{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"1518131","name":"Rb #8","status":"Abandoned","status_date":"2001-08-23","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"KY","county":"Harlan","nearest_town":"Pathfork","operator_id":"P14483","operator_name":"Manalapan Mining Company Inc","controller_id":"C00015","controller_name":"Benjamin R.  Bennett","district":"C07","office":"Barbourville KY Field Office","employees":0,"latitude":36.7325,"longitude":-83.4078},"coverage":{"contributingSources":13,"registeredSources":20,"sourceRows":298},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"1518131","name":"Rb #8"},"operator":{"type":"operator","id":"P14483","name":"Manalapan Mining Company Inc"},"controller":{"type":"controller","id":"C00015","name":"Benjamin R.  Bennett"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C00015","name":"Benjamin R.  Bennett"},"object":{"type":"mine","id":"1518131","name":"Rb #8"},"validFrom":"1981-11-03","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1518131|C00015|1981-11-03|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P14483","name":"Manalapan Mining Company Inc"},"object":{"type":"mine","id":"1518131","name":"Rb #8"},"validFrom":"1999-01-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1518131|P14483|1999-01-01|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C00015","name":"Benjamin R.  Bennett"},"object":{"type":"operator","id":"P14483","name":"Manalapan Mining Company Inc"},"validFrom":"1999-01-01","validTo":null,"current":true,"derived":true,"evidenceMineId":"1518131","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1518131|P14483|1999-01-01|C00015|1981-11-03|43574"}}],"coverage":{"historyRecords":1,"edgeCount":3,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":3,"firstDate":"2000-06-14","lastDate":"2001-02-26","metrics":{"daysLost":202,"injuries":3,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"125864","DOCUMENT_NO":"220010850071","ACCIDENT_DT":"02/26/2001","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Continuous miner helper, Coal mole helper, Bridgeman","NO_INJURIES":"1","DAYS_LOST":"160","NARRATIVE":"INJURED WAS CLEANING THE NARROW SIDE OF THE LO-LO BELT STRUCTURE WHEN A PIECE OF DRAWROCK FELL FROM THE ROOF AND STRUCK HIM ON THE LEFT SHOULDERAND ARM AREA. THE ROCK WAS LESS THEN 2' IN DIAME TER AND FELL FROM BETWEEN THE LAST ROOF BOLT AND COAL RIB.","sourceDate":"2001-02-26"},{"SOURCE_ROW_NUMBER":"143358","DOCUMENT_NO":"220002840070","ACCIDENT_DT":"09/23/2000","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Maintenance man, Mechanic,  Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech","NO_INJURIES":"1","NARRATIVE":"INJURED WAS FINISHING INSTALLING THE HEAD ON THECONTINUOUS MINER AND AS HE WAS INSTALLING THE RIPPER CHAIN, IT FELL AND STRUCK INJURED ON THE THUMB REQUIRING 5 STITCHES.","sourceDate":"2000-09-23"},{"SOURCE_ROW_NUMBER":"100169","DOCUMENT_NO":"220001780173","ACCIDENT_DT":"06/14/2000","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall to the walkway or working surface","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"42","NARRATIVE":"INJURED HAD PLACED THE BOLT HALFWAY INTO THE HOLE HE HAD JUST DRILLED AND AS HE ATTEMPTED TO MANUALLY STRAIGHTEN THE BOLT IN ORDER TO SHOVE IT THE REST OF THE WAY INTO THE HOLE, HE SLIPPED AND FELT SOMETHING PULL IN HIS LOWER BACK.","sourceDate":"2000-06-14"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2001-08-23","lastDate":"2001-08-23","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":36,"firstDate":"2000-01-10","lastDate":"2001-06-13","metrics":{"ss":19,"delinquent":36,"recentRows":0,"paidPenalty":3452.41,"proposedPenalty":4217,"currentAssessment":4130},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1085945","VIOLATION_NO":"7498613","ISSUE_DT":"06/13/2001","CFR_STANDARD_CD":"77.800-1(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"161.00","CURRENT_ASSESSMENT_AMT":"161.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"1085944","VIOLATION_NO":"7498612","ISSUE_DT":"06/13/2001","CFR_STANDARD_CD":"75.1100-2(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"1085943","VIOLATION_NO":"7498611","ISSUE_DT":"06/13/2001","CFR_STANDARD_CD":"75.1103-8(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"1085942","VIOLATION_NO":"7498610","ISSUE_DT":"06/13/2001","CFR_STANDARD_CD":"75.362(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"1085941","VIOLATION_NO":"7498609","ISSUE_DT":"06/13/2001","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"173.00","CURRENT_ASSESSMENT_AMT":"173.