# Relationship history for MSHA mine 1511010

Current hierarchy: **Bizzack John → Bizwil Inc → No 2 Surface Mine**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **controller_controls_mine:** Ford Winston Jr → No 2 Surface Mine; 1950-01-01 to current/open; source msha-controller-operator-history
- **controller_controls_mine:** Bizzack John → No 2 Surface Mine; 1974-01-01 to current/open; source msha-controller-operator-history
- **operator_operates_mine:** Winston Ford Company Inc → No 2 Surface Mine; 1977-10-01 to 1979-11-07; source msha-controller-operator-history
- **controller_controls_operator:** Ford Winston Jr → Winston Ford Company Inc; 1977-10-01 to 1979-11-07; source msha-controller-operator-history
- **operator_operates_mine:** Bizwil Inc → No 2 Surface Mine; 1979-11-08 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Bizzack John → Bizwil Inc; 1979-11-08 to current/open; source msha-controller-operator-history
