electric equipment shall be frequently examined, tested, and properly maintained by a qualified person to assure safe operating conditions. When a potentially dangerous condition is found on electric equipment, such equipment shall be removed from service until such condition is corrected. A record of such examinations shall be kept and made available to an authorized representative of the Secretary and to the miners in such mine.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.342","heading":"Methane monitors.","id":"75.342","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.342","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) MSHA approved methane monitors shall be installed on all face cutting machines, continuous miners, longwall face equipment, loading machines, and other mechanized equipment used to extract or load coal within the working place.\n\n(2) The sensing device for methane monitors on longwall shearing machines shall be installed at the return air end of the longwall face. An additional sensing device also shall be installed on the longwall shearing machine, downwind and as close to the cutting head as practicable. An alternative location or locations for the sensing device required on the longwall shearing machine may be approved in the ventilation plan.\n\n(3) The sensing devices of methane monitors shall be installed as close to the working face as practicable.\n\n(4) Methane monitors shall be maintained in permissible and proper operating condition and shall be calibrated with a known air-methane mixture at least once every 31 days. To assure that methane monitors are properly maintained and calibrated, the operator shall:\n\n(i) Use persons properly trained in the maintenance, calibration, and permissibility of methane monitors to calibrate and maintain the devices.\n\n(ii) Maintain a record of all calibration tests of methane monitors. Records shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(iii) Retain the record of calibration tests for 1 year from the date of the test. Records shall be retained at a surface location at the mine and made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n(b)(1) When the methane concentration at any methane monitor reaches 1.0 percent the monitor shall give a warning signal.\n\n(2) The warning signal device of the methane monitor shall be visible to a person who can deenergize electric equipment or shut down diesel-powered equipment on which the monitor is mounted.\n\n(c) The methane monitor shall automatically deenergize electric equipment or shut down diesel-powered equipment on which it is mounted when—\n\n(1) The methane concentration at any methane monitor reaches 2.0 percent; or\n\n(2) The monitor is not operating properly.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.202","heading":"Protection from falls of roof, face and ribs.","id":"75.202","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.202","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"C","subpartHeading":"Subpart C—Roof Support","text":"(a) The roof, face and ribs of areas where persons work or travel shall be supported or otherwise controlled to protect persons from hazards related to falls of the roof, face or ribs and coal or rock bursts.\n\n(b) No person shall work or travel under unsupported roof unless in accordance with this subpart.","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"1518212","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}