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"1085940","VIOLATION_NO":"7498606","ISSUE_DT":"06/13/2001","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"1099171","VIOLATION_NO":"7451035","ISSUE_DT":"05/03/2001","CFR_STANDARD_CD":"70.100(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"399.00","CURRENT_ASSESSMENT_AMT":"399.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-05-03"},{"SOURCE_ROW_NUMBER":"1099168","VIOLATION_NO":"7451030","ISSUE_DT":"03/12/2001","CFR_STANDARD_CD":"70.100(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"399.00","CURRENT_ASSESSMENT_AMT":"399.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-03-12"},{"SOURCE_ROW_NUMBER":"1096954","VIOLATION_NO":"7498052","ISSUE_DT":"02/22/2001","CFR_STANDARD_CD":"75.604(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-02-22"},{"SOURCE_ROW_NUMBER":"1096953","VIOLATION_NO":"7498051","ISSUE_DT":"02/22/2001","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-02-22"},{"SOURCE_ROW_NUMBER":"1096952","VIOLATION_NO":"7498042","ISSUE_DT":"01/05/2001","CFR_STANDARD_CD":"75.807","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-01-05"},{"SOURCE_ROW_NUMBER":"1096937","VIOLATION_NO":"7498036","ISSUE_DT":"12/07/2000","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-12-07"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":144,"firstDate":"2000-01-10","lastDate":"2001-06-29","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":6,"validSamples":138,"maxConcentration":4.876,"concentrationTotal":154.779},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"842296","CASS_NUM":"50602925","SMP_TAKEN_DT":"6/29/2001","CONC":".769","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-06-29"},{"SOURCE_ROW_NUMBER":"1277607","CASS_NUM":"50602927","SMP_TAKEN_DT":"6/27/2001","CONC":"1.2","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-06-27"},{"SOURCE_ROW_NUMBER":"839838","CASS_NUM":"50602948","SMP_TAKEN_DT":"6/25/2001","CONC":".632","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-06-25"},{"SOURCE_ROW_NUMBER":"902855","CASS_NUM":"50602937","SMP_TAKEN_DT":"6/23/2001","CONC":".891","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-06-23"},{"SOURCE_ROW_NUMBER":"1279254","CASS_NUM":"50602941","SMP_TAKEN_DT":"6/22/2001","CONC":".849","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-06-22"},{"SOURCE_ROW_NUMBER":"1147706","CASS_NUM":"50577850","SMP_TAKEN_DT":"4/21/2001","CONC":".72","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"EXCESS SAMPLE","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-04-21"},{"SOURCE_ROW_NUMBER":"1548290","CASS_NUM":"50577698","SMP_TAKEN_DT":"4/20/2001","CONC":".422","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-04-20"},{"SOURCE_ROW_NUMBER":"187099","CASS_NUM":"50577726","SMP_TAKEN_DT":"4/18/2001","CONC":".615","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-04-18"},{"SOURCE_ROW_NUMBER":"1393457","CASS_NUM":"57346889","SMP_TAKEN_DT":"4/16/2001","CONC":"1.049","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-04-16"},{"SOURCE_ROW_NUMBER":"1241129","CASS_NUM":"57346943","SMP_TAKEN_DT":"4/16/2001","CONC":"4.876","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-04-16"},{"SOURCE_ROW_NUMBER":"1151954","CASS_NUM":"57346971","SMP_TAKEN_DT":"4/16/2001","CONC":"2.876","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"MOBILE BRIDGE OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-04-16"},{"SOURCE_ROW_NUMBER":"1139733","CASS_NUM":"57346893","SMP_TAKEN_DT":"4/16/2001","CONC":"2.514","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"MOBILE BRIDGE OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2001-04-16"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":1,"firstDate":"2000-10-26","lastDate":"2000-10-26","metrics":{"linkedIssuances":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":1,"firstDate":"1999-01-01","lastDate":"1999-01-01","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":0},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":31,"firstDate":"2000-01-03","lastDate":"2001-07-25","metrics":{"inspectors":35,"recentRows":0,"onSiteHours":368.5,"inspectionHours":658.5,"inspectionSamples":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"192617","EVENT_NO":"4209197","INSPECTION_BEGIN_DT":"07/25/2001","INSPECTION_END_DT":"07/26/2001","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"11","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2001-07-25"},{"SOURCE_ROW_NUMBER":"1095554","EVENT_NO":"4220869","INSPECTION_BEGIN_DT":"07/23/2001","INSPECTION_END_DT":"07/26/2001","ACTIVITY_CODE":"CAA","ACTIVITY":"SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"9","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2001-07-23"},{"SOURCE_ROW_NUMBER":"622784","EVENT_NO":"4209195","INSPECTION_BEGIN_DT":"06/11/2001","INSPECTION_END_DT":"06/28/2001","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"48","SUM_TOTAL_ON_SITE_HOURS":"28","sourceDate":"2001-06-11"},{"SOURCE_ROW_NUMBER":"867485","EVENT_NO":"4220849","INSPECTION_BEGIN_DT":"05/03/2001","INSPECTION_END_DT":"05/10/2001","ACTIVITY_CODE":"CED","ACTIVITY":"RESP