{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"1517232","name":"Richland No 9","status":"Abandoned and Sealed","status_date":"2015-01-30","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"KY","county":"Hopkins","nearest_town":"Madisonville","operator_id":"P24534","operator_name":"Warrior Coal LLC.","controller_id":"C15455","controller_name":"Alliance Resource Partners LP","district":"C10","office":"Madisonville KY Field Office","employees":0,"latitude":37.2875,"longitude":-87.594167},"coverage":{"contributingSources":17,"registeredSources":20,"sourceRows":5259},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"1517232","name":"Richland No 9"},"operator":{"type":"operator","id":"P24534","name":"Warrior Coal LLC."},"controller":{"type":"controller","id":"C15455","name":"Alliance Resource Partners LP"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"operator_operates_mine","subject":{"type":"operator","id":"P21913","name":"Pleasant View Mining Company Inc"},"object":{"type":"mine","id":"1517232","name":"Richland No 9"},"validFrom":"1992-05-01","validTo":"2011-10-10","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1517232|P21913|1992-05-01|2011-10-10"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C13497","name":"Gary E  Peyton"},"object":{"type":"mine","id":"1517232","name":"Richland No 9"},"validFrom":"1992-05-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1517232|C13497|1992-05-01|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C13497","name":"Gary E  Peyton"},"object":{"type":"operator","id":"P21913","name":"Pleasant View Mining Company Inc"},"validFrom":"1992-05-01","validTo":"2011-10-10","current":false,"derived":true,"evidenceMineId":"1517232","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1517232|P21913|1992-05-01|C13497|1992-05-01|90142"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15455","name":"Alliance Resource Partners LP"},"object":{"type":"mine","id":"1517232","name":"Richland No 9"},"validFrom":"2001-01-27","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1517232|C15455|2001-01-27|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P24534","name":"Warrior Coal LLC."},"object":{"type":"mine","id":"1517232","name":"Richland No 9"},"validFrom":"2011-10-11","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1517232|P24534|2011-10-11|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15455","name":"Alliance Resource Partners LP"},"object":{"type":"operator","id":"P24534","name":"Warrior Coal LLC."},"validFrom":"2011-10-11","validTo":null,"current":true,"derived":true,"evidenceMineId":"1517232","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"1517232|P24534|2011-10-11|C15455|2001-01-27|95666"}}],"coverage":{"historyRecords":2,"edgeCount":6,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":102,"firstDate":"2001-11-05","lastDate":"2015-02-02","metrics":{"daysLost":1357,"injuries":93,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":2},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"48636","DOCUMENT_NO":"220150360017","ACCIDENT_DT":"02/02/2015","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman","NO_INJURIES":"1","DAYS_LOST":"39","NARRATIVE":"The employee was in an area where conveyor covers were being removed.  A cover that was not secured by the workers removing it slid down the conveyor striking the employee.","sourceDate":"2015-02-02"},{"SOURCE_ROW_NUMBER":"1343","DOCUMENT_NO":"220150020003","ACCIDENT_DT":"12/23/2014","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDTOOLS (NONPOWERED)","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Scoop tram operator, Load/Haul/Dump operator","NO_INJURIES":"1","DAYS_LOST":"129","NARRATIVE":"While pulling feeder to outside FM xc2 making the turn at xc1 slop[e bottom. The feeder slid to corner of rib causing the chain to break striking EE on forehead toward right eye. A laceration of about 1.5 inches was treated by MET and was transported to RMC.","sourceDate":"2014-12-23"},{"SOURCE_ROW_NUMBER":"272296","DOCUMENT_NO":"220150270001","ACCIDENT_DT":"12/16/2014","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"A rock fall occurred on No. 1 unit on 5th East Main at spad No. 15 + 50 in No. 3 Entry Intersection. 18 ft wide, 22ft in length and 8 ft high. The area is dangered off and cribs installed and barricaded off. Additional cribs are also installed across face and all three entries & crosscuts 15 + 50.","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"233627","DOCUMENT_NO":"220150270002","ACCIDENT_DT":"12/12/2014","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"A roof fall occurred on No. 1 unit on 5th East Main at spad No. 15 + 50 in No. 1 Entry last open intersection. 18 ft wide by 35 ft long by 8 ft high. the area is dangered off and cribs installed and barricaded off. No equipment involved.","sourceDate":"2014-12-12"},{"SOURCE_ROW_NUMBER":"22851","DOCUMENT_NO":"220141600006","ACCIDENT_DT":"05/28/2014","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"ELECTRICAL","ACCIDENT_TYPE":"Contact with electrical current","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee was \"squaring up\" pinner into No 3 right x-cut with the side control tram levers when pinner shocked him and lost power. Investigators discovered a grounded cable on the reel and ineffective insulated tram lever control covers due to age and wear contributed to employee receiving shock.","sourceDate":"2014-05-28"},{"SOURCE_ROW_NUMBER":"259532","DOCUMENT_NO":"220141470008","ACCIDENT_DT":"05/14/2014","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"INUNDATION","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"An inundation of water occurred on the No. 1 unit in the No. 2 entry at x-cut left of MMU-005-0 section at spad No. 11 + 09. The working section is presently under a 103-K order issued by MSHA on 5/14/14 at 0036 hour.","sourceDate":"2014-05-14"},{"SOURCE_ROW_NUMBER":"100085","DOCUMENT_NO":"220132660011","ACCIDENT_DT":"09/09/2013","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"11","NARRATIVE":"Employee stated he was struck across bridge of his nose by roof bolter's trailing cable, causing fracture to his nose requiring surgery to his nasal system on 9-16-13 --- Employee started missing work on 