# Relationship history for MSHA mine 1514162

Current hierarchy: **Bates Worlie → Bates Construction → No 1 Surface Mine**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **controller_controls_mine:** Bates Worlie → No 1 Surface Mine; 1980-09-01 to current/open; source msha-controller-operator-history
- **operator_operates_mine:** Bates Construction → No 1 Surface Mine; 1983-08-01 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Bates Worlie → Bates Construction; 1983-08-01 to current/open; source msha-controller-operator-history