DUST TECHNICAL INVESTIGATION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2001-05-03"},{"SOURCE_ROW_NUMBER":"84841","EVENT_NO":"4220842","INSPECTION_BEGIN_DT":"04/16/2001","INSPECTION_END_DT":"04/17/2001","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"15","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2001-04-16"},{"SOURCE_ROW_NUMBER":"671025","EVENT_NO":"4220835","INSPECTION_BEGIN_DT":"03/21/2001","INSPECTION_END_DT":"04/03/2001","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"18","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2001-03-21"},{"SOURCE_ROW_NUMBER":"111626","EVENT_NO":"4220829","INSPECTION_BEGIN_DT":"03/12/2001","INSPECTION_END_DT":"03/20/2001","ACTIVITY_CODE":"CED","ACTIVITY":"RESP DUST TECHNICAL INVESTIGATION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"6","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2001-03-12"},{"SOURCE_ROW_NUMBER":"325231","EVENT_NO":"4218595","INSPECTION_BEGIN_DT":"01/22/2001","INSPECTION_END_DT":"01/23/2001","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"16","SUM_TOTAL_ON_SITE_HOURS":"11","sourceDate":"2001-01-22"},{"SOURCE_ROW_NUMBER":"608742","EVENT_NO":"4219057","INSPECTION_BEGIN_DT":"01/02/2001","INSPECTION_END_DT":"03/28/2001","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"25","SUM_TOTAL_ON_SITE_HOURS":"11","sourceDate":"2001-01-02"},{"SOURCE_ROW_NUMBER":"237900","EVENT_NO":"4219058","INSPECTION_BEGIN_DT":"01/02/2001","INSPECTION_END_DT":"03/21/2001","ACTIVITY_CODE":"CDB","ACTIVITY":"ACCIDENT PREVENTION SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"48","SUM_TOTAL_ON_SITE_HOURS":"26","sourceDate":"2001-01-02"},{"SOURCE_ROW_NUMBER":"927160","EVENT_NO":"4218582","INSPECTION_BEGIN_DT":"11/20/2000","INSPECTION_END_DT":"11/30/2000","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"16","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2000-11-20"},{"SOURCE_ROW_NUMBER":"622413","EVENT_NO":"4219050","INSPECTION_BEGIN_DT":"10/18/2000","INSPECTION_END_DT":"11/14/2000","ACTIVITY_CODE":"CDB","ACTIVITY":"ACCIDENT PREVENTION SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"44.5","SUM_TOTAL_ON_SITE_HOURS":"25","sourceDate":"2000-10-18"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":14,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2001-Q3":{"hours":900,"employees":9,"production":7324},"2001-Q2":{"hours":6279,"employees":13,"production":25521},"2001-Q1":{"hours":7578,"employees":17,"production":24345},"2000-Q4":{"hours":8186,"employees":16,"production":34054},"2000-Q3":{"hours":7081,"employees":14,"production":26992},"2000-Q2":{"hours":8436,"employees":15,"production":22184},"2000-Q1":{"hours":7021,"employees":17,"production":19958}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":4,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000":{"hours":30724,"employees":16,"production":103188},"2001":{"hours":14757,"employees":13,"production":57190}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":7,"firstDate":"2000-01-10","lastDate":"2000-04-27","metrics":{"recentRows":0,"doseOver100":3,"actDoseTotal":718,"pelDoseTotal":620},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"68217","EVENT_NO":"4218517","SURVEY_DATE":"04/27/2000","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"30","MANUFACTURER_CD":"067","ACT_DOSE_85":"223","PEL_DOSE_90":"218","SURVEY_TYPE":"I","sourceDate":"2000-04-27"},{"SOURCE_ROW_NUMBER":"68216","EVENT_NO":"4218517","SURVEY_DATE":"04/27/2000","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"119","ACT_DOSE_85":"71","PEL_DOSE_90":"60","SURVEY_TYPE":"I","sourceDate":"2000-04-27"},{"SOURCE_ROW_NUMBER":"68215","EVENT_NO":"4218517","SURVEY_DATE":"04/27/2000","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"30","MANUFACTURER_CD":"067","ACT_DOSE_85":"78","PEL_DOSE_90":"55","SURVEY_TYPE":"I","sourceDate":"2000-04-27"},{"SOURCE_ROW_NUMBER":"68214","EVENT_NO":"4218517","SURVEY_DATE":"04/27/2000","OCCUPATION_CD_DESC":"MOBILE BRIDGE