9-16-13.","sourceDate":"2013-09-09"},{"SOURCE_ROW_NUMBER":"156244","DOCUMENT_NO":"220132380006","ACCIDENT_DT":"08/12/2013","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDTOOLS (NONPOWERED)","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Laborer, Bull gang,  Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"EE stated he was building a concrete block ventilation stopping. Cut a steel band with hammer that was holding block onto a pallet. When the band was cut one end came up and struck EE's right hand causing a laceration requiring six stitches.","sourceDate":"2013-08-12"},{"SOURCE_ROW_NUMBER":"100084","DOCUMENT_NO":"220131650006","ACCIDENT_DT":"06/04/2013","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck against stationary object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee stated he was loading 8 foot cable bolts onto the double boom roof bolter...struck his left forearm against an overhead roof bolt plate causing a laceration requiring 15 stitches...employee did not miss any work.","sourceDate":"2013-06-04"},{"SOURCE_ROW_NUMBER":"156242","DOCUMENT_NO":"220130370001","ACCIDENT_DT":"01/29/2013","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee stated he was operating opposite double boom roof bolter drilling a one inch into the roof, piece of draw rock fell from roof. Reposition drill steel when up pressure was applied the drill steel snapped in two striking employee over his right eye brow.","sourceDate":"2013-01-29"},{"SOURCE_ROW_NUMBER":"212109","DOCUMENT_NO":"220123460002","ACCIDENT_DT":"11/30/2012","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDTOOLS (NONPOWERED)","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Stopping builder, Ventilation man, Mason man, Overcast","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee stated while building a concrete stopping he was in the process of splitting a block when he struck his right forearm against a steel band...causing small laceration requiring nine stitches...no lost time","sourceDate":"2012-11-30"},{"SOURCE_ROW_NUMBER":"190520","DOCUMENT_NO":"220122510010","ACCIDENT_DT":"08/27/2012","DEGREE_INJURY":"PERM TOT OR PERM PRTL DISABLTY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Caught in, under or between NEC","OCCUPATION":"Pumper","NO_INJURIES":"1","DAYS_LOST":"34","NARRATIVE":"EE stated he was unwinding a spool of elec. cable. Reel was suspended from the roof cable became fouled causing reel to swing back towards EE's face he threw up his right arm to catch reel when his ring finger was caught by the chain holding the cable reel and severing the end of his ring finger back to the first joint.","sourceDate":"2012-08-27"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2015-01-30","lastDate":"2015-01-30","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":1240,"firstDate":"2001-10-10","lastDate":"2015-01-21","metrics":{"ss":381,"delinquent":1233,"recentRows":0,"paidPenalty":446167,"proposedPenalty":626922,"currentAssessment":446281},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1560126","VIOLATION_NO":"9041761","ISSUE_DT":"01/21/2015","CFR_STANDARD_CD":"50.20(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-01-21"},{"SOURCE_ROW_NUMBER":"1560125","VIOLATION_NO":"9041760","ISSUE_DT":"01/21/2015","CFR_STANDARD_CD":"50.20(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-01-21"},{"SOURCE_ROW_NUMBER":"1560127","VIOLATION_NO":"9041828","ISSUE_DT":"01/07/2015","CFR_STANDARD_CD":"75.1725(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"745.00","CURRENT_ASSESSMENT_AMT":"745.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2015-01-07"},{"SOURCE_ROW_NUMBER":"1557558","VIOLATION_NO":"8515769","ISSUE_DT":"12/16/2014","CFR_STANDARD_CD":"75.223(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"499.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"1557091","VIOLATION_NO":"9041479","ISSUE_DT":"12/10/2014","CFR_STANDARD_CD":"75.1731(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"138.00","CURRENT_ASSESSMENT_AMT":"138.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-12-10"},{"SOURCE_ROW_NUMBER":"1557090","VIOLATION_NO":"9041096","ISSUE_DT":"12/03/2014","CFR_STANDARD_CD":"75.202(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"745.00","CURRENT_ASSESSMENT_AMT":"745.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-12-03"},{"SOURCE_ROW_NUMBER":"1557089","VIOLATION_NO":"9041095","ISSUE_DT":"11/25/2014","CFR_STANDARD_CD":"75.362(g)(2)(i)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"1304.00","CURRENT_ASSESSMENT_AMT":"1304.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-11-25"},{"SOURCE_ROW_NUMBER":"1557088","VIOLATION_NO":"9041094","ISSUE_DT":"11/25/2014","CFR_STANDARD_CD":"75.360(b)(3)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"1304.00","CURRENT_ASSESSMENT_AMT":"499.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-11-25"},{"SOURCE_ROW_NUMBER":"1557087","VIOLATION_NO":"9041093","ISSUE_DT":"11/25/2014","CFR_STANDARD_CD":"75.402","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"946.00","CURRENT_ASSESSMENT_AMT":"946.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-11-25"},{"SOURCE_ROW_NUMBER":"1557086","VIOLATION_NO":"9041092","ISSUE_DT":"11/25/2014","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"1530.00","CURRENT_ASSESSMENT_AMT":"1530.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-11-25"},{"SOURCE_ROW_NUMBER":"1557085","VIOLATION_NO":"9041091","ISSUE_DT":"11/25/2014","CFR_STANDARD_CD":"75.1722(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"334.00","CURRENT_ASSESSMENT_AMT":"334.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-11-25"},{"SOURCE_ROW_NUMBER":"1557094","VIOLATION_NO":"9041566","ISSUE_DT":"11/21/2014","CFR_STANDARD_CD":"75.403","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"243.00","CURRENT_ASSESSMENT_AMT":"243.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2014-11-21"}]},{"id":"msha-civil-penalty-dockets-decisions","name":"Civil Penalty Dockets and Decisions","domains":["compliance","legal"],"products":["docket lineage","decision outcomes","citation packet precedent"],"rowCount":413,"firstDate":"2008-02-11","lastDate":"2016-06-21","metrics":{"appeals":0,"decisions":413,"recentRows":0,"decisionPenalty":198664,"originalPenalty":387790},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"375680","VIOLATION_NO":"8515769","DOCKET_NO":"KENT 2015-0637","DECISION_DT":"06/21/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"499.