# Relationship history for MSHA mine 0505192

Current hierarchy: **Eagle Materials Inc → Raptor Materials LLC → Two Rivers**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **controller_controls_mine:** Eagle Materials Inc → Two Rivers; 2022-04-22 to current/open; source msha-controller-operator-history
- **operator_operates_mine:** Raptor Materials LLC → Two Rivers; 2024-05-15 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Eagle Materials Inc → Raptor Materials LLC; 2024-05-15 to current/open; source msha-controller-operator-history