OPERATOR","MACHINE_CD":"08","MANUFACTURER_CD":"067","ACT_DOSE_85":"56","PEL_DOSE_90":"38","SURVEY_TYPE":"I","sourceDate":"2000-04-27"},{"SOURCE_ROW_NUMBER":"68220","EVENT_NO":"4220134","SURVEY_DATE":"01/10/2000","OCCUPATION_CD_DESC":"LABORER/BLACKSMITH","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"26","PEL_DOSE_90":"10","SURVEY_TYPE":"I","sourceDate":"2000-01-10"},{"SOURCE_ROW_NUMBER":"68219","EVENT_NO":"4220133","SURVEY_DATE":"01/10/2000","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"033","ACT_DOSE_85":"157","PEL_DOSE_90":"150","SURVEY_TYPE":"I","sourceDate":"2000-01-10"},{"SOURCE_ROW_NUMBER":"68218","EVENT_NO":"4220133","SURVEY_DATE":"01/10/2000","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"033","ACT_DOSE_85":"107","PEL_DOSE_90":"89","SURVEY_TYPE":"I","sourceDate":"2000-01-10"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":19,"firstDate":"2000-01-10","lastDate":"2001-03-22","metrics":{"recentRows":0,"voidSamples":0,"maxQuartzPct":7.7,"validSamples":19,"quartzPctTotal":101},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"39520","CASSETTE_NO":"57348646","SAMPLE_DT":"03/22/2001","QUARTZ_PCT":"06.8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-03-22"},{"SOURCE_ROW_NUMBER":"24810","CASSETTE_NO":"57348665","SAMPLE_DT":"03/22/2001","QUARTZ_PCT":"07.7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-03-22"},{"SOURCE_ROW_NUMBER":"82040","CASSETTE_NO":"57323043","SAMPLE_DT":"01/22/2001","QUARTZ_PCT":"04.5","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-01-22"},{"SOURCE_ROW_NUMBER":"28986","CASSETTE_NO":"57317142","SAMPLE_DT":"11/21/2000","QUARTZ_PCT":"04.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-11-21"},{"SOURCE_ROW_NUMBER":"85526","CASSETTE_NO":"57283172","SAMPLE_DT":"09/22/2000","QUARTZ_PCT":"04.8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-09-22"},{"SOURCE_ROW_NUMBER":"95397","CASSETTE_NO":"57270924","SAMPLE_DT":"08/25/2000","QUARTZ_PCT":"05.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-08-25"},{"SOURCE_ROW_NUMBER":"32515","CASSETTE_NO":"57270914","SAMPLE_DT":"08/25/2000","QUARTZ_PCT":"05.1","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-08-25"},{"SOURCE_ROW_NUMBER":"118566","CASSETTE_NO":"57284514","SAMPLE_DT":"07/13/2000","QUARTZ_PCT":"05.8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-07-13"},{"SOURCE_ROW_NUMBER":"77627","CASSETTE_NO":"57284496","SAMPLE_DT":"07/13/2000","QUARTZ_PCT":"05.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-07-13"},{"SOURCE_ROW_NUMBER":"15230","CASSETTE_NO":"50547162","SAMPLE_DT":"07/11/2000","QUARTZ_PCT":"04.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-07-11"},{"SOURCE_ROW_NUMBER":"146806","CASSETTE_NO":"57284278","SAMPLE_DT":"06/15/2000","QUARTZ_PCT":"06.2","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-06-15"},{"SOURCE_ROW_NUMBER":"144002","CASSETTE_NO":"57284306","SAMPLE_DT":"06/15/2000","QUARTZ_PCT":"05.8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-06-15"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":36,"firstDate":"2000-01-10","lastDate":"2001-06-13","metrics":{"ss":19,"amountDue":4130,"contested":0,"amountPaid":3452.41,"recentRows":0,"section104d":0,"unterminated":0,"proposedPenalty":4217},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"951701","VIOLATION_NO":"7498613","VIOLATION_ISSUE_DT":"06/13/2001","SIG_SUB":"Y","PART_SECTION":"77.800-1(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"09/08/2003","PROPOSED_PENALTY":"161","AMOUNT_DUE":"161","AMOUNT_PAID":"161","CONTESTED_IND":"N","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"951700","VIOLATION_NO":"7498612","VIOLATION_ISSUE_DT":"06/13/2001","SIG_SUB":"N","PART_SECTION":"75.1100-2(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/13/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"951699","VIOLATION_NO":"7498611","VIOLATION_ISSUE_DT":"06/13/2001","SIG_SUB":"N","PART_SECTION":"75.1103-8(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/13/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"951698","VIOLATION_NO":"7498610","VIOLATION_ISSUE_DT":"06/13/2001","SIG_SUB":"N","PART_SECTION":"75.362(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/13/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"951697","VIOLATION_NO":"7498609","VIOLATION_ISSUE_DT":"06/13/2001","SIG_SUB":"Y","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/19/2001","PROPOSED_PENALTY":"173","AMOUNT_DUE":"173","AMOUNT_PAID":"173","CONTESTED_IND":"N","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"951696","VIOLATION_NO":"7498606","VIOLATION_ISSUE_DT":"06/13/2001","SIG_SUB":"N","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/19/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-06-13"},{"SOURCE_ROW_NUMBER":"951695","VIOLATION_NO":"7451035","VIOLATION_ISSUE_DT":"05/03/2001","SIG_SUB":"Y","PART_SECTION":"70.100(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Highly","INJ_ILLNESS":"Permanent","NO_AFFECTED":"4","