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2016-06-21"},{"SOURCE_ROW_NUMBER":"116414","VIOLATION_NO":"9041828","DOCKET_NO":"KENT 2015-0637","DECISION_DT":"06/21/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"745.00","DECISION_PENALTY_AMT":"745.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2016-06-21"},{"SOURCE_ROW_NUMBER":"374934","VIOLATION_NO":"9041096","DOCKET_NO":"KENT 2015-0645","DECISION_DT":"06/07/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"745.00","DECISION_PENALTY_AMT":"745.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2016-06-07"},{"SOURCE_ROW_NUMBER":"374746","VIOLATION_NO":"9041094","DOCKET_NO":"KENT 2015-0645","DECISION_DT":"06/07/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1304.00","DECISION_PENALTY_AMT":"499.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2016-06-07"},{"SOURCE_ROW_NUMBER":"374709","VIOLATION_NO":"9041562","DOCKET_NO":"KENT 2015-0645","DECISION_DT":"06/07/2016","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"745.00","DECISION_PENALTY_AMT":"745.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2016-06-07"},{"SOURCE_ROW_NUMBER":"371893","VIOLATION_NO":"9041235","DOCKET_NO":"KENT 2015-0448","DECISION_DT":"11/13/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"946.00","DECISION_PENALTY_AMT":"662.00","JUDGE_FIRST_NAME":"L","JUDGE_LAST_NAME":"Gill","sourceDate":"2015-11-13"},{"SOURCE_ROW_NUMBER":"354257","VIOLATION_NO":"8510468","DOCKET_NO":"KENT 2014-0242","DECISION_DT":"08/28/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"2901.00","DECISION_PENALTY_AMT":"1800.00","JUDGE_FIRST_NAME":"Jacqueline","JUDGE_LAST_NAME":"Bulluck","sourceDate":"2015-08-28"},{"SOURCE_ROW_NUMBER":"103932","VIOLATION_NO":"8513927","DOCKET_NO":"KENT 2014-0242","DECISION_DT":"08/28/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1203.00","DECISION_PENALTY_AMT":"1000.00","JUDGE_FIRST_NAME":"Jacqueline","JUDGE_LAST_NAME":"Bulluck","sourceDate":"2015-08-28"},{"SOURCE_ROW_NUMBER":"363596","VIOLATION_NO":"4068579","DOCKET_NO":"KENT 2014-0787","DECISION_DT":"07/01/2015","DECISION_TYPE_CODE_DESC":"Dismissal","ORIGINAL_PENALTY_AMT":"946.00","DECISION_PENALTY_AMT":"946.00","JUDGE_FIRST_NAME":"Kenneth","JUDGE_LAST_NAME":"Andrews","sourceDate":"2015-07-01"},{"SOURCE_ROW_NUMBER":"363595","VIOLATION_NO":"4063059","DOCKET_NO":"KENT 2014-0787","DECISION_DT":"07/01/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"634.00","DECISION_PENALTY_AMT":"262.00","JUDGE_FIRST_NAME":"Kenneth","JUDGE_LAST_NAME":"Andrews","sourceDate":"2015-07-01"},{"SOURCE_ROW_NUMBER":"363030","VIOLATION_NO":"4063057","DOCKET_NO":"KENT 2014-0787","DECISION_DT":"07/01/2015","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"634.00","DECISION_PENALTY_AMT":"262.00","JUDGE_FIRST_NAME":"Kenneth","JUDGE_LAST_NAME":"Andrews","sourceDate":"2015-07-01"},{"SOURCE_ROW_NUMBER":"366175","VIOLATION_NO":"8506236","DOCKET_NO":"KENT 2015-0110","DECISION_DT":"06/30/2015","DECISION_TYPE_CODE_DESC":"Withdrawal","ORIGINAL_PENALTY_AMT":"3405.00","DECISION_PENALTY_AMT":"0.00","JUDGE_FIRST_NAME":"Jacqueline","JUDGE_LAST_NAME":"Bulluck","sourceDate":"2015-06-30"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":887,"firstDate":"2000-11-07","lastDate":"2014-11-21","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":84,"validSamples":803,"maxConcentration":11.142,"concentrationTotal":602.169},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1273349","CASS_NUM":"51311808","SMP_TAKEN_DT":"11/21/2014","CONC":".375","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-11-21"},{"SOURCE_ROW_NUMBER":"1184958","CASS_NUM":"51311930","SMP_TAKEN_DT":"11/20/2014","CONC":".372","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-11-20"},{"SOURCE_ROW_NUMBER":"655373","CASS_NUM":"51311908","SMP_TAKEN_DT":"11/19/2014","CONC":".545","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-11-19"},{"SOURCE_ROW_NUMBER":"239535","CASS_NUM":"51311907","SMP_TAKEN_DT":"11/18/2014","CONC":".214","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-11-18"},{"SOURCE_ROW_NUMBER":"1489367","CASS_NUM":"51311708","SMP_TAKEN_DT":"11/17/2014","CONC":".365","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-11-17"},{"SOURCE_ROW_NUMBER":"450601","CASS_NUM":"51311890","SMP_TAKEN_DT":"10/24/2014","CONC":".627","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-10-24"},{"SOURCE_ROW_NUMBER":"1599580","CASS_NUM":"58173253","SMP_TAKEN_DT":"10/23/2014","CONC":".434","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-10-23"},{"SOURCE_ROW_NUMBER":"1183582","CASS_NUM":"58173236","SMP_TAKEN_DT":"10/23/2014","CONC":".211","SMP_TYPE_CD_DESC":"INTAKE AIR","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-10-23"},{"SOURCE_ROW_NUMBER":"954791","CASS_NUM":"58172895","SMP_TAKEN_DT":"10/23/2014","CONC":".665","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-10-23"},{"SOURCE_ROW_NUMBER":"537689","CASS_NUM":"58173239","SMP_TAKEN_DT":"10/23/2014","CONC":".586","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-10-23"},{"SOURCE_ROW_NUMBER":"360818","CASS_NUM":"58172945","SMP_TAKEN_DT":"10/23/2014","CONC":".288","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-10-23"},{"SOURCE_ROW_NUMBER":"276316","CASS_NUM":"58172996","SMP_TAKEN_DT":"10/23/2014","CONC":".463","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2014-10-23"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":181,"firstDate":"2002-08-06","lastDate":"2015-08-28","metrics":{"linkedIssuances":181},"periods":{},"recentRecords":[]},{"id":"msha-contested-violations","name":"Contested Violations","domains":["compliance","legal"],"products":["contest status","time to resolution","contested-rate context"],"rowCount":413,"firstDate":"2007-05-01","lastDate":"2015-01-07","metrics":{"decisions":413,"ssChanged":38,"recentRows":0,"decisionPenalty":198664,"proposedPenalty":387790},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"375094","CITATION_NO":"9041828","CITATION_ISSUE_DT":"01/07/2015","DOCKET_NO":"KENT 2015-0637","DECISION_DT":"06/21/2016","CFR_STANDARD_CODE":"75.1725(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"745.00","DECISION_PENALTY_AMT":"745.00","sourceDate":"2015-01-07"},{"SOURCE_ROW_NUMBER":"320686","CITATION_NO":"8515769","CITATION_ISSUE_DT":"12/16/2014","DOCKET_NO":"KENT 2015-0637","DECISION_DT":"06/21/2016","CFR_STANDARD_CODE":"75.223(a)(1)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"499.