# Relationship history for MSHA mine 0301170

Current hierarchy: **Nelson Bobby D → B & D Construction Inc → Powers No 1 Strip**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **operator_operates_mine:** B & D Construction Inc → Powers No 1 Strip; 1975-10-01 to current/open; source msha-controller-operator-history
- **controller_controls_mine:** Nelson Bobby D → Powers No 1 Strip; 1975-10-01 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Nelson Bobby D → B & D Construction Inc; 1975-10-01 to current/open; source msha-controller-operator-history