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/17/2001","PROPOSED_PENALTY":"399","AMOUNT_DUE":"399","AMOUNT_PAID":"399","CONTESTED_IND":"N","sourceDate":"2001-05-03"},{"SOURCE_ROW_NUMBER":"951689","VIOLATION_NO":"7451030","VIOLATION_ISSUE_DT":"03/12/2001","SIG_SUB":"Y","PART_SECTION":"70.100(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Highly","INJ_ILLNESS":"Permanent","NO_AFFECTED":"4","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/27/2001","PROPOSED_PENALTY":"399","AMOUNT_DUE":"399","AMOUNT_PAID":"399","CONTESTED_IND":"N","sourceDate":"2001-03-12"},{"SOURCE_ROW_NUMBER":"951682","VIOLATION_NO":"7498052","VIOLATION_ISSUE_DT":"02/22/2001","SIG_SUB":"N","PART_SECTION":"75.604(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/22/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-02-22"},{"SOURCE_ROW_NUMBER":"951681","VIOLATION_NO":"7498051","VIOLATION_ISSUE_DT":"02/22/2001","SIG_SUB":"N","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"03/20/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-02-22"},{"SOURCE_ROW_NUMBER":"951680","VIOLATION_NO":"7498042","VIOLATION_ISSUE_DT":"01/05/2001","SIG_SUB":"N","PART_SECTION":"75.807","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"01/05/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-01-05"},{"SOURCE_ROW_NUMBER":"951715","VIOLATION_NO":"7498036","VIOLATION_ISSUE_DT":"12/07/2000","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"12/07/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2000-12-07"}]}],"safety":{"href":"/api/v1/mines/1518131/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/1518131/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","heading":"Testing, examination, and maintenance of circuit breakers; procedures.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-I/section-77.800-1","part":"77","subchapter":"O","subpart":"I","id":"77.800-1","citation":"30 CFR 77.800-1","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1100-2","heading":"Quantity and location of firefighting equipment.","id":"75.1100-2","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-2","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Working sections. (1) Each working section of coal mines producing 300 tons or more per shift shall be provided with two portable fire extinguishers and 240 pounds of rock dust in bags or other suitable containers; waterlines shall extend to each section loading point and be equipped with enough fire hose to reach each working face unless the section loading point is provided with one of the following:\n\n(i) Two portable water cars; or\n\n(ii) Two portable chemical cars; or\n\n(iii) One portable water car or one portable chemical car, and either (a) a portable foam-generating machine or (b) a portable high-pressure rock-dusting machine fitted with at least 250 feet of hose and supplied with at least 60 sacks of rock dust.\n\n(2) Each working section of coal mines producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Two portable fire extinguishers; and\n\n(ii) 240 pounds of rock dust in bags or other suitable containers; and\n\n(iii) At least 500 gallons of water and at least three pails of 10-quart capacity; or a waterline with sufficient hose to reach the working places; or a portable water car of at least 500-gallons capacity; or a portable, all-purpose, dry-powder chemical car of at least 125-pounds capacity.\n\n(3) As an alternative to paragraph (a)(2) of this section, each working section with no electrical equipment at the face of an anthracite coal mine producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Portable fire extinguishers containing a total capacity of at least 30 pounds of dry chemical or 15 gallons of foam and located at the entrance to the gangway at the bottom of the slope; and\n\n(ii) Portable fire extinguishers containing a total capacity of at least 20 pounds of dry chemical or 10 gallons of foam and located within 500 feet from the working face.\n\n(b) Belt conveyors. In all coal mines, waterlines shall be installed parallel to the entire length of belt conveyors and shall be equipped with firehose outlets with valves at 300-foot intervals along each belt conveyor and at tailpieces. At least 500 feet of firehose with fittings suitable for connection with each belt conveyor waterline system shall be stored at strategic locations along the belt conveyor. Waterlines may be installed in entries adjacent to the conveyor entry belt as long as the outlets project into the belt conveyor entry.