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"90593","CITATION_NO":"9041096","CITATION_ISSUE_DT":"12/03/2014","DOCKET_NO":"KENT 2015-0645","DECISION_DT":"06/07/2016","CFR_STANDARD_CODE":"75.202(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"745.00","DECISION_PENALTY_AMT":"745.00","sourceDate":"2014-12-03"},{"SOURCE_ROW_NUMBER":"379189","CITATION_NO":"9041094","CITATION_ISSUE_DT":"11/25/2014","DOCKET_NO":"KENT 2015-0645","DECISION_DT":"06/07/2016","CFR_STANDARD_CODE":"75.360(b)(3)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"1304.00","DECISION_PENALTY_AMT":"499.00","sourceDate":"2014-11-25"},{"SOURCE_ROW_NUMBER":"90509","CITATION_NO":"9041562","CITATION_ISSUE_DT":"11/13/2014","DOCKET_NO":"KENT 2015-0645","DECISION_DT":"06/07/2016","CFR_STANDARD_CODE":"75.202(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"745.00","DECISION_PENALTY_AMT":"745.00","sourceDate":"2014-11-13"},{"SOURCE_ROW_NUMBER":"264368","CITATION_NO":"9041235","CITATION_ISSUE_DT":"08/28/2014","DOCKET_NO":"KENT 2015-0448","DECISION_DT":"11/13/2015","CFR_STANDARD_CODE":"75.1725(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"946.00","DECISION_PENALTY_AMT":"662.00","sourceDate":"2014-08-28"},{"SOURCE_ROW_NUMBER":"377221","CITATION_NO":"8506236","CITATION_ISSUE_DT":"07/07/2014","DOCKET_NO":"KENT 2015-0110","DECISION_DT":"06/30/2015","CFR_STANDARD_CODE":"75.362(a)(2)","ORIGINAL_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"3405.00","DECISION_PENALTY_AMT":".00","sourceDate":"2014-07-07"},{"SOURCE_ROW_NUMBER":"320546","CITATION_NO":"8506235","CITATION_ISSUE_DT":"07/07/2014","DOCKET_NO":"KENT 2015-0110","DECISION_DT":"06/30/2015","CFR_STANDARD_CODE":"72.630(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"3405.00","DECISION_PENALTY_AMT":"2900.00","sourceDate":"2014-07-07"},{"SOURCE_ROW_NUMBER":"430411","CITATION_NO":"8515610","CITATION_ISSUE_DT":"06/05/2014","DOCKET_NO":"KENT 2014-0713","DECISION_DT":"03/19/2015","CFR_STANDARD_CODE":"75.1910(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"807.00","DECISION_PENALTY_AMT":"807.00","sourceDate":"2014-06-05"},{"SOURCE_ROW_NUMBER":"429616","CITATION_NO":"8515568","CITATION_ISSUE_DT":"05/29/2014","DOCKET_NO":"KENT 2014-0713","DECISION_DT":"03/19/2015","CFR_STANDARD_CODE":"75.605","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"3996.00","DECISION_PENALTY_AMT":"3996.00","sourceDate":"2014-05-29"},{"SOURCE_ROW_NUMBER":"146967","CITATION_NO":"8515567","CITATION_ISSUE_DT":"05/29/2014","DOCKET_NO":"KENT 2014-0713","DECISION_DT":"03/19/2015","CFR_STANDARD_CODE":"75.512","ORIGINAL_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"5080.00","DECISION_PENALTY_AMT":".00","sourceDate":"2014-05-29"},{"SOURCE_ROW_NUMBER":"261696","CITATION_NO":"4063057","CITATION_ISSUE_DT":"02/04/2014","DOCKET_NO":"KENT 2014-0787","DECISION_DT":"07/01/2015","CFR_STANDARD_CODE":"75.1725(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"634.00","DECISION_PENALTY_AMT":"262.00","sourceDate":"2014-02-04"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":203,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":2,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":42,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":2,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":2,"firstDate":"1992-05-01","lastDate":"2011-10-11","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":1},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":174,"firstDate":"2000-01-11","lastDate":"2015-05-20","metrics":{"inspectors":502,"recentRows":0,"onSiteHours":9167.5,"inspectionHours":12768.25,"inspectionSamples":886},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"931160","EVENT_NO":"4489456","INSPECTION_BEGIN_DT":"05/20/2015","INSPECTION_END_DT":"05/20/2015","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"2.5","SUM_TOTAL_ON_SITE_HOURS":".5","sourceDate":"2015-05-20"},{"SOURCE_ROW_NUMBER":"1041647","EVENT_NO":"4489489","INSPECTION_BEGIN_DT":"01/05/2015","INSPECTION_END_DT":"03/31/2015","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"4","SUM_TOTAL_INSP_HOURS":"33","SUM_TOTAL_ON_SITE_HOURS":"25.5","sourceDate":"2015-01-05"},{"SOURCE_ROW_NUMBER":"169004","EVENT_NO":"4488557","INSPECTION_BEGIN_DT":"12/24/2014","INSPECTION_END_DT":"01/07/2015","ACTIVITY_CODE":"E07","ACTIVITY":"Non-Fatal Accident Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"23","SUM_TOTAL_ON_SITE_HOURS":"6.5","sourceDate":"2014-12-24"},{"SOURCE_ROW_NUMBER":"1048481","EVENT_NO":"4489089","INSPECTION_BEGIN_DT":"12/16/2014","INSPECTION_END_DT":"12/18/2014","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"11.5","SUM_TOTAL_ON_SITE_HOURS":"7","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"496736","EVENT_NO":"4489087","INSPECTION_BEGIN_DT":"12/15/2014","INSPECTION_END_DT":"12/15/2014","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10","SUM_TOTAL_ON_SITE_HOURS":"8","sourceDate":"2014-12-15"},{"SOURCE_ROW_NUMBER":"456458","EVENT_NO":"4488895","INSPECTION_BEGIN_DT":"10/01/2014","INSPECTION_END_DT":"12/22/2014","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"11","SUM_TOTAL_INSP_HOURS":"273","SUM_TOTAL_ON_SITE_HOURS":"207.5","sourceDate":"2014-10-01"},{"SOURCE_ROW_NUMBER":"112443","EVENT_NO":"4488984","INSPECTION_BEGIN_DT":"07/08/2014","INSPECTION_END_DT":"07/08/2014","ACTIVITY_CODE":"E03","ACTIVITY":"103 (g) Written Notification Hazard Complaint Inspectio","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5.75","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2014-07-08"},{"SOURCE_ROW_NUMBER":"420475","EVENT_NO":"4488982","INSPECTION_BEGIN_DT":"07/01/2014","INSPECTION_END_DT":"09/29/2014","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"12","SUM_TOTAL_INSP_HOURS":"295","SUM_TOTAL_ON_SITE_HOURS":"222","sourceDate":"2014-07-01"},{"SOURCE_ROW_NUMBER":"75386","EVENT_NO":"4488827","INSPECTION_BEGIN_DT":"05/28/2014","INSPECTION_END_DT":"06/23/2014","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"59.5","SUM_TOTAL_ON_SITE_HOURS":"33.25","sourceDate":"2014-05-28"},{"SOURCE_ROW_NUMBER":"71036","EVENT_NO":"4489013","INSPECTION_BEGIN_DT":"05/14/2014","INSPECTION_END_DT":"05/27/2014","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"27.5","SUM_TOTAL_ON_SITE_HOURS":"21.5","sourceDate":"2014-05-14"},{"SOURCE_ROW_NUMBER":"207","EVENT_NO":"4488921","INSPECTION_BEGIN_DT":"04/01/2014","INSPECTION_END_DT":"06/30/2014","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"9","SUM_TOTAL_INSP_HOURS":"244","SUM_TOTAL_ON_SITE_HOURS":"180","sourceDate":"2014-04-01"},{"SOURCE_ROW_NUMBER":"1054524","EVENT_NO":"4489005","INSPECTION_BEGIN_DT":"03/27/2014","INSPECTION_END_DT":"03/27/2014","ACTIVITY_CODE":"E20","ACTIVITY":"Roof Control Technical Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8.5","SUM_TOTAL_ON_SITE_HOURS":"7","sourceDate":"2014-03-27"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":164,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2015-Q1":{"hours":4646,"employees":22,"production":0},"2014-Q4":{"hours":41333,"employees":60,"production":69325},"2014-Q3":{"hours":51355,"employees":74,"production":183289},"2014-Q2":{"hours":50070,"employees":77,"production":148161},"2014-Q1":{"hours":53640,"employees":74,"production":183239},"2013-Q4":{"hours":35891,"employees":68,"production":116203},"2013-Q3":{"hours":49935,"employees":69,"production":189835},"2013-Q2":{"hours":45132,"employees":73,"production":182234},"2013-Q1":{"hours":46773,"employees":71,"production":202639},"2012-Q4":{"hours":45534,"employees":68,"production":195673},"2012-Q3":{"hours":42478,"employees":62,"production":169057},"2012-Q2":{"hours":40750,"employees":61,"production":176155}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":33,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2006":{"hours":111208,"employees":48,"production":364279},"2007":{"hours":113193,"employees":51,"production":463007},"2008":{"hours":111131,"employees":49,"production":370016},"2009":{"hours":131712,"employees":68,"production":337812},"2010":{"hours":46650,"employees":23,"production":55786},"2011":{"hours":62782,"employees":34,"production":45069},"2012":{"hours":169632,"employees":63,"production":640335},"2013":{"hours":177731,"employees":70,"production":690911},"2014":{"hours":196398,"employees":71,"production":584014},"2015":{"hours":4646,"employees":22,"production":0}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":101,"firstDate":"2004-08-16","lastDate":"2014-09-25","metrics":{"recentRows":0,"doseOver100":14,"actDoseTotal":6132,"pelDoseTotal":4270},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"58506","EVENT_NO":"4488982","SURVEY_DATE":"09/25/2014","OCCUPATION_CD_DESC":"SUPERINTENDENT","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"2","PEL_DOSE_90":"1","SURVEY_TYPE":"I","sourceDate":"2014-09-25"},{"SOURCE_ROW_NUMBER":"58505","EVENT_NO":"4488982","SURVEY_DATE":"09/25/2014","OCCUPATION_CD_DESC":"HIGHLIFT OPERATOR/FRONT END LOADER","MACHINE_CD":"18","MANUFACTURER_CD":"119","ACT_DOSE_85":"19","PEL_DOSE_90":"9","SURVEY_TYPE":"I","sourceDate":"2014-09-25"},{"SOURCE_ROW_NUMBER":"58504","EVENT_NO":"4488982","SURVEY_DATE":"09/25/2014","OCCUPATION_CD_DESC":"HIGHLIFT OPERATOR/FRONT END LOADER","MACHINE_CD":"18","MANUFACTURER_CD":"018","ACT_DOSE_85":"50","PEL_DOSE_90":"27","SURVEY_TYPE":"I","sourceDate":"2014-09-25"},{"SOURCE_ROW_NUMBER":"58493","EVENT_NO":"4488886","SURVEY_DATE":"03/11/2014","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"040","ACT_DOSE_85":"67","PEL_DOSE_90":"39","SURVEY_TYPE":"I","sourceDate":"2014-03-11"},{"SOURCE_ROW_NUMBER":"58492","EVENT_NO":"4488886","SURVEY_DATE":"03/11/2014","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"040","ACT_DOSE_85":"120","PEL_DOSE_90":"104","SURVEY_TYPE":"I","sourceDate":"2014-03-11"},{"SOURCE_ROW_NUMBER":"58491","EVENT_NO":"4488886","SURVEY_DATE":"03/11/2014","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"91","PEL_DOSE_90":"57","SURVEY_TYPE":"I","sourceDate":"2014-03-11"},{"SOURCE_ROW_NUMBER":"58490","EVENT_NO":"4488886","SURVEY_DATE":"03/11/2014","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"91","PEL_DOSE_90":"57","SURVEY_TYPE":"I","sourceDate":"2014-03-11"},{"SOURCE_ROW_NUMBER":"58489","EVENT_NO":"4488886","SURVEY_DATE":"03/11/2014","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"122","PEL_DOSE_90":"103","SURVEY_TYPE":"I","sourceDate":"2014-03-11"},{"SOURCE_ROW_NUMBER":"58498","EVENT_NO":"4488886","SURVEY_DATE":"02/24/2014","OCCUPATION_CD_DESC":"SAFETY DIRECTOR","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"12","PEL_DOSE_90":"7","SURVEY_TYPE":"I","sourceDate":"2014-02-24"},{"SOURCE_ROW_NUMBER":"58497","EVENT_NO":"4488886","SURVEY_DATE":"02/24/2014","OCCUPATION_CD_DESC":"PUMPER","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"18","PEL_DOSE_90":"7","SURVEY_TYPE":"I","sourceDate":"2014-02-24"},{"SOURCE_ROW_NUMBER":"58496","EVENT_NO":"4488886","SURVEY_DATE":"02/24/2014","OCCUPATION_CD_DESC":"LABORER","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"9","PEL_DOSE_90":"2","SURVEY_TYPE":"I","sourceDate":"2014-02-24"},{"SOURCE_ROW_NUMBER":"58495","EVENT_NO":"4488886","SURVEY_DATE":"02/24/2014","OCCUPATION_CD_DESC":"BELT MAN/CONVEYOR MAN","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"26","PEL_DOSE_90":"9","SURVEY_TYPE":"I","sourceDate":"2014-02-24"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":41,"firstDate":"2004-10-19","lastDate":"2014-10-23","metrics":{"recentRows":0,"voidSamples":0,"maxQuartzPct":3.8,"validSamples":41,"quartzPctTotal":82.9},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"164457","CASSETTE_NO":"58172895","SAMPLE_DT":"10/23/2014","QUARTZ_PCT":"02.1","QUARTZ_MICROGRAMS":"13","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-10-23"},{"SOURCE_ROW_NUMBER":"153263","CASSETTE_NO":"58193190","SAMPLE_DT":"10/22/2014","QUARTZ_PCT":"03.8","QUARTZ_MICROGRAMS":"35","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-10-22"},{"SOURCE_ROW_NUMBER":"9066","CASSETTE_NO":"58192884","SAMPLE_DT":"08/20/2014","QUARTZ_PCT":"01.9","QUARTZ_MICROGRAMS":"8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-08-20"},{"SOURCE_ROW_NUMBER":"167200","CASSETTE_NO":"58154252","SAMPLE_DT":"04/22/2014","QUARTZ_PCT":"02.4","