\n\n(c) Haulage tracks. (1) In mines producing 300 tons of coal or more per shift waterlines shall be installed parallel to all haulage tracks using mechanized equipment in the track or adjacent entry and shall extend to the loading point of each working section. Waterlines shall be equipped with outlet valves at intervals of not more than 500 feet, and 500 feet of firehose with fittings suitable for connection with such waterlines shall be provided at strategic locations. Two portable water cars, readily available, may be used in lieu of waterlines prescribed under this paragraph.\n\n(2) In mines producing less than 300 tons of coal per shift, there shall be provided at 500-foot intervals in all main and secondary haulage roads:\n\n(i) A tank of water of at least 55-gallon capacity with at least 3 pails of not less than 10-quart capacity; or\n\n(ii) Not less than 240 pounds of bagged rock dust.\n\n(d) Transportation. Each track or off-track locomotive, self-propelled man-trip car, or personnel carrier shall be equipped with one portable fire extinguisher.\n\n(e) Electrical installations. At each electrical installation, the operator shall provide two portable fire extinguishers that have a nominal capacity of 5 pounds of dry chemical, or one extinguisher that has a nominal capacity of at least 10 pounds of dry chemical, and which have a 2-A:10-B:C or higher rating.\n\n(f) Oil storage stations. Two portable fire extinguishers and 240 pounds of rock dust, shall be provided at each permanent underground oil storage station. One portable fire extinguisher shall be provided at each working section where 25 gallons or more of oil are stored in addition to extinguishers required under paragraph (a) of this section.\n\n(g) Welding, cutting, soldering. One portable fire extinguisher or 240 pounds of rock dust shall be provided at locations where welding, cutting, or soldering with arc or flame is being done.\n\n(h) Powerlines. At each wooden door through which powerlines pass there shall be one portable fire extinguisher or 240 pounds of rock dust within 25 feet of the door on the intake air side.\n\n(i) Emergency materials. (1) At each mine producing 300 tons of coal or more per shift there shall be readily available the following materials at locations not exceeding 2 miles from each working section:\n\n1,000 board feet of brattice boards 2 rolls of brattice cloth 2 hand saws 25 pounds of 8 d nails 25 pounds of 10 d nails 25 pounds of 16 d nails 3 claw hammers 25 bags of wood fiber plaster or 10 bags of cement (or equivalent material for stoppings) 5 tons of rock dust\n\n(2) At each mine producing less than 300 tons of coal per shift the above materials shall be available at the mine, provided, however, that the emergency materials for one or more mines may be stored at a central warehouse or building supply company and such supply must be the equivalent of that required for all mines involved and within 1-hour's delivery time from each mine. This exception shall not apply where the active working sections are more than 2 miles from the surface.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 53127, Sept. 15, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1103-8","heading":"Automatic fire sensor and warning device systems; examination and test requirements.","id":"75.1103-8","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1103-8","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Automatic fire sensor and warning device systems shall be examined at least once each shift when belts are operated as part of a production shift. A functional test of the warning signals shall be made at least once every seven days. Examination and maintenance of such systems shall be by a qualified person.\n\n(b) A record of the functional test conducted in accordance with paragraph (a) of this section shall be maintained by the operator and kept for a period of one year.\n\n(c) Sensors shall be calibrated in accordance with the manufacturer's calibration instructions at intervals not to exceed 31 days. A record of the sensor calibrations shall be maintained by the operator and kept for a period of one year.\n\n[73 FR 80615, Dec. 31, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.362","heading":"On-shift examination.","id":"75.362","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.362","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) At least once during each shift, or more often if necessary for safety, a certified person designated by the operator shall conduct an on-shift examination of each section where anyone is assigned to work during the shift and any area where mechanized mining equipment is being installed or removed during the shift. The certified person shall check for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction.\n\n(2) A person designated by the operator shall conduct an examination and record the results and the corrective actions taken to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan. In those instances when a shift change is accomplished without an interruption in production on a section, the examination shall be made anytime within 1 hour after the shift change. In those instances when there is an interruption in production during the shift change, the examination shall be made before production begins on a section. Deficiencies in dust controls shall be corrected before production begins or resumes. The examination shall include: Air quantities and velocities; water pressures and flow rates; excessive leakage in the water delivery system; water spray numbers and orientations; section ventilation and control device placement; roof bolting machine dust collector vacuum levels; scrubber air flow rate; work practices required by the ventilation plan; and any other dust suppression measures. Measurements of the air velocity and quantity, water pressure and flow rates are not required if continuous monitoring of these controls is used and indicates that the dust controls are functioning properly.\n\n(3) On-shift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(b) During each shift that coal is produced, a certified person shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section along each belt conveyor haulageway where a belt conveyor is operated. This examination may be conducted at the same time as the preshift examination of belt conveyors and belt conveyor haulageways, if the examination is conducted within 3 hours before the oncoming shift.\n\n(c) Persons conducting the on-shift examination shall determine at the following locations:\n\n(1) The volume of air in the last open crosscut of each set of entries or rooms on each section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) The volume of air on a longwall or shortwall, including areas where longwall or shortwall equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.\n\n(3) The velocity of air at each end of the longwall or shortwall face at the locations specified in the approved ventilation plan.\n\n(4) The volume of air at the intake end of any pillar line—\n\n(i) Where a single split of air is used in the intake entry furthest from the return air course immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) Where a split system is used in the intake entries of each split immediately inby the split point.\n\n(d) (1) A qualified person shall make tests for methane—\n\n(i) At the start of each shift at each working place before electrically operated equipment is energized; and\n\n(ii) Immediately before equipment is energized, taken into, or operated in a working place; and\n\n(iii) At 20-minute intervals, or more often if required in the approved ventilation plan at specific locations, during the operation of equipment in the working place.\n\n(2) Except as provided for in paragraph (d)(3) of this section, these methane tests shall be made at the face from under permanent roof support, using extendable probes or other acceptable means. When longwall or shortwall mining systems are used, these methane tests shall be made at the shearer, the plow, or the cutting head. When mining has been stopped for more than 20 minutes, methane tests shall be conducted prior to the start up of equipment.\n\n(3) As an alternative method of compliance with paragraph (d)(2) of this section during roof bolting, methane tests may be made by sweeping an area not less than 16 feet inby the last area of permanently supported roof, using a probe or other acceptable means. This method of testing is conditioned on meeting the following requirements:\n\n(i) The roof bolting machine must be equipped with an integral automated temporary roof support (ATRS) system that meets the requirements of 30 CFR 75.209.\n\n(ii) The roof bolting machine must have a permanently mounted, MSHA-approved methane monitor which meets the maintenance and calibration requirements of 30 CFR 75.342(a)(4), the warning signal requirements of 30 CFR 75.342(b), and the automatic de-energization requirements of 30 CFR 75.342(c).\n\n(iii) The methane monitor sensor must be mounted near the inby end and within 18 inches of the longitudinal center of the ATRS support, and positioned at least 12 inches from the roof when the ATRS is fully deployed.\n\n(iv) Manual methane tests must be made at intervals not exceeding 20 minutes. The test may be made either from under permanent roof support or from the roof bolter's work position protected by the deployed ATRS.