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-04-22"},{"SOURCE_ROW_NUMBER":"43085","CASSETTE_NO":"58154569","SAMPLE_DT":"04/22/2014","QUARTZ_PCT":"02.8","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-04-22"},{"SOURCE_ROW_NUMBER":"102082","CASSETTE_NO":"58154974","SAMPLE_DT":"03/11/2014","QUARTZ_PCT":"02.2","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-03-11"},{"SOURCE_ROW_NUMBER":"49943","CASSETTE_NO":"58154790","SAMPLE_DT":"02/12/2014","QUARTZ_PCT":"01.9","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2014-02-12"},{"SOURCE_ROW_NUMBER":"150369","CASSETTE_NO":"58136439","SAMPLE_DT":"12/11/2013","QUARTZ_PCT":"02.2","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2013-12-11"},{"SOURCE_ROW_NUMBER":"116307","CASSETTE_NO":"58136459","SAMPLE_DT":"12/11/2013","QUARTZ_PCT":"02.4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2013-12-11"},{"SOURCE_ROW_NUMBER":"42063","CASSETTE_NO":"58136271","SAMPLE_DT":"11/25/2013","QUARTZ_PCT":"02.2","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2013-11-25"},{"SOURCE_ROW_NUMBER":"20563","CASSETTE_NO":"58136187","SAMPLE_DT":"11/25/2013","QUARTZ_PCT":"02.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2013-11-25"},{"SOURCE_ROW_NUMBER":"52828","CASSETTE_NO":"58134189","SAMPLE_DT":"09/12/2013","QUARTZ_PCT":"00.9","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2013-09-12"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":1261,"firstDate":"2001-10-10","lastDate":"2015-01-21","metrics":{"ss":384,"amountDue":446281,"contested":369,"amountPaid":446167,"recentRows":0,"section104d":10,"unterminated":5,"proposedPenalty":626922},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"874404","VIOLATION_NO":"9041761","VIOLATION_ISSUE_DT":"01/21/2015","SIG_SUB":"N","PART_SECTION":"50.20(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/21/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-01-21"},{"SOURCE_ROW_NUMBER":"874403","VIOLATION_NO":"9041760","VIOLATION_ISSUE_DT":"01/21/2015","SIG_SUB":"N","PART_SECTION":"50.20(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/21/2015","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2015-01-21"},{"SOURCE_ROW_NUMBER":"874405","VIOLATION_NO":"9041828","VIOLATION_ISSUE_DT":"01/07/2015","SIG_SUB":"Y","PART_SECTION":"75.1725(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/07/2015","PROPOSED_PENALTY":"745","AMOUNT_DUE":"745","AMOUNT_PAID":"745","CONTESTED_IND":"N","sourceDate":"2015-01-07"},{"SOURCE_ROW_NUMBER":"875376","VIOLATION_NO":"8515905","VIOLATION_ISSUE_DT":"12/29/2014","PART_SECTION":"75.1403","CIT_ORD_SAFE":"Safeguard","NO_AFFECTED":"0","TERMINATION_DT":"01/07/2015","CONTESTED_IND":"N","sourceDate":"2014-12-29"},{"SOURCE_ROW_NUMBER":"875375","VIOLATION_NO":"8515769","VIOLATION_ISSUE_DT":"12/16/2014","SIG_SUB":"N","PART_SECTION":"75.223(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"12/17/2014","PROPOSED_PENALTY":"499","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"875374","VIOLATION_NO":"8515768","VIOLATION_ISSUE_DT":"12/16/2014","CIT_ORD_SAFE":"Order","NO_AFFECTED":"0","TERMINATION_DT":"12/17/2014","CONTESTED_IND":"N","sourceDate":"2014-12-16"},{"SOURCE_ROW_NUMBER":"875373","VIOLATION_NO":"8515766","VIOLATION_ISSUE_DT":"12/15/2014","CIT_ORD_SAFE":"Order","NO_AFFECTED":"0","TERMINATION_DT":"12/15/2014","CONTESTED_IND":"N","sourceDate":"2014-12-15"},{"SOURCE_ROW_NUMBER":"875212","VIOLATION_NO":"9041479","VIOLATION_ISSUE_DT":"12/10/2014","SIG_SUB":"N","PART_SECTION":"75.1731(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"12/10/2014","PROPOSED_PENALTY":"138","AMOUNT_DUE":"138","AMOUNT_PAID":"138","CONTESTED_IND":"N","sourceDate":"2014-12-10"},{"SOURCE_ROW_NUMBER":"875211","VIOLATION_NO":"9041096","VIOLATION_ISSUE_DT":"12/03/2014","SIG_SUB":"Y","PART_SECTION":"75.202(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"12/03/2014","PROPOSED_PENALTY":"745","AMOUNT_DUE":"745","AMOUNT_PAID":"745","CONTESTED_IND":"N","sourceDate":"2014-12-03"},{"SOURCE_ROW_NUMBER":"875210","VIOLATION_NO":"9041095","VIOLATION_ISSUE_DT":"11/25/2014","SIG_SUB":"N","PART_SECTION":"75.362(g)(2)(i)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"10","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"11/25/2014","PROPOSED_PENALTY":"1304","AMOUNT_DUE":"1304","AMOUNT_PAID":"1304","CONTESTED_IND":"N","sourceDate":"2014-11-25"},{"SOURCE_ROW_NUMBER":"875209","VIOLATION_NO":"9041094","VIOLATION_ISSUE_DT":"11/25/2014","SIG_SUB":"N","PART_SECTION":"75.360(b)(3)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"4","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"12/02/2014","PROPOSED_PENALTY":"1304","AMOUNT_DUE":"499","AMOUNT_PAID":"499","CONTESTED_IND":"N","sourceDate":"2014-11-25"},{"SOURCE_ROW_NUMBER":"875208","VIOLATION_NO":"9041093","VIOLATION_ISSUE_DT":"11/25/2014","SIG_SUB":"N","PART_SECTION":"75.402","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"8","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"11/25/2014","PROPOSED_PENALTY":"946","AMOUNT_DUE":"946","AMOUNT_PAID":"946","CONTESTED_IND":"N","sourceDate":"2014-11-25"}]}],"safety":{"href":"/api/v1/mines/1517232/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/1517232/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","heading":"Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-I/part-50/subpart-C/section-50.20","part":"50","subchapter":"I","subpart":"C","id":"50.20","citation":"30 CFR 50.20","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER I—ACCIDENTS, INJURIES, ILLNESSES, EMPLOYMENT, AND PRODUCTION IN MINES","partHeading":"PART 50—NOTIFICATION, INVESTIGATION, REPORTS AND RECORDS OF ACCIDENTS, INJURIES, ILLNESSES, EMPLOYMENT, AND COAL PRODUCTION IN MINES","subpartHeading":"","text":null,"occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1725","heading":"Machinery and equipment; operation and maintenance.","id":"75.1725","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1725","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) Mobile and stationary machinery and equipment shall be maintained in safe operating condition and machinery or equipment in unsafe condition shall be removed from service immediately.\n\n(b) Machinery and equipment shall be operated only by persons authorized to operate such machinery or equipment.\n\n(c) Repairs or maintenance shall not be performed on machinery until the power is off and the machinery is blocked against motion, except where machinery motion is necessary to make adjustments.\n\n(d) Machinery shall not be lubricated manually while in motion, unless equipped with extended fittings or cups.\n\n[38 FR 4976, Feb. 23, 1973]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1403","heading":"Other safeguards.","id":"75.1403","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-O/section-75.1403","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"O","subpartHeading":"Subpart O—Hoisting and Mantrips","text":"[Statutory Provisions]\n\nOther safeguards adequate, in the judgment of an authorized representative of the Secretary, to minimize hazards with respect to transportation of men and materials shall be provided.","occurrenceCount":1},{"chapter":"I","heading":"Evaluation and revision of roof control plan.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.223","part":"75","subchapter":"O","subpart":"C","id":"75.223","citation":"30 CFR 75.223","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1731","heading":"Maintenance of belt conveyors and belt conveyor entries.","id":"75.1731","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1731","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) Damaged rollers, or other damaged belt conveyor components, which pose a fire hazard must be immediately repaired or replaced. All other damaged rollers, or other damaged belt conveyor components, must be repaired or replaced.\n\n(b) Conveyor belts must be properly aligned to prevent the moving belt from rubbing against the structure or components.\n\n(c) Materials shall not be allowed in the belt conveyor entry where the material may contribute to a frictional heating hazard.\n\n(d) Splicing of any approved conveyor belt must maintain flame-resistant properties of the belt.\n\n[73 FR 80616, Dec. 31, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.202","heading":"Protection from falls of roof, face and ribs.","id":"75.202","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.202","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"C","subpartHeading":"Subpart C—Roof Support","text":"(a) The roof, face and ribs of areas where persons work or travel shall be supported or otherwise controlled to protect persons from hazards related to falls of the roof, face or ribs and coal or rock bursts.\n\n(b) No person shall work or travel under unsupported roof unless in accordance with this subpart.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.362","heading":"On-shift examination.","id":"75.362","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.362","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) At least once during each shift, or more often if necessary for safety, a certified person designated by the operator shall conduct an on-shift examination of each section where anyone is assigned to work during the shift and any area where mechanized mining equipment is being installed or removed during the shift. The certified person shall check for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction.\n\n(2) A person designated by the operator shall conduct an examination and record the results and the corrective actions taken to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan. In those instances when a shift change is accomplished without an interruption in production on a section, the examination shall be made anytime within 1 hour after the shift change. In those instances when there is an interruption in production during the shift change, the examination shall be made before production begins on a section. Deficiencies in dust controls shall be corrected before production begins or resumes. The examination shall include: Air quantities and velocities; water pressures and flow rates; excessive leakage in the water delivery system; water spray numbers and orientations; section ventilation and control device placement; roof bolting machine dust collector vacuum levels; scrubber air flow rate; work practices required by the ventilation plan; and any other dust suppression measures. Measurements of the air velocity and quantity, water pressure and flow rates are not required if continuous monitoring of these controls is used and indicates that the dust controls are functioning properly.\n\n(3) On-shift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(b) During each shift that coal is produced, a certified person shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section along each belt conveyor haulageway where a belt conveyor is operated. This examination may be conducted at the same time as the preshift examination of belt conveyors and belt conveyor haulageways, if the examination is conducted within 3 hours before the oncoming shift.\n\n(c) Persons conducting the on-shift examination shall determine at the following locations:\n\n(1) The volume of air in the last open crosscut of each set of entries or rooms on each section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) The volume of air on a longwall or shortwall, including areas where longwall or shortwall equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.\n\n(3) The velocity of air at each end of the longwall or shortwall face at the locations specified in the approved ventilation plan.\n\n(4) The volume of air at the intake end of any pillar line—\n\n(i) Where a single split of air is used in the intake entry furthest from the return air course immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) Where a split system is used in the intake entries of each split immediately inby the split point.\n\n(d) (1) A qualified person shall make tests for methane—\n\n(i) At the start of each shift at each working place before electrically operated equipment is energized; and\n\n(ii) Immediately before equipment is energized, taken into, or operated in a working place; and\n\n(iii) At 20-minute intervals, or more often if required in the approved ventilation plan at specific locations, during the operation of equipment in the working place.