\n\n(v) Once a methane test is made at the face, all subsequent methane tests in the same area of unsupported roof must also be made at the face, from under permanent roof support, using extendable probes or other acceptable means at intervals not exceeding 20 minutes.\n\n(vi) The district manager may require that the ventilation plan include the minimum air quantity and the position and placement of ventilation controls to be maintained during roof bolting.\n\n(e) If auxiliary fans and tubing are used, they shall be inspected frequently.\n\n(f) During each shift that coal is produced and at intervals not exceeding 4 hours, tests for methane shall be made by a certified person or by an atmospheric monitoring system (AMS) in each return split of air from each working section between the last working place, or longwall or shortwall face, ventilated by that split of air and the junction of the return air split with another air split, seal, or worked-out area. If auxiliary fans and tubing are used, the tests shall be made at a location outby the auxiliary fan discharge.\n\n(g) Certification. (1) The person conducting the on-shift examination in belt haulage entries shall certify by initials, date, and time that the examination was made. The certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(2) The certified person directing the on-shift examination to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan shall:\n\n(i) Certify by initials, date, and time on a board maintained at the section load-out or similar location showing that the examination was made prior to resuming production; and\n\n(ii) Verify, by initials and date, the record of the results of the examination required under (a)(2) of this section to assure compliance with the respirable dust control parameters specified in the mine ventilation plan. The verification shall be made no later than the end of the shift for which the examination was made.\n\n(3) The mine foreman or equivalent mine official shall countersign each examination record required under (a)(2) of this section after it is verified by the certified person under (g)(2)(ii) of this section, and no later than the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(4) Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 26442, May 28, 1996, as amended at 68 FR 40138, July 7, 2003; 77 FR 20715, Apr. 6, 2012; 79 FR 24987, May 1, 2014]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":3},{"chapter":"I","heading":"Respirable dust standards.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-70/subpart-B/section-70.100","part":"70","subchapter":"O","subpart":"B","id":"70.100","citation":"30 CFR 70.100","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 70—MANDATORY HEALTH STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.604","heading":"Permanent splicing of trailing cables.","id":"75.604","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.604","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"G","subpartHeading":"Subpart G—Trailing Cables","text":"[Statutory Provisions]\n\nWhen permanent splices in trailing cables are made, they shall be:\n\n(a) Mechanically strong with adequate electrical conductivity and flexibility;\n\n(b) Effectively insulated and sealed so as to exclude moisture; and\n\n(c) Vulcanized or otherwise treated with suitable materials to provide flame-resistant qualities and good bonding to the outer jacket.\n\n(d) Made using splice kits accepted or approved by MSHA as flame resistant.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 57 FR 61223, Dec. 23, 1992]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.807","heading":"Installation of high-voltage transmission cables.","id":"75.807","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-I/section-75.807","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"I","subpartHeading":"Subpart I—Underground High-Voltage Distribution","text":"[Statutory Provisions]\n\nAll underground high-voltage transmission cables shall be installed only in regularly inspected air courses and haulageways, and shall be covered, buried, or placed so as to afford protection against damage, guarded where men regularly work or pass under them unless they are 6 1/2 feet or more above the floor or rail, securely anchored, properly insulated, and guarded at ends, and covered, insulated, or placed to prevent contact with trolley wires and other low-voltage circuits.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"1518131","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}