\n\n(2) Except as provided for in paragraph (d)(3) of this section, these methane tests shall be made at the face from under permanent roof support, using extendable probes or other acceptable means. When longwall or shortwall mining systems are used, these methane tests shall be made at the shearer, the plow, or the cutting head. When mining has been stopped for more than 20 minutes, methane tests shall be conducted prior to the start up of equipment.\n\n(3) As an alternative method of compliance with paragraph (d)(2) of this section during roof bolting, methane tests may be made by sweeping an area not less than 16 feet inby the last area of permanently supported roof, using a probe or other acceptable means. This method of testing is conditioned on meeting the following requirements:\n\n(i) The roof bolting machine must be equipped with an integral automated temporary roof support (ATRS) system that meets the requirements of 30 CFR 75.209.\n\n(ii) The roof bolting machine must have a permanently mounted, MSHA-approved methane monitor which meets the maintenance and calibration requirements of 30 CFR 75.342(a)(4), the warning signal requirements of 30 CFR 75.342(b), and the automatic de-energization requirements of 30 CFR 75.342(c).\n\n(iii) The methane monitor sensor must be mounted near the inby end and within 18 inches of the longitudinal center of the ATRS support, and positioned at least 12 inches from the roof when the ATRS is fully deployed.\n\n(iv) Manual methane tests must be made at intervals not exceeding 20 minutes. The test may be made either from under permanent roof support or from the roof bolter's work position protected by the deployed ATRS.\n\n(v) Once a methane test is made at the face, all subsequent methane tests in the same area of unsupported roof must also be made at the face, from under permanent roof support, using extendable probes or other acceptable means at intervals not exceeding 20 minutes.\n\n(vi) The district manager may require that the ventilation plan include the minimum air quantity and the position and placement of ventilation controls to be maintained during roof bolting.\n\n(e) If auxiliary fans and tubing are used, they shall be inspected frequently.\n\n(f) During each shift that coal is produced and at intervals not exceeding 4 hours, tests for methane shall be made by a certified person or by an atmospheric monitoring system (AMS) in each return split of air from each working section between the last working place, or longwall or shortwall face, ventilated by that split of air and the junction of the return air split with another air split, seal, or worked-out area. If auxiliary fans and tubing are used, the tests shall be made at a location outby the auxiliary fan discharge.\n\n(g) Certification. (1) The person conducting the on-shift examination in belt haulage entries shall certify by initials, date, and time that the examination was made. The certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(2) The certified person directing the on-shift examination to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan shall:\n\n(i) Certify by initials, date, and time on a board maintained at the section load-out or similar location showing that the examination was made prior to resuming production; and\n\n(ii) Verify, by initials and date, the record of the results of the examination required under (a)(2) of this section to assure compliance with the respirable dust control parameters specified in the mine ventilation plan. The verification shall be made no later than the end of the shift for which the examination was made.\n\n(3) The mine foreman or equivalent mine official shall countersign each examination record required under (a)(2) of this section after it is verified by the certified person under (g)(2)(ii) of this section, and no later than the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(4) Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 26442, May 28, 1996, as amended at 68 FR 40138, July 7, 2003; 77 FR 20715, Apr. 6, 2012; 79 FR 24987, May 1, 2014]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.360","heading":"Preshift examination at fixed intervals.","id":"75.360","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.\n\n(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.\n\n(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:\n\n(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.\n\n(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.\n\n(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.\n\n(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.\n\n(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.\n\n(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,\n\n(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.\n\n(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.\n\n(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.\n\n(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.\n\n(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.\n\n(11) Preshift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:\n\n(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.\n\n(3) At the intake end of any pillar line—\n\n(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) If a split system is used, in the intake entries of each split immediately inby the split point.\n\n(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.\n\n(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.\n\n(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.402","heading":"Rock dusting.","id":"75.402","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.402","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"[Statutory Provision]\n\nAll underground areas of a coal mine, except those areas in which the dust is too wet or too high in incombustible content to propagate an explosion, shall be rock dusted to within 40 feet of all working faces, unless such areas are inaccessible or unsafe to enter or unless the Secretary or his authorized representative permits an exception upon his finding that such exception will not pose a hazard to the miners. All crosscuts that are less than 40 feet from a working face shall also be rock dusted.","